COUNCIL
MINUTES
Unconfirmed Minutes Ordinary Council Meeting
6:00pm 26 August 2025
Council Chamber (Level 1), Civic Centre,
23 Dundebar Road, Wanneroo
wanneroo.wa.gov.au
RECORDING AND ACCESS TO RECORDINGS OF COUNCIL MEETINGS POLICY
To be open and transparent regarding Council Meeting recordings and access to these recordings for members of the public and Council Members.
Objective
The objective of this policy is to ensure there is a process in place to outline the access to recorded Council Meetings.
Purpose
The purpose of this policy is to ensure that Council Members, the community, government bodies and other stakeholders are able to access recordings of the proceedings of Council meetings in compliance with the Local Government Act 1995 and associated Regulations.
This Policy applies to Council Members and employees of the City of Wanneroo.
The policy aligns with the following Strategic Community Plan Goal and Priorities:
Strategic Community Plan 2021-2031
Goal 7: A well-governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services.
Priority 7.2 – Responsibly and ethically managed. The City of Wanneroo will be managed responsibly to ensure a long-term, sustainable future. The City will have effective governance arrangements and ethical leadership that is open and transparent, ensuring a clear understanding of roles and accountabilities.
6.1. This Policy shall be printed within the Agenda of all Council Meetings, which include:
· Ordinary Council Meeting;
· Special Council Meeting;
· Annual General Meeting of Electors;
· Special Electors Meeting; and
· Agenda Briefing Session
to advise the public that the proceedings of the meeting are recorded.
Recording of Proceedings
6.2. Proceedings of Meetings detailed in this policy, as well as Deputations and Public Question Time during these meetings, shall be recorded by the City on audio and video recording equipment. Meetings and portions of Meetings taking place in closed session will be recorded on audio recording equipment.
6.3. No member of the public is to use any audio-visual technology or devices to record the proceedings of a Meeting, without the written permission of the Mayor or the Mayor’s Delegate.
6.4. Arrangements for the broadcast and recording of meetings conducted by electronic means under s14D of the Local Government (Administration) Regulations 1996 (the Regulations), for example in the situation of a public health emergency or state of emergency, will be made in compliance with ss.14H and 14I of the Regulations.
6.5. Arrangements for the recording of Meetings not held at the Council’s usual meeting place, or for the recording of Meetings in the event of a technological failure of the City’s recording equipment, will be made in compliance with ss.14I(2) to 14I(9) of the Regulations.
6.6. In compliance with the City’s approved Recordkeeping Plan and the State Records Act 2000, recordings made under this policy will be retained for the period specified in the General Retention and Disposal Authority for Local Government Information.
Access to Recordings
6.7. Recordings of Meetings made under this policy will be published via the City’s online channels no later than fourteen (14) days after the Meeting and will remain accessible for a minimum period of five (5) years after the Meeting date.
6.8. Members of the public may purchase a copy of the recorded proceedings or alternatively, listen to the recorded proceedings at the Civic Centre online once the recording is published on the City of Wanneroo website. Costs for providing a copy of the recorded proceedings to members of the public will include staff time to make the copy of the proceedings, as well as the cost of the digital copy for the recording to be placed on. The cost of staff time will be set in the City’s Schedule of Fees and Charges each financial year.
6.9. Council Members may request a copy of the recording of the Council proceedings at no charge.
6.10. All Council Members are to be notified when recordings are requested by members of the public or by Council Members.
The Policy is the responsibility of the Manager Corporate Governance & Council Services.
All disputes in regard to this policy will be referred to the Director Corporate Strategy and Performance in the first instance. In the event that an agreement cannot be reached, the matter will be submitted to the Chief Executive Officer for a ruling.
This policy will be evaluated and its effectiveness reviewed by the following key performance measures:
· All relevant meetings recorded;
· Acceptable quality of recordings captured; and
· Resolution of requests for copies of recordings within appropriate timeframes.
City of Wanneroo Recordkeeping Plan
Nil
COMMONLY USED ACRONYMS AND THEIR MEANING
|
Acronym |
Meaning |
|
|
|
|
ABN |
Australian Business Number |
|
|
|
|
ACN |
Australian Company Number |
|
|
|
|
Act |
Local Government Act 1995 |
|
|
|
|
CBP |
City of Wanneroo Corporate Business Plan |
|
|
|
|
CHRMAP |
Coastal Hazard Risk Management & Adaption Plan |
|
|
|
|
City |
City of Wanneroo |
|
|
|
|
CITS |
Department of Creative Industries, Tourism and Sport |
|
|
|
|
CPI |
Consumer Price Index |
|
|
|
|
DBCA |
Department of Biodiversity Conservation and Attractions |
|
|
|
|
DFES |
Department of Fire and Emergency Services |
|
|
|
|
DLGIRS |
Department of Local Government, Industry Regulation and Safety |
|
|
|
|
DOE |
Department of Education Western Australia |
|
|
|
|
DOH |
Department of Health |
|
|
|
|
DPLH |
Department of Planning Lands and Heritage |
|
|
|
|
DPS2 |
District Planning Scheme No. 2 |
|
|
|
|
DWER |
Department of Water and Environmental Regulation |
|
|
|
|
EPA |
Environmental Protection Authority |
|
|
|
|
GST |
Goods and Services Tax |
|
|
|
|
JDAP |
Joint Development Assessment Panel |
|
|
|
|
LTFP |
Long Term Financial Plan |
|
|
|
|
MRS |
Metropolitan Region Scheme |
|
|
|
|
MRWA |
Main Roads Western Australia |
|
|
|
|
POS |
Public Open Space |
|
|
|
|
PTA |
Public Transport Authority of Western Australia |
|
|
|
|
SAT |
State Administrative Tribunal |
|
|
|
|
SCP |
City of Wanneroo Strategic Community Plan |
|
|
|
|
WALGA |
Western Australian Local Government Association |
|
|
|
|
WAPC |
Western Australian Planning Commission |

Unconfirmed Minutes of Ordinary Council Meeting
held on Tuesday 26 August 2025
CONTENTS
Item 2 Apologies and Leave of Absence
Item 3 Public Question and Statement Time
PQ01-08/25 Mr P Firth, Wanneroo
PQ02-08/25 Mr P Firth, Wanneroo
PQ03-08/25 Mr B. Moore, Wanneroo
PQ04-08/25 Mr A. Murphy, Marangaroo
PQ05-08/25 Ms K. Cook, Wanneroo
PQ06-08/25 Mr N. Andrews, Butler
PQ07-08/25 Ms J. Payne, Wanneroo
PQ08-08/25 Ms A. Van Boek, Wanneroo
PQ09-08/25 Mr C. Stace, Wanneroo
PQ10-08/25 Ms J. Snape, Wanneroo
PQ11-08/25 Mr M. Wilden, Landsdale
Item 4 Confirmation of Minutes
OC01-08/25 Minutes of Ordinary Council Meeting held on 22 July 2025
Item 5 Announcements by the Mayor without Discussion
OA02-09/25 Leisure Institute of WA Awards – Wanneroo Aquamotion
Item 6 Questions from Council Members
CQ01-09/25 Cr Rowe - Kingsway Sport Club
Strategic Land Use Planning & Environment
AS01-08/25 Tender 25027 Design & Construction of Modular Changeroom at Kingsway Football Club
MN05-08/25 Cr Berry - Quinns Rocks Sports Club Accessibility
Infrastructure Capital Works (continued)
AS02-08/25 Tender 25132 Road and Drainage Upgrade Works at Mirrabooka Avenue and Kingsway
AS03-08/25 Tender 25128 - Construction Wangara Waste Transfer Station
AS05-08/25 Membership for the Waste Avoidance and Resource Recovery Advisory Committee
CP01-08/25 **Kingsway Football and Sporting Club Facility Change Room Upgrades
CP02-08/25 Community Facilities Planning Framework
CP03-08/25 ** Investigation into a Mountain Bike Trail in the Alkimos Area
Corporate Strategy & Performance
CS01-08/25 **Financial Activity Statement for the Period Ended 30 June 2025
Corporate Planning Performance & Improvement
CS02-08/25 Council Plan 2025-2035
CS03-08/25 Warrant of Payments for the Period to 30th June 2025
CE01-08/25 **Review of Council Members Continuing Professional Development Policy
CE02-08/25 **Review of the Attendance at Events Policy (Council Members and Chief Executive Officer)
CE03-08/25 Establishment of Chief Executive Performance Review Committee
CE04-08/25 **Review of District Boundaries
CE05-08/25 Council Member Attendance at the National Growth Areas Alliance 2025 National Congress
CE07-08/25 **Review of Council Members' Fees, Allowances, Reimbursements and Benefits Policy
Item 9 Motions on Notice (continued)
MN01-08/25 Cr Berry - Shared Zone Signs Mindarie
MN02-08/25 Cr Berry - Anchorage Drive Crossing
MN03-08/25 Cr Berry - Signage to Link Coast Paths in Mindarie
MN04-08/25 Cr Bedworth - Reconsider the proposed location for Changing Places facility in Clarkson
MN06-08/25 Cr Wright - Review of the City's Corporate Governance Framework
MN07-08/25 Cr Wright - ICT Device Buy Back
MN08-08/25 Mayor Aitken - Support of the ORIGINS Program
CR01-08/25 **Strategic Land Opportunity - Proposed Acquisition
**Indicates that changes and/or information has been added to the report following Agenda Briefing.
Mayor Aitken declared the meeting open at 6:05PM and read the prayer.
Good evening Councillors, staff, ladies and gentlemen, this meeting today is being held on Whadjuck Nyoongar Boodjar and I would like to acknowledge and pay my respects to Elders, past, present and future. I thank all past and present members of the community that have supported the City to better understand and value Nyoongar culture within the City of Wanneroo.
I invite you to bow your head in prayer:
Lord, We thank you for blessing our City, our community and our Council. Guide us all in our decision making to act fairly, without fear or favour and with compassion, integrity, wisdom and honesty. May we show true leadership, be inclusive of all, and guide all of the City’s people and many families to a prosperous future that all may share. We ask this in your name. Amen.
LINDA AITKEN, JP Mayor
Councillors:
ALEX FIGG North Ward
SONET COETZEE North Ward
GLYNIS PARKER North-East Ward
BRONWYN SMITH North-East Ward
MARIZANE MOORE Central-East Ward
PAUL MILES Central-East Ward
HELEN BERRY Central-West Ward
PHIL BEDWORTH Central-West Ward
JORDAN WRIGHT Central Ward
NATALIE HERRIDGE South-West Ward
VINH NGUYEN South-West Ward
JAMES ROWE, JP South Ward
EMAN SEIF, JP South Ward
Officers:
BILL PARKER Chief Executive Officer
JIM TAN Acting General Counsel
MARK DICKSON Director, Planning and Sustainability
GRANT CHETTLEBURGH Acting Director, Assets
KATHERINE HARRISON Acting Director, Corporate Strategy & Performance
KIRSTIE DAVIS Director, Community & Place
NICK STAWARZ Acting Director, Community & Place
BIMSARA PATHIRATHNA Chief Financial Officer
NICK STAWARZ Acting Director, Community & Place
ALYCE MARTIN Manager Corporate Governance & Council Services
MADONNA ILIFFE Coordinator Corporate Governance
YVETTE HEATH Acting Coordinator Council Services
DIANE HEBBARD Council Services Officer (Minutes)
CAS JENNINGS Council Services Officer
Item 2 Apologies and Leave of Absence
JACQUELINE HUNTLEY Central Ward (apology)
There were 23 members of the public and one member of the press in attendance.
Item 3 Public Question and Statement Time
Public Questions and Statements Received in Writing Prior to the Meeting
Public Questions and Statements Received During the Meeting
|
Statement
Having recently researched the latest signage policy for the City of Wanneroo and with another election looming, I am pleased that Ranger Services have confirmed the policy has been updated. There should be no confusion for candidates in future elections, federal, state, nor local, sitting members, nor new candidates. Clause 16 of the Signs Local Law clearly states “A person shall not erect, maintain or display a sign or hoarding or suffer or permit a sign or hoarding to be erected maintained or displayed or to remain on any land or building part (l) on any street, thoroughfare or other public place if the sign is an election sign.”
I commend the City and those involved in this change. Hopefully, the City of Wanneroo staff will be assisted in the policing of the policy during elections and that sitting members up for election and new candidates will be clearly informed of the regulations and penalties and shall adhere to said policy and I'd like to see other Councils follow suit.
Response by Mayor Aitken
I have a question about that because there is advice, and I understand that election signage is to be allowed?
Response by Acting Director, Community & Place
Question taken on notice. There was some advice obtained in the lead-up to the last election around the enforcement of election signage and as far as I am aware Ranger Services enforce the local law as it is currently written.
Further response by Acting Director, Community & Place
Election signs are permitted on private property, provided they comply with the requirements of the City’s Signs Local Law. Although the Local Law contains provisions restricting election signs on streets, thoroughfares and other public places, these restrictions have been found to be invalid under common law decisions that protect freedom of political speech. The City has received legal advice confirming it still has authority to remove election signs from public property if they are considered unsafe, if they are placed too early (more than 28 days before the election), or remain in place for too long (more than 7 days after the election).
|
|
Statement
Being heavily involved with the Kingsway Football Club, many of you will know me from my emails and granted I can be fairly brutal or fairly passionate, but I want to give a huge kudos to the entire Council.
Due to the recent weather the ovals have copped an absolute pounding. Our club has been very successful and finished on top of the A grade. It probably would not be possible without the grounds being in the condition they are in. The support that we get from everyone has been huge, to the point where even in the off season covering the cricket pitch and everything else, it just goes a long way.
We have had many clubs visit our facility in the last three weeks and have mentioned how lucky we are as a community football club to have such a supportive Council. So I just wanted to give kudos on that and with the proposed upgrades for our facility. Our first ever women's team competed and is competing in the finals this weekend. They have got 48 members for one team in their very first year and nearly 30 more will join next season. Our junior girls are growing through the roof and the facilities could not have come soon enough. Thank you |
Item 4 Confirmation of Minutes
Item 5 Announcements by the Mayor without Discussion
Item 6 Questions from Council Members
Nil
Mayor Aitken advised that UP02-07/25 Closure of Public Access Way, Rupara Circle Quinns Rocks recorded in the July 22 Ordinary Council Minutes stated a report would come to this meeting, but that report will now go to the September meeting.
|
Cr Wright presented a petition consisting of 1110 signatures (173 who identified as residents), requesting that the area from Ariti Avenue to Nevill Drive remain off leash with dogs under effective control. (25/251563)
Update
A report prepared in response to this petition is proposed to be presented at the Ordinary Council Meeting on 25 November 2025. |
Adoption by Exception
Moved Cr Rowe, Seconded Cr Herridge
Pursuant to clause 5.2 of the Standing orders Local Law 2021 the following reports are voted en bloc
· PS01-08/25
· PS02-08/25
· AS01-08/25
· AS04-08/25
· CS03-08/25
· CS04-08/25
Carried Unanimously
*14/0
For the
motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Cr Herridge, Cr Miles, Cr Moore, Cr Nguyen, Cr Parker, Cr Rowe,
Cr Seif, Cr Smith and Cr Wright
Against the motion: Nil
Declarations of Interest by Council Members, including the nature and extent of the interest. Declaration of Interest forms to be completed and handed to the Chief Executive Officer.
Cr Miles declared an impartiality interest in AS06-08/25 due to being a representative for the City of Wanneroo on the Mindarie Regional Council.
Cr Wright declared an impartiality interest in AS06-08/25 due to being a representative for the City of Wanneroo on the Mindarie Regional Council
Cr Berry declared a financial interest in CE01-08/25 due to having a financial interest in the matter.
Cr Rowe declared a financial interest in CE01-08/25 due to having a financial interest in the matter.
Cr Figg declared an indirect financial interest in CE04-08/25 due to being an employee of the Minister for Local Government in portfolios separate to the Local Government portfolio.
Cr Rowe declared a financial interest in CE05-08/25 due to being a delegate of NGAA Conference and seeking re-imbursement.
Cr Smith declared an impartiality interest in CE06-08/25 due to being a member of the Western Australia Local Government Association State Council and one of the persons referenced in the item to attend the conference.
Cr Bedworth declared an impartiality interest in MN01-08/25 due to being an employee of Main Roads Western Australia.
Cr Bedworth declared an impartiality interest in MN02-08/25 due to being an employee of Main Roads Western Australia
Cr Bedworth declared an impartiality interest in MN05-08/25 due to being a member of Quinns Rocks Sports and Social Club.
Cr Berry declared an impartiality interest in MN05-08/25 due to being a member of the Quinns Rocks RSL and the Quinns Rocks Sports and Social Club
Cr Miles declared an impartiality interest in MN05-08/25 due to being a member of Quinns Rocks Sports and Social Club.
Strategic Land Use Planning & Environment
PS01-08/25 Proposed Amendment No. 226 to District Planning Scheme No. 2 (DPS 2) – Lot 17 (41) Knight Road, Gnangara
File Ref: 51253 – 25/145926
Responsible Officer: Director Planning & Sustainability
Attachments: 4
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To consider a request to amend District Planning Scheme No. 2 (DPS 2) by including the use class ‘Warehouse/Storage’ as an Additional Use on Lot 17 (41) Knight Road, Gnangara (the subject site).
|
Applicant |
CF Town Planning & Development |
|
Owner |
Christopher Bernard Lippi |
|
Location |
Lot 17 (41) Knight Road, Gnangara |
|
Site Area |
4.0737 Hectares |
|
MRS Zoning |
Rural – Water Protection, Rural |
|
DPS 2 Zoning |
Rural |
Background
On 15 January 2024, the City received advice that the landowner of the subject site was undertaking activities on their land without the required development approvals. An investigation by Administration determined that these included storing significant amounts of building materials and parking caravans on the subject site. In DPS 2, these uses, which align to the ‘Warehouse/Storage’ and ‘Car Park’ definitions are both ‘X’ (not permitted) uses in the Rural zone.
The parking of caravans is not subject to this proposed scheme amendment as the landowner has committed to, and has already commenced, removing these from the subject site. Administration will continue to liaise with the landowner to assist them to achieve compliance in relation to removing these vehicles.
In relation to storing materials, Administration met with the landowner to discuss the unauthorised use and the options available to them. These include ceasing the use or proposing an amendment to DPS 2 for Council’s consideration to allow the use class ‘Warehouse/Storage’ as an Additional Use on the subject site. Accordingly, on 11 September 2024, CF Town Planning & Development (the applicant), on behalf of the landowner, lodged Amendment No. 226 to DPS 2.
Detail
Site
The subject site is 4.0737 hectares and is located at Lot 17 (41) Knight Road, Gnangara. The subject site comprises of a single house and a number of single house additions including sea containers, patios and outbuildings. Currently the site is used for residential purposes, the parking of vehicles and storage of building materials.
The subject land contains scattered vegetation throughout, with the rear portion of the lot being relatively undisturbed.
Zoning
The subject site is zoned ‘Rural – Water Protection’ and ‘Rural’ under the Western Australian Metropolitan Region Scheme (MRS) and ‘Rural’ under the DPS 2.
Properties directly surrounding the subject site are zoned ‘Rural – Water Protection’ and ‘Rural’ under MRS and ‘Rural’ and ‘Rural Residential’ under DPS 2. Plans showing the location of the subject site and current zoning under DPS 2 are included as Attachment 1 and Attachment 2 respectively.
‘Warehouse/Storage’ is defined in DPS 2 as ‘premises including indoor or outdoor facilities used for –
a) the storage of goods, equipment, plant or materials; or
b) the display or sale by wholesale of goods.’
Future Land Use
The subject site is located within Precinct 20 of the East Wanneroo District Structure Plan (EWDSP) and will form part of the ‘Suburban Neighbourhood’ precinct. Precinct 20 is located within ‘Stage 3’ of the EWDSP staging plan, with redevelopment anticipated to occur from 2051 and beyond as seen in Attachment 3. This timeframe is indicative and will depend upon constraints and planning processes associated with the implementation of the EWDSP.
Land Use and Operations
The storage of building materials operates from approximately 1730m2 area of hardstand located behind the building line of the main dwelling, and setback 57 metres from the street boundary. The applicant has outlined that the use entails the following:
· The storage of building (scaffolding), which has been stored on-site for over 12 years, without any concerns being raised or had an impact on any adjoining properties;
· The storage used for servicing by a 6-metre long truck owned by the landowner undertaking approximately three deliveries/vehicle movements per week, with some weeks having no movements; and
· The use being undertaken as part of the landowner of the subject site’s business with no additional staff proposed on site.
The purpose of this proposed scheme amendment is to allow the landowner to utilise 1730m2 of the site to store scaffolding and building materials that are associated with his business. This proposed amendment seeks to formalise the existing unauthorised use to operate lawfully until an alternative location can be secured or until the land is ready for urban development.
This proposal seeks to amend DPS 2 by:
a) Introducing ‘Warehouse/Storage’ as an ‘Additional Use’ on Lot 17 (41) Knight Road, Gnangara, and amending Schedule 2 – Specified Additional Uses For Zoned Land in Scheme Area (Clause 3.4), as follows:
|
No |
Street/Locality |
Additional Use |
Conditions |
|
A51 |
Lot 17 (41) Knight Road, Gnangara |
Warehouse/storage |
1. The ‘Warehouse/Storage’ is to be advertised in accordance with an “A” use.
2. To expire within 3 years of the date the subject land is gazetted ‘Urban’ under the Metropolitan Region Scheme.
3. The ‘Warehouse/Storage’ use shall be associated with a single dwelling on the land.
4. The ‘Warehouse/Storage’ area shall be operated by the landowner/occupier of the dwelling and not sub-leased.
5. The area of ‘Warehouse/Storage’ shall be limited to 1,730m2 and located behind the front building line of the existing dwelling on the land. |
b) Amend the Scheme Map accordingly.
Attachment 4 contains the amendment plan showing the existing and amended zoning.
Consultation
The proposed amendment to DPS 2 is considered a “complex amendment” in accordance with Part 5 – Division 1 of the Planning and Development (Local Planning Schemes) Regulations 2015 for the following reason:
· An amendment relating to development that is of a scale, or will have an impact, that is significant relative to development in the locality.
The Regulations require a complex amendment to be referred to the Western Australian Planning Commission within 21 days after the day on which a resolution is made.
In addition, the amendment will be referred to the Environmental Protection Authority (EPA) to assess the environmental impacts of the proposal and determine whether any formal environmental assessment is necessary.
Subject to the approval of the Commission and the EPA the complex amendment will be advertised for public comment for a period of 60 days. Advertising will be undertaken consistent with the requirements of the Planning and Development (Local Planning Schemes) Regulations 2015, by way of:
· Advertisement in a local newspaper;
· Placement of a sign on the subject site, giving notice of the proposal;
· Display notice of the proposal in Council offices;
· Display on the City’s website; and
· Referral in writing to affected persons/agencies.
Comment
Applicant’s justification
The applicant’s justification for the proposal can be summarised as follows:
· The additional use for the subject land is limited, both in terms of the proportion of the lot that it will occupy and the length of time that it will occur for (being 3 years after the land is rezoned to Urban under the MRS) which will not undermine the future strategic planning for the area envisaged by the EWDSP;
· The additional use for the subject land will enable the landowner to continue operating their family business until such a time as the land can be sold or developed for urban purposes in the future in accordance with the EWDSP;
· The business is an occupation/income for the existing landowner and that the minor area used for storage is vital for the business;
· The area being set aside for storage purposes on the subject land is relatively small and well setback from the lot boundaries. As such, the use will not have an adverse impact on the adjoining property and/or the streetscape, nor will it undermine the rural character of the area. This is reinforced by a condition limiting the size and location of the storage area; and
· Amendment No.170 recognised the future change to the East Wanneroo area being introduced by the EWDSP and the changing nature of the area from rural development to ultimately urban development. Given this, the additional use (A40) has been conditioned to cease within 3 years of the date of the land being gazetted ‘Urban’ under the MRS. The same approach can be applied to this scheme amendment given the similarities between Amendment No.170 and this scheme amendment, in that:
i. Both lots have a rural zoning under the City’s DPS 2;
ii. The use of the land is for storage;
iii. Both lots are located within the EWDSP area and will change from ‘Rural’ to ‘Urban under the MRS; and
iv. The proposed ‘Additional Use – Warehouse/Storage’ is not considered to prejudice future planning given the inclusion of a time limited approval.
Amendment No. 170
On 17 September 2018, the City received Amendment No. 170 to DPS 2 which sought to introduce an additional use of ‘Storage Yard’ at Lot 31 (90) Rousset Road, Jandabup (Lot 31) which is zoned Rural under DPS 2. Whilst Administration’s recommendation was not to support Amendment No. 170 as the use was not compatible with the Rural zone’s objectives, it was supported by Council and ultimately approved by the Minister for Planning and gazetted on 8 May 2020. As the property is located within the area subject to the EWDSP in Precinct 7, a condition was included for the additional use to expire three years after the land is transferred to the ‘Urban’ zone under the MRS. Following the City’s Amendment No. 172, which sought to align the City’s DPS 2 with the State Government Model Provisions, this use was changed to ‘Car Park’ given that the predominant activities occurring on Lot 31 was to park vehicles. The ‘Car Park’ use on Lot 31 is currently still operating.
East Wanneroo District Structure Plan
The applicant recognises that the land is identified to transition into a suburban neighbourhood in the long term, and that the ‘Warehouse/Storage’ use is not consistent with the area’s planned urbanisation. The applicant’s proposed condition for the additional use to expire three years after the land is transferred to the ‘Urban’ zone under the MRS is the same condition that forms part of Amendment No. 170 however, Administration considers this proposed scheme amendment to differ from Amendment No. 170.
The land subject to Amendment No. 170 forms part of the EWDSP’s Precinct 7 and is anticipated to be urbanised between 2021 to 2031 whilst the land subject to this proposed Amendment is anticipated to be urbanised beyond 2051. This means that the use will remain on the site for significantly longer than Amendment No. 170. It is noted that a local structure plan for Precinct 7 has already been prepared and is currently being assessed by the State Government. It is also expected that the State Government will lift the Urban Deferment of Precinct 7 imminently.
Therefore, whilst the temporary use of the subject site for storage purposes will not undermine the strategic vision for the area depicted in the EWDSP, the proposed land use will remain inconsistent with the objectives of the current Rural zone for a considerable time.
Rural zoning objectives
The objectives of the Rural zone as per DPS 2 are:
i) To provide for the maintenance or enhancement of specific local rural character.
ii) To protect broad acre agricultural activities such as cropping and grazing and intensive uses such as horticulture as primary uses, with other rural pursuits and rural industries as secondary uses in circumstances where they demonstrate compatibility with the primary use.
iii) To maintain and enhance the environmental qualities of the landscape, vegetation, soils and water bodies, to protect sensitive areas especially the natural valley and watercourse systems from damage.
iv) To provide for the operation and development of existing, future and potential rural land uses by limiting the introduction of sensitive land uses in the Rural zone.
v) To provide for a range of non-rural land uses where they have demonstrated benefit and are compatible with surrounding rural uses.
Administration has considered this proposal against the Rural zone’s objectives and does not consider it to align with these. The applicant has referred to the proposed use that is compatible with the surrounding area and will not impact the existing vegetation on the land, is screened and will not impact the rural character of the area. However, Administration does not support the applicant’s justification for the following reasons.
The objectives of the Rural zone favour rural activities occurring in the area. The ‘Warehouse/Storage’ land use is not rural in nature but rather industrial. Whilst it is not permitted (X) in the Rural zone, it is capable of approval in both the General Industrial and Light Industry zones in DPS 2. Administration considers that the ‘Warehouses/Storage’ use neither maintains nor enhances the rural character and amenity of the area as it is a land use reflective of an Industrial nature. The use of the land as a ‘Warehouses/Storage’ is not considered to align with the rural character or objectives of the Rural Zone.
There is available existing land within the City that is already zoned for this type of activity, including the Industrial precincts of Neerabup and Wangara, which is located approximately 11.5km and 1.6 kilometres from the subject site. Since the gazettal of Amendment No. 172 on 5 May 2023, which introduced the ‘Warehouse/Storage’ land use, the City has approved approximately 60 applications for ‘Warehouses/Storage’ in its industrial zones. This demonstrates that there is an existing demand for this type of land use which is currently being met in industrial areas.
Administration considers that supporting this proposal could set an undesirable precedent in the City, which could face increased pressure to support more industrial uses in rural areas. An audit by Administration found that there are currently three active compliance investigations for the “Warehouses/Storage” land use in the EWDSP area. Approving this proposed scheme amendment for an industrial use in a rural area could lead to other businesses relocating to rural areas with the intention to undertake similar activities.
Approval of the ‘Warehouses/Storage’ use, even for a limited time and with size restrictions, will always result in it being inconsistent with the amenity and core character expected of the Rural zone. Exploiting the transitional nature of the EWDSP to support industrial uses in rural areas, especially for areas not intended to be urbanised until the long-term, is not supported by Administration.
City of Wanneroo Local Planning Strategy (Draft)
At its Ordinary Meeting on 27 May 2025, Council approved the draft Local Planning Strategy (draft Strategy) for submission to the WAPC. The draft Strategy is currently with the WAPC for consideration and final approval. The draft Strategy recognises there has been increased demand for the parking and storage of caravans, boats, and trailers on rural properties. This has been driven by decreases in residential lot sizes which has resulted in residents being less capable of parking such vehicles at their homes due to the lack of standalone ‘Car Park’ land use in the industrial zoned areas. When stored in residential areas for longer periods caravans, boats, and trailers can cause amenity issues, reduce the visual appeal of streets and obstruct footpaths, driveways and parking bays. As such, the draft Strategy currently supports the additional of a ‘Car Park’ land use in the Rural zone. Administration considers that this should not be mistaken or applied onto any other land use.
The draft Strategy does not recognise any demand or shortfalls that would justify consideration of any other additional uses in Rural zones. As outlined earlier, there are approximately 60 applications that have been approved for the “Warehouse/Storage’ land use in the City’s industrial areas in just two years alone. This demonstrates that there is an existing demand for this type of land use which is being suitably accommodated within the permitted zones.
State and Local Planning Policies
Administration has reviewed the proposal against the relevant State and local planning policies and provides the following advice regarding its adherence to these policies.
· State Planning Policy 2.2: Gnangara groundwater protection (SPP 2.2) and State Planning Policy 2.7: Public drinking water source (SPP 2.7)
SPP 2.7 and SPP 2.2 both seek to protect and manage public drinking water source areas from incompatible land uses by identifying levels of risk that land uses could present to the groundwater resource. The subject site is located within a Priority 2 area in both SPP 2.2 and SPP 2.7. The protection of public water supply sources is a high priority in Priority 2 areas.
In accordance with SPP 2.7 and SPP 2.2, the proposed land use is “incompatible” in a Priority 2 areas, unless special circumstances apply. These generally include providing detailed information and evidence of unsuccessful endeavours to locate the land use elsewhere and detailing site-specific information about the extent of the land uses and the risks to water quality and public health. Land use may be considered to be compatible if they are directly associated with a primary industry (i.e. cropping, livestock) that is compatible or acceptable within the applicable priority area.
A ‘Warehouse/Storage’ land use is not associated with a primary industry and appropriately zoned land exists within close proximity to the subject site that is able to cater for this type of activity. As such, the proposed land use of Warehouse/Storage is not considered to satisfy these policy requirements.
· State Planning Policy 2.5: Rural Planning (SPP 2.5)
SPP 2.5 seeks to support primary production and basic raw material extraction, protect existing rural land and manage the impacts of any zoning proposals on the surrounding area. Administration has provided its recommendations regarding this proposal’s adherence to comply the Rural zone’s objectives. Further to this, Administration does not consider the proposal to align to the objectives of SPP 2.5 which focus on supporting and protecting rural land for rural land use activities. It is considered that the proposal could set a precedent for more landowners to relocate to rural areas, where land rates are generally less than industrial areas, to undertake industrial land uses.
· Local Planning Policy 5.3: East Wanneroo (LPP 5.3)
LPP 5.3 was prepared to guide consideration of planning proposals including amendments to DPS 2, for urban or similar development proposals received in the East Wanneroo area. The overriding principle of LPP 5.3 is that there shall be a general presumption against planning proposals that may detrimentally impact the orderly and proper planning of the area. LPP 5.3 also requires consideration of the likely impact of applications on the existing surrounding area.
Whilst is it acknowledged that the Warehouse/Storage is proposed to be time limited, Administration considers that the operation of the Warehouse/Storage use, particularly until 2051, is considered too significant and not an appropriate form of ‘interim’ development, given that the land use is industrial in nature, appearance and operation. A Warehouse/Storage is considered to detrimentally impact the Rural area as the land use is neither consistent with the current Rural zoning nor the future urban zoning of the land regardless of whether a time limitation is proposed or not.
The proposed amendment is therefore considered to be inconsistent with LPP 5.3 as the use has the potential to result in amenity impacts on both the adjoining landowners and the locality until the area is urbanised, which does not align with LPP 5.3.
Conclusion
The proposed request to amend DPS 2 by introducing an additional use of Warehouse/Storage at the subject site has been assessed against the relevant legislation and planning framework and Administration has considered Council’s previous decision to advertise Amendment No. 170 to DPS 2. Whilst it is considered that the use will not prejudice the future urbanisation of the EWDSP, Administration considers that the proposal does not comply with the objectives of the Rural zone, which is anticipated to remain in place until at least 2051. Therefore, should approval be granted for the additional use of Warehouse/Storage, it will undermine the objectives of the Rural zone.
The Warehouse/Storage land use neither maintains nor enhances the rural character and amenity of the area as it’s reflective of an industrial area, not a rural area. Administration considers that support of the proposal, even for a limited timeframe and size, will set an undesirable precedent to support other similar industrial uses to establish in rural areas. Administration maintains that the anticipated implementation timeframes in EWDSP should not be the test for whether a scheme amendment located within any of the EWDSP is appropriate, especially one that is located in Stage 3.
The Industrial precinct in Neerabup and Wangara, the latter of which is located approximately 1.6 kilometres from the subject site is considered to be an appropriate location for this type of use. There is no shortage of industrial land to facilitate this use as the 60 approvals that the City has granted for this use in industrial areas in the past two years has demonstrated. The City’s draft Local Planning Strategy also does not recognise any demand or shortages for a Warehouse/Storage use in the Rural zone. It is therefore not appropriate to continue the unauthorised use of Warehouse/Storage given its industrial purpose and nature in a Rural area.
Therefore, it is recommended that Amendment No. 226 is not supported. Should Council endorse Administration’s recommendation to not support this proposal, Administration will initiate compliance action to remove the unauthorised development.
Statutory Compliance
The scheme amendment will follow the statutory process outlined in the Planning and Development (Local Planning Schemes) Regulations 2015.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
5 ~ A well planned, safe and resilient City that is easy to travel around and provides a connection between people and places
5.2 - Plan for and manage land use
Risk Appetite Statement
In pursuit of strategic objective goal 5, we will accept a Medium level of risk, extended to High in the areas of Community / Reputation & Financial / Commercial impacts. Shifting transport modes and usage in the City may require short term pain for longer term gain as the City supports the development, maintenance and connection of alternatives to car use (e.g. cycle ways) and the supporting infrastructure.
Risk Management Considerations
There are no existing Strategic or Corporate risks within the City's existing risk registers which relate to the issues contained in this report.
Policy Implications
This proposal has been assessed in accordance with the provisions of the Planning and Development (Local Planning Schemes) Regulations 2015, the East Wanneroo District Structure Plan and State Planning Policy 2.5: Rural Planning, State Planning Policy 2.2: Gnangara groundwater protection, State Planning Policy 2.7: Public drinking water source, and Local Planning Policy 5.3: East Wanneroo (LPP 5.3).
Financial Implications
Nil
Voting Requirements
Simple Majority
Attachments:
|
1⇩. |
Attachment 1 - Location plan |
25/202898 |
|
|
2⇩. |
Attachment 2 - Zoning plan |
25/202909 |
|
|
3⇩. |
Attachment 3 - EWDSP |
25/203712 |
|
|
4⇩. |
Attachment 4 - Proposed Amendment |
25/202937 |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Approval Services
PS02-08/25 Consideration of Amendment No. 222 Following Advertising - Normalisation of Land in the Jindalee North Agreed Local Structure Plan No. 88 Area
File Ref: 49920 – 25/189664
Responsible Officer: Manager Health & Compliance
Attachments: 9
Previous Items: PS01-07/24 - Preparation of Amendment No. 222 to District Planning Scheme No. 2 - Normalisation of Land in the Jindalee North Agreed Local Structure Plan No. 88 Area - Ordinary Council - 16 Jul 2024
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
For Council to consider:
· Amendment No. 222 to the City’s District Planning Scheme No. 2 (DPS2) following a public advertising period; and
· Requesting the Western Australian Planning Commission (WAPC) perform consequential amendments to the City’s Jindalee North Agreed Local Structure Plan No. 88 (ASP 88);
Background
Amendment No. 222 applies to land within the Eden Beach estate, Jindalee and Alkimos, where ASP 88 currently guides subdivision and development (subject area). ASP 88 was initially adopted in January 2014, with the current ASP 88 structure plan maps included as Attachment 1.
The subject area is largely zoned Urban Development under DPS2 (refer Attachment 2), an interim zoning applied to areas undergoing subdivision and development. Much of the subject area is built out, meaning the subdivision and development of the built-out areas no longer require the guidance of a structure plan. Therefore, it is necessary to now move planning controls for these built out areas out of ASP 88 and into DPS2 (through Amendment No. 222). As detailed in this report, the zoning, density codings and reservations to be put into DPS2 through Amendment No. 222 correspond with what has been developed in the subject area, as guided by ASP 88.
This process of normalising structure planned areas is part of the City’s ongoing approach to simplify the planning system and reduce complexity for the City’s stakeholders. Normalisation makes it simpler for landowners to understand the relevant planning controls for their property by reducing the number of planning documents relevant to the decision-making process. This aligns with the City’s goal to provide for well-planned land uses to support the economy, the growing community and environment.
Council initiated Amendment No. 222 on 16 July 2024 (PS01-07/24), as outlined in Attachment 3.
Detail
Amendment No. 222 proposes the following zoning changes to the DPS2 map (refer Attachment 4):
· Rezoning established residential lots from Urban Development to Residential. Density codes will generally reflect those in ASP 88 – as well as density codings approved by the WAPC through subdivision, as consolidated on the R-Code Plan in Attachment 5.
· Rezoning Lot 516 (36) Marlinspike Boulevard, Jindalee (with an established child care centre) from Urban Development to Commercial. A density coding of R60 will also be applied, consistent with what was approved by the WAPC through subdivision.
· Reclassifying public open space, conservation, road reserves, and utility sites as Local Scheme Reserves.
Amendment No. 222 does not affect land parcels which are still pending or earmarked for further subdivision.
As discussed in the Consultation section below, the Department of Planning, Lands and Heritage (DPLH) advised Administration on 22 April 2025 that Amendment No. 222 was approved for advertising. Prior to that approval being granted, the DPLH required the City to make a minor modification to the Amendment No. 222 proposal as it was initiated by Council on 16 July 2024 (PS01-07/24).
Attachment 4 provides the advertised version of Amendment No. 222 – whilst incorporating track changes to demonstrate the minor modification required prior to advertising. As discussed later in the report, further modifications to the Amendment No. 222 proposal are recommended following submissions received during advertising.
Administrative Amendments to affected Local Structure Plans
Regulation 35A of the Planning and Development (Local Planning Schemes) Regulations 2015 (Regulations) allows the City to pursue amendments to structure plans through the Scheme amendment process. Through the Regulations, amendments to structure plans are required to be outlined in a ‘Regulation 35A Statement, accompanying a Scheme amendment.
Attachment 6 provides the Regulation 35A Statement that was prepared to coincide with Amendment No. 222. Amendments to ASP 88 seek to make consequential changes to the structure plan text and maps to align with the updated zoning.
The DPLH also required modifications to the Regulation 35A Statement before advertising, which are outlined as track changes in Attachment 6. As discussed later in the report, the modifications recommended to the Amendment No. 222 proposal require further changes to the structure plan amendment mapping within the Regulation 35A Statement.
Consultation
Following Council’s 16 July 2024 resolution, Amendment No. 222 was:
· Referred to the Environmental Protection Authority (EPA) for assessment, which confirmed on 29 August 2024 that a formal assessment under Part IV of the Environmental Protection Act 1986 was not required.
· Approved for public advertising by the DPLH (on behalf of the Minister for Planning) on 22 April 2025, following modifications (refer Attachment 4).
· Advertised from 8 May to 20 June 2025, including:
o Notices on the City’s website;
o Copies made available for public inspection at the City’s Civic Centre.
o Notices in the 8 May 2025 edition of the Perth Now – Wanneroo newspaper.
o Direct letters to affected landowners and occupiers.
The City received six submissions on the Amendment No. 222 proposal – with one submitter objecting, two providing comments and three providing no detailed comment. A summary of all the submissions received, with Administration’s responses, is provided in Attachment 7. Key issues raised in the submissions are discussed further in the Comment section below.
Comment
Child Care Premise Site on Reflection Boulevard
A submission was received from a local resident objecting to the existing child care premise on Lot 516 (36) Marlinspike Boulevard, Jindalee (on the corner of Reflection Boulevard) someday being converted into a fast-food restaurant or takeaway. The objecting resident particularly expressed that any conversion of land use on Lot 516 could increase traffic on the local road network.
The location of Lot 516 is provided where shown in Attachment 2. ASP 88 already designates Lot 516 as a Commercial zone. Consistent with ASP 88, Amendment No. 222 also proposes to apply the Commercial zoning into DPS2 over Lot 516.
It should be noted that:
· The preparation of Amendment No. 222 should not affect the operations of the current child care premise on Lot 516; and
· If the City had not prepared Amendment No. 222 - and Lot 516 remained in the Commercial zone designated by ASP 88 – a conversion of the land use on this lot (to fast food or other commercial use) could potentially have occurred regardless.
In addition, a traffic report prepared to support ASP 88 at the time of its approval demonstrates that the local roads can cater for forecasted traffic volumes based on a Commercial Zone being applied to Lot 516. Traffic generation can also be further considered by the City if the land use on Lot 516 were to change in the future.
In light of the above, no modification to change what Amendment No. 222 is proposing for Lot 516 is recommended.
Vacant School Site
The subject area contains one vacant primary school site in the ownership of the Department of Education at Lot 8009 (40) Ranella Street, Jindalee. This school site is located where shown in Attachment 2.
Although ASP 88 identifies Lot 8009 as a primary school site, Administration initially considered it appropriate to retain the Urban Development Zone over this land, to allow ASP 88 to guide future planning of the site. If a school was not needed in the future, amending a structure plan to facilitate a different land use (e.g. residential) would be a less timely and more straightforward process than amending DPS 2 for the same purpose.
Acknowledging Administration’s opinion on this, the Department of Education has requested in their submission (refer Attachment 7) that the Urban Development Zone on Lot 8009 change to a local scheme reserve to cater for a future school. The Department of Education confirmed that a school will be provided on Lot 8009 once there is a suitable residential catchment.
Administration recommends that Amendment No. 222 be modified to apply the ‘Public Purposes’ local scheme reserve over this lot. A modified version of Amendment No. 222 for Council’s consideration, incorporating the change affecting Lot 8009, is provided in Attachment 8.
Zoning of Eden Beach Land Sales Office Site
The Eden Beach sales office site straddles across multiple lots created for residential development on Reflection Boulevard, Jindalee – and is located where shown in Attachment 2. Given the lots are created, Amendment No. 222 proposed to apply the Residential zoning over these lots (consistent with ASP 88), with a density coding of R60.
A submission received on behalf of the Eden Beach project managers opposed the rezoning of these lots – but rather sought for the land remain in the Urban Development zone and guided by ASP 88. It was considered by the submitter that the normalisation of this land may constrain future development or re-subdivision of that land.
Noting the concerns of the submitter, Administration agrees that a modification to retain the Urban Development zone over the sales office land could be supported. This modification should not compromise further development of the land in question, or create any other planning issue.
A modified version of Amendment No. 222 for Council’s consideration, incorporating the retention of the Urban Development zoning over the Eden Beach land sales office, is provided in Attachment 8.
Regulation 35A Statement Amendments
The Regulation 35A process to amend ASP 88 following approval of Amendment No. 222 will complete the normalisation process for the subject lots that are established, by providing a planning framework that is streamlined and aligned. As outlined above, the Regulation 35A Statement that was incorporated into the Amendment No. 222 proposal (and as advertised) is included as Attachment 6.
The advertised Regulation 35A Statement includes structure plan amendment mapping that identifies areas which are being rezoned through Amendment No. 222. However, as outlined above, modifications to the Amendment No. 222 proposal change the extent of the land that will be rezoned. The changes to the Scheme mapping therefore require coinciding adjustments to the structure plan amendment mapping. As such, a revised Regulation 35A Statement, incorporating updated mapping, has been prepared for Council’s deliberations and is included as Attachment 9.
Impact on Developer Contributions and Future of the Structure Plan
The subject area is situated within developer contribution
area ‘DCA 4’ relating to the Clarkson and Butler area, as indicated
on the Scheme Map extract provided in
Attachment 2.
Amendment No. 222 does not seek to amend any of the DPS2 provisions pertaining to DCA 4 – nor change the extent of the developer contribution area as shown on the Scheme Map. Therefore, what Amendment No. 222 is proposing should not affect the developer contribution arrangements in place.
Extension of ASP 88 Approval Period
Under Clause 28 of the deemed provisions, structure plans have a default lifespan of ten years, unless a different timeframe is set by the WAPC. For structure plans approved before 19 October 2015 (such as ASP 88), the ten-year period is considered to have commenced on that day.
While the deemed provisions and the WAPC’s Structure Plan Guidelines allow for the extension of structure plans, only the WAPC has the authority to make this decision. The City's role is limited to providing advice and administrative support.
In the initiation report (PS01-07/24), Administration advised that a three-year approval period extension for ASP 88 should be considered after public advertising of Amendment No. 222. However, since Amendment No. 222 was initiated in July 2024, the WAPC has since granted a five-year extension to the approval period for ASP 88, to 19 October 2030.
Statutory Compliance
Amendment No. 222 to DPS2 can be processed in accordance with the Planning and Development Act 2005 and the Planning and Development (Local Planning Schemes) Regulations 2015.
Following the Minister for Planning’s approval of Amendment No. 222, the WAPC will amend the relevant structure plan that applies over the Amendment No. 222 area pursuant to Clause 29A of the deemed provisions for local planning schemes, provided in Schedule 2 of the Planning and Development (Local Planning Schemes) Regulations 2015. This can occur as Council resolved to include a Statement in the amendment to that effect, pursuant to Regulation 35A of the Planning and Development (Local Planning Schemes) Regulations 2015.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
5 ~ A well planned, safe and resilient City that is easy to travel around and provides a connection between people and places
5.2 - Plan for and manage land use
Risk Appetite Statement
In pursuit of strategic objective goal 5, we will accept a Medium level of risk, extended to High in the areas of Community / Reputation & Financial / Commercial impacts. Shifting transport modes and usage in the City may require short term pain for longer term gain as the City supports the development, maintenance and connection of alternatives to car use (e.g. cycle ways) and the supporting infrastructure.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-O15 – Project Management |
Medium |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
The above risks relating to the issues contained within this report has been identified and considered within the City’s Corporate Risk Register. Action plans have been developed to manage this risk to support existing management systems.
Policy Implications
Financial Implications
Costs in preparing Amendment No. 222 to DPS2 – and assisting the WAPC in amending ASP 88 – can be met from the current Planning and Sustainability operational budget.
Voting Requirements
Simple Majority
Attachments:
|
1⇩. |
Attachment 1 - Existing Structure Plan Maps - Notated - Jindalee North Agreed Local Structure Plan No. 88 |
25/205758 |
|
|
2⇩. |
Attachment 2 - Annotated Scheme Amendment Map Extract - Area Affected by Amendment No. 222 to District Planning Scheme No. 2 |
25/235808 |
|
|
3⇩. |
Attachment 3 - Council Resolution PS01-07/24 – 16 July 2024 - Amendment No. 222 to District Planning Scheme No. 2 |
25/206187 |
|
|
4⇩. |
Attachment 4 - Advertised Scheme Amendment Proposal - Amendment No. 222 to District Planning Scheme No. 2 |
25/206130 |
|
|
5⇩. |
Attachment 5 - Consolidated R-Code Plan (R-Codes approved under subdivision) ASP 88 - Updated 12 April 2023 |
15/224416 |
|
|
6⇩. |
Attachment 6 - Track Changed Regulation 35A Statement For Advertising - Amendment No. 222 to District Planning Scheme No |
25/206174 |
|
|
7⇩. |
Attachment 7 - Council Submission Schedule - Amendment No. 222 to District Planning Scheme No. 2 |
25/235682 |
|
|
8⇩. |
Attachment 8 - Scheme Amendment Proposal - Modified Following Advertising - Amendment No. 222 to District Planning Scheme No. 2 |
25/236128 |
|
|
9⇩. |
Attachment 9 - Regulation 35A Statement - Modified After Advertising - Amendment No. 222 to District Planning Scheme No. 2 |
25/236157 |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Assets
File Ref: 48943 – 25/243557
Responsible Officer: Director Assets
Attachments: 2
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To consider request for Tender No. 25027 for the Design and Construction of Modular Changeroom Facilities at Kingsway Football Club.
Background
The City of Wanneroo (the City) as part of its 2024/2025 Capital Works Program, is progressing the Design & Construction of Modular Changeroom at Kingsway Football Club. The project is partially funded by a 2022 Federal Government Election Commitment.
The scope of works includes:
· Installation of a new changeroom building including two unisex changerooms, external public toilets, a universally accessible toilet and an external storage area.
· Connection of the new building to power, water and sewer services.
· Realignment of existing reticulation.
· Turf reinstatement.
The additional changeroom to the site will provide for the growing needs of the resident clubs, allowing for the growth of the female sports programs and provide much needed additional toilets for the Athletics Clubs.
This project will enable the clubs to provide for an increased membership demand and subsequently provide for increased opportunities for local and non-residents to participate in physical activity.
The delivery of the two projects will be undertaken in a coordinated schedule to limit the inconvenience for the users of the facility with staging of the works.
Together, the projects form a coordinated approach to improving the overall functionally and inclusivity of the site. The modular facility provides immediate, flexible changeroom space to accommodate increased participation, while the upgrade of the existing building addresses long-term structural, accessibility and compliance issues.
Detail
Tender No. 25027 for the Design and Construction of Modular Changeroom at Kingsway Football Club was advertised on 22 March 2025 and closed on Tuesday 20 May 2025.
Four addenda were issued to provide additional information, including an extension of time.
Essential details of the proposed contract are as follows:
|
Item |
Detail |
|
Contract Form |
Design and Construct (AS4902) |
|
Contract Type |
Lump Sum |
|
Contract Duration |
26 Months including 12 months defect liability period |
|
Commencement Date |
August 2025 |
|
Expiry Date |
October 2027 |
|
Extension Permitted |
Nil |
|
Rise and Fall |
No |
Tender submissions were received from the following companies:
|
Legal Name |
Trading Name |
Abbreviation |
|
Ausco Modular Pty Ltd |
Ausco Modular Pty Ltd |
Ausco Modular |
|
M4 Construction WA Pty Ltd |
M4 Construction WA Pty Ltd |
M4 Construction |
Probity Oversight
Oversight to the tender assessment process was undertaken by the City’s Contracts Officer.
Tender submissions were evaluated in accordance with the Procurement Evaluation Plan (PEP). The PEP included the following selection criteria:
|
Item No |
Description |
Weighting |
|
1 |
Sustainable Procurement: · Environmental Considerations 5% · Buy Local 10% · Reconciliation Action Plan 5% · Access & Inclusion 5% |
25% |
|
2 |
*Work Health & Safety (WHS) |
20% |
|
3 |
*Organisational and key personnel experience |
25% |
|
4 |
*Capacity, methodology and ability to meet project timeline (programme) |
30% |
All tenderers must meet the City’s minimum requirements (as determined by the City) for each of the qualitative criteria detailed above (*) to be considered for further evaluation.
Pricing is not included in the qualitative criteria and is considered as part of the overall value for money assessment.
Both offers were deemed conforming and proceeded for further evaluation.
Evaluation Criteria 1 – Sustainable (Corporate Social Responsibility) Procurement (25%)
Evidence of Sustainable (Corporate Social Responsibility) Procurement assessment was based on the tenderers’ responses provided within the Questionnaires set out in Schedules 3A, 3B, 3C and 3D that were included in the tender documentation.
An assessment was made to determine the ranking based on the tenderers’ environmental policy and practices, buy local contributions, as well as commitment to reconciliation and disability access and inclusion.
Sub Criteria a) – Environment Consideration (5%)
The City is committed to procuring goods and services that have the most positive environmental, social and economic impacts over the entire life cycle of a product or service. The environmental assessment based on tenderers’ response to their Environmental policy and practices.
An assessment was made to determine the ranking based on tenderer’s environmental policy and practices.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Ausco Modular |
1 |
|
M4 Construction |
2 |
Sub Criteria b) – Buy Local (10%)
An assessment was made to determine the ranking based on the responses provided, detailing the following information:
· Purchasing arrangements through local businesses;
· Location of tenderer’s offices and workshops;
· Residential municipality of staff and subcontractors; and
· Requirement for new employees arising from the award of the contract.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
M4 Construction |
1 |
|
Ausco Modular |
2 |
Sub Criteria c) – Reconciliation Action Plan (5%)
An assessment was made to determine the ranking based on the responses provided that relate to:
· Relationships – building positive relationships between indigenous and non-indigenous people.
· Respect – recognizing the contribution of Indigenous people to Australia and learning more about the history, culture and diversity in a two-way communication process, and
· Opportunities – attracting, developing and retaining organizational talent to build opportunities for aboriginal employment, training and development and mentoring.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Ausco Modular |
1 |
|
M4 Construction |
2 |
Sub Criteria d) – Access & Inclusion (5%)
An assessment was made to determine the ranking based on the responses provided that relate to:
· People with disabilities have the same buildings and facilities access opportunities as other people;
· People with disabilities receive information in a format that will enable them to access information as readily as other people are able to access it;
· People with disabilities receive the same level and quality of service from staff as other people receive;
· People with disabilities have the same opportunities as other people to make complaints; and
· People with disabilities have the same opportunities as other people to participate in any employment opportunities.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Ausco Modular |
1 |
|
M4 Construction |
2 |
Overall Sustainable Procurement Ranking Summary
An overall assessment of Evaluation Criteria 1 - Sustainable (Corporate Social Responsibility) Procurement has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Ausco Modular |
1 |
|
M4 Construction |
2 |
Evaluation Criteria 2 - Tenderer’s Safety Management Systems (20%)
Evidence of safety management policies and practices was assessed from the tender submissions. The assessment for safety management was based on the tenderers’ responses to a Health and Safety Management System Questionnaire included within the tender documentation.
All tenderers provided details of their safety management systems with the following ranking:
|
Tenderer |
Ranking |
|
Ausco Modular |
1 |
|
M4 Construction |
2 |
Evaluation Criteria 3 - Tenderer’s relevant experience with achievement of meeting client expectations (25%)
The tenderer’s relevant experience in demonstrating the achievement of meeting client expectations as presented in their tender submission were assessed to evaluate their capability to meet the requirements of the contract. Assessment of this criterion considered the tendering entity’s credentials to fulfil the requirements of the contract. The assessment of this criterion has resulted in the following ranking
|
Tenderer |
Ranking |
|
Ausco Modular |
1 |
|
M4 Construction |
2 |
Evaluation Criteria 4 - Tenderer’s resources and capacity to meet the requirements of the Contract (30%)
The tenderer’s resources as presented in their tender submission were assessed to evaluate their capacity to meet the requirements of the contract. Assessment of this criterion considered the tenderer’s staff resources, vehicles, plant/equipment and workshop support to manage the contract. The assessment of this criterion has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Ausco Modular |
1 |
|
M4 Construction |
2 |
Overall Qualitative Weighted Assessment and Ranking
The tenderers’ submissions were evaluated in accordance with the selection criteria and were assessed against sustainable procurement, experience, methodology, capacity and resources and safety management systems to undertake the works.
The overall qualitative weighted assessment resulted in the following tender ranking:
|
Tenderer |
Ranking |
|
Ausco Modular |
1 |
|
M4 Construction |
2 |
Pricing for the Works Offered
An assessment was made to determine the ranking based on the lump sum pricing provided with the tender documentation.
Based on the information provided, tenderers are ranked as follows:
|
Tenderer |
Ranking |
|
M4 Construction |
1 |
|
Ausco Modular |
2 |
Overall Relative Value for Money Assessment
|
Tenderer |
Ranking |
|
Ausco Modular |
1 |
|
M4 Construction |
2 |
Overall Assessment and Comment
The submission from Ausco Modular satisfied the overall value for money assessment in accordance with the assessment criteria and weightings as detailed in the PEP and is therefore recommended as the successful tenderer.
Please refer to the Confidential Memorandum 1 (Attachment 1) for further detail relating to the tenderers lump sum pricing, value for money assessment and further information supporting the recommendation.
Consultation
The resident clubs have been engaged by the City on various projects over the preceding years including the recent addition of ventilation to the change rooms. The Clubs will be further consulted once a concept design is produced by the contractor.
Statutory Compliance
Tenders were invited in accordance with the requirements of Section 3.57 of the Local Government Act 1995. The tendering procedures and evaluation complied with the requirements of Part 4 of the Local Government (Functions and General) Regulations 1996.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
1 ~ An inclusive and accessible City with places and spaces that embrace all
1.3 - Facilities and activities for all
Risk Appetite Statement
In pursuit of strategic objective goal 1, we will accept a Medium level of risk. The recent pandemic has challenged our previous event delivery, place activation and community connection processes, and the City accepts that meeting community expectations in a more restrictive environment needs flexibility and innovation if community connection is to develop and grow in contrast to social and individual isolation.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-O08 Contract Management |
Low |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
|
Risk Title |
Risk Rating |
|
CO-O15 Project Management |
Medium |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
Financial and Performance Risk
Financial Risk
A financial risk assessment was undertaken by Equifax Australasia Credit Ratings Pty Ltd as part of the tender evaluation process and the outcome of this independent assessment advised that Ausco Modular has been assessed with the financial capacity to meet the requirements of the contract.
Performance Risk
Ausco Modular are the AFL & AFLW endorsed preferred facilities supplier, they have a production capability in Western Australia of completing 2,800 modules per annum and over 60 years of expertise in construction modular sporting facilities. Ausco operate 3 national manufacturing facilities along with 15 service centres across the country. They have completed several local government projects within Western Australia and hundreds nationally within Australia. Ausco have full design and engineering capabilities, legal, HWS, HR, IT and administrative services.
The design and construction work schedule is as follows:
· Concept design phase: 3 months.
· Detailed design and approvals phase: 3 months.
· Off-site construction: 5 months.
· Testing and on-site installation: 3 months.
· Defects liability period: 12 months.
Policy Implications
Tenders were invited in accordance with the requirements of the City’s Purchasing Policy.
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Financial (Budget) Implications
|
PR-4603 |
||
|
Description |
Expenditure |
Budget |
|
Budget: |
|
|
|
Capital Works Budget for 2024/25 (PR-4603) |
|
50,000 |
|
Capital Works Budget for 2025/26 (PR-4603) |
|
485,363 |
|
Listed Capital Works Budget for 2026/27 (PR-4603) |
|
880,497 |
|
Expenditure: |
|
|
|
Expenditure incurred to date |
34,828 |
|
|
Commitment to date |
0 |
|
|
Design and Construction including tender sum |
1,250,000 |
|
|
Contingency |
121,032 |
|
|
Project Management |
10,000 |
|
|
Total Expenditure |
1,415,860 |
|
|
Total Funding |
|
1,415,860 |
This project is listed in the draft Long Term Financial Plan but is not in the December 2022 approved Long Term Financial Plan. Acceptance of Tender 25027 Design & Construction of Modular Changeroom at Kingsway Football Club as per the recommendations made in this report, will commit the City to expenditures in the 2026/27 Budget. The funding requirements identified above have been included in the draft Long-Term Financial Plan.
Voting Requirements
Simple Majority
Attachments:
|
1. |
RFT 25027 Confidential Memorandum 1 - Kingsway Modular Changeroom Facility |
Confidential |
|
|
2. |
RFT 25027 Confidential Memorandum 2 - Kingsway Modular Changeroom Facility |
Confidential |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
|
Moved Cr Berry, Seconded Cr Seif
To bring Item MN05-08/25 Cr Berry - Quinns Rocks Sports Club Accessibility forward as the next item on the Agenda.
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Cr Bedworth declared an impartiality interest in MN05-08/25 due to being a member of Quinns Rocks Sports and Social Club.
Cr Berry declared an impartiality interest in MN05-08/25 due to being a member of the Quinns Rocks RSL and the Quinns Rocks Sports and Social Club
Cr Miles declared an impartiality interest in MN05-08/25 due to being a member of Quinns Rocks Sports and Social Club.
Motions on Notice
File Ref: 5293V007 – 25/302454
Author: Cr Berry
Action Officer: Acting Director Community & Place
Disclosure of Interest: Nil
Attachments: 2
Changes to Report and Additional Information Arising from Agenda Briefing
This report was not presented or discussed at Agenda Briefing.
Issue
To consider providing a funding contribution to the Quinns Rocks Sports Club to undertake an upgrade of the Club’s toilet/bathroom facilities.
Background
The Quinns Rocks Sports Club was founded in 1975 from a resident petition to have a Bowling Club. The current clubroom facility was constructed in the early 1980s and the Club is the sole occupier of the site, holding a lease over the clubroom facility.
During the 2025 State election, the Quinns Rocks Sports Club secured election commitments from both major parties. This has resulted in a 2025 State election commitment grant for the Club of $114,000 for facility upgrades. The cost of the upgrades to provide safe adequate bathroom facilities for all members and users is $580,000.
The Club has spent over $30,000 so far on surveyor reports and detailed plans for the required improvements and requires assistance with the funding shortfall.
Detail
The current lease arrangement includes provisions for the Club to manage works and improvements using the City’s “User Funded Facility Upgrade Process” which enables a partnership between the Club and the City. The current lease is due to expire in June 2029 but has provisions to extend the lease beyond this date.
In December 2024 the City of Wanneroo approved the development application for a purpose-built bathroom block (Attachment 1). The approval was granted under the provisions of the City of Wanneroo District Planning Scheme No. 2 and the Metropolitan Region Scheme.
The Quinns Rocks Sports Club currently has just under 2,000 financial paid-up members and grows around 50 members per month and has done so for some considerable time. In January 2023 the paid-up membership was 1381 demonstrating the growth of this popular Club. There is also affiliate members from the following Clubs who also have a growing membership base;
· Quinns Rocks Bowling Club;
· Mindarie and Districts Sea Sports Club;
· Quins Rocks RSL Sub-branch;
· Quinns Rocks Darts Club; and
· Northern Beaches Cycling Club.
With the ever-expanding community growing north of the Club and development of Catalina to the south of the Club, the Quinns Rocks Sports Club is a Club of choice for many in the community participating in the many Club activities, affiliate Club activities, all of which facilitates social inclusion.
The building itself was constructed in the early 1980s and is a City asset with aged infrastructure. The Quinns Rocks Sports Club have toilets and showers that are outside and not fit for purpose. They cannot be accessed by the whole community and are not female friendly.
The Club has been trying to raise funds, access grants and engage with the City to get vital improvements to ensure the facilities offered not just to their members but all affiliate members and the wider community are fit for purpose and accessible to the whole community.
The Club faces challenges with the ageing facilities when large events such as ANZAC day are held. The last ANZAC Day Dawn service saw over 5,000 community members attend, and during the day around 2,000 community members attended the activities at the Club provided for ANZAC Day.
Providing safe facilities is essential to enable the continuation of such events. The toilets as mentioned (Attachment 2) are not accessible to the whole community.
Due to the toilets being old, they leak and often get blocked causing them to overflow. This is an ongoing safety issue, and they are in need of replacement so individuals using the toilets have access to safe facilities fit for purpose.
The floors are tiled compounding the safety issue when the floors are wet and in the last six weeks three people have slipped over in the toilets. This has resulted in two insurance claims against the club for an issue they do not have the finances to rectify.
Consultation
No consultation has been undertaken on this matter.
Comment
It is also requested that Administration undertake a needs analysis exercise in conjunction with the Quinns Rocks Sports Club to inform future requirements for the Club and the site so this can be appropriately planned and considered.
Statutory Compliance
Nil
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
1 ~ An inclusive and accessible City with places and spaces that embrace all
1.3 - Facilities and activities for all
Risk Appetite Statement
In pursuit of strategic objective goal 1, we will accept a Medium level of risk. The recent pandemic has challenged our previous event delivery, place activation and community connection processes, and the City accepts that meeting community expectations in a more restrictive environment needs flexibility and innovation if community connection is to develop and grow in contrast to social and individual isolation.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
ST-S23 Stakeholder Relationships |
Medium |
|
Accountability |
Action Planning Option |
|
Chief Executive Officer |
Manage |
Policy Implications
The Club operates at the facility under a lease in accordance with the City’s Leasing Policy.
Financial Implications
There are no funds listed in the City’s 2025/26 Capital Works Program or the draft Long Term Financial Plan for upgrades to the facilities at the Quinns Sports & Social Club.
A needs analysis exercise could be undertaken in the current financial year using existing resources.
Voting Requirements
Simple Majority
|
Moved Cr Berry, Seconded Cr Miles That Council:-
1. REQUESTS Administration to list funding support (estimated as $466,000, subject to further updated information and quotes from the Quinns Rocks Sports Club) for consideration in the City’s 2025/26 mid year budget review process for the upgrade of toilet facilities at the Quinns Rocks Sports Club; 2. REQUESTS Administration to undertake a needs analysis exercise in consultation with the Quinns Rocks Sports Club to inform future planning for the Club and the site, similar to what has been done for the Wanneroo and Yanchep Sports and Social Clubs; and 3. REQUESTS the City provide a letter of support to the Quinns Rocks Sports Club for the Club to investigate other funding sources that may become available to supplement existing grant funding for the upgrade of toilet facilities at the Quinns Rocks Sports Club.
Procedural Motion Moved Cr Wright, Seconded Cr Rowe
That the recommendation be divided into two parts due to its complex nature, part 1 being recommendation 1 and part 2 being recommendation 2 to 3.
carried 10/4
For the motion: Mayor
Aitken, Cr Berry Cr Coetzee, Cr Figg, Cr Herridge,
Against the motion: Cr Bedworth, Cr Miles, Cr Nguyen and Cr Seif
Moved Cr Berry, Seconded Cr Miles 1. REQUESTS Administration to list funding support (estimated as $466,000, subject to further updated information and quotes from the Quinns Rocks Sports Club) for consideration in the City’s 2025/26 mid year budget review process for the upgrade of toilet facilities at the Quinns Rocks Sports Club;
carried 10/4
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Miles,
Against the motion: Cr Figg, Cr Herridge, Cr Moore, Cr Parker
Moved Cr Berry, Seconded Cr Miles That Council:-
2. REQUESTS Administration to undertake a needs analysis exercise in consultation with the Quinns Rocks Sports Club to inform future planning for the Club and the site, similar to what has been done for the Wanneroo and Yanchep Sports and Social Clubs; and
3. REQUESTS the City provide a letter of support to the Quinns Rocks Sports Club for the Club to investigate other funding sources that may become available to supplement existing grant funding for the upgrade of toilet facilities at the Quinns Rocks Sports Club.
carried unanimously 14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Lease and proposed tenant works
The current lease between the City and (QRSC) commenced on 23 July 2024, for an initial term of 5 years and two options terms of 5 years in each case.
The lease had been approved by Council at the Ordinary Council Meeting on 18 June 2024 (item CS03-06/24).
As part of the negotiation of the lease, QRSC had proposed funding and undertaking specified tenant works, being:
· Lighting for the third bowling green, to be undertaken in 2024/25; and
· A toilet update and extension, to be undertaken in 2025/26.
Progress of works
At the time of the current Motion on Notice, QRSC has not undertaken the works identified in the lease, though a development application was lodged for the toilet works.
A development application for the works has been approved.
Administration has anticipated that, once QRSC had confirmed it was ready to proceed with the works, ‘user funded facility upgrade’ documentation would be entered between the City and QRSC. This documentation would supplement, in a more detailed form, the works obligations in QRSC’s lease.
Funding and estimated costs
QRSC secured a commitment of $114,000 as a State election funding in 2025. Completion of funding terms and allocation of the funds to QRSC is still pending at the current time. Although the delivery timeframe for the funding commitment has not been formally confirmed, Administration understands that the works would need to be completed in the current term of the State government.
In July and August 2025, QRSC advised Administration and Council Members that it was still seeking additional funding for the proposed works. To date, QRSC has been unsuccessful in securing Commonwealth funding or further State funding.
Cost estimates provided by QRSC to Administration (and dated from October 2024) estimates a total works cost of $580,000 including construction costs, project administration and contingencies. Administration has not received any subsequent cost updates from QRSC, and is providing the current comment on the assumption that the costs remain accurate.
Based on the prior commitment from QRSC to undertake the tenant works, Administration has not budgeted for the City to contribute to the costs.
Other external funding programs may be relevant to this project, such as the State government’s Community Sport & Recreation Facilities Fund, although noting the State government is not accepting applications for this program at this time as it is reviewing the funding timeframes.
There is an opportunity for Council to consider adjusting the 2025/26 operational/capital budget as part of Mid Year Review processes in late 2025 (ahead of an anticipated report to Council in early 2026), or as part of future year’s budget planning in early 2026 (for the 2026/27 financial year) depending on the extent of additional work required to confirm the accuracy of current cost estimates.
If Council determined to allocate the additional funding to QRSC, it is intended that the funding would only be advanced with evidence of procurement and cost verification by QRSC, likely also formalised in documentation relating to the user funded aspect of the works. This would mitigate the risk that QRSC receives funding and does not proceed, or receives funding but ultimately can complete the works at a lower cost.
Needs Analysis Exercise
Administration is able to undertake a needs analysis exercise in consultation with QRSC in the current financial year (by June 2026) to determine future requirements for the Club and the site, and use this information to inform future planning.
The needs analysis process would typically include asset management and future facility planning aspects, where QRSC’s current and future requirements would be matched to the condition and layout of the current site to assess what may be required to support QRSC’s needs and development.
Attachments:
|
1⇩. |
Attachment 1 - Quinns Rocks Sports Club Bathroom plans |
25/304099 |
|
|
2⇩. |
Attachment 2 - Quinns Rocks Sports Club toilets photos |
25/303378 |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Infrastructure Capital Works (continued)
File Ref: 46037 – 25/243561
Responsible Officer: Director Assets
Attachments: 2
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To consider Tender No: 25132 for the Road and Drainage Upgrade Works at Mirrabooka Avenue and Kingsway.
Background
The City of Wanneroo (the City), as part of its 2025/2026 Capital Works Program, is progressing with Roundabout Upgrade – Mirrabooka Avenue and Kingsway, Landsdale. The project involves the upgrade of the intersection at Mirrabooka Avenue and Kingsway to improve traffic flow, reduce congestion, and enhance road safety. The intersection currently experiences high traffic volumes due to its strategic location servicing nearby residential areas, local schools, and the Wangara industrial precinct.
The scope of works includes:
· Construction upgrade to the roundabout with dual approach lanes from Kingsway;
· Road widening and realignment to improve intersection geometry;
· Realignment of the Mirrabooka Avenue approach to the roundabout;
· Drainage upgrades and modifications;
· Kerbing and concrete works;
· Verge reinstatement; and
· Associated traffic management and to facilitate signage and line marking installation.
These improvements are designed to support safer and more efficient movement of vehicles through this key junction.
Detail
Tender 25132 – Road and Drainage Upgrade Works at Mirrabooka Avenue and Kingsway was advertised on 21 June 2025 and closed on 8 July 2025. No site briefing was held during the tender phase, as the site was deemed readily accessible, and its conditions self-explanatory.
Essential details of the proposed contract are as follows:
|
Item |
Detail |
|
Contract Form |
Major works |
|
Contract Type |
Lump Sum |
|
Contract Duration |
10 weeks site works |
|
Commencement Date |
September 2025 |
|
Expiry Date |
December 2025 |
|
Extension Permitted |
No |
|
Rise and Fall |
NA |
Tender submissions were received from the following companies:
· Civcon Civil & Project Management Pty Ltd (CIVCON).
· Dowsing Group Pty Ltd (Dowsing).
· WCP Civil Pty Ltd (WCP Civil).
· Roads 2000 Pty Ltd (Roads 2000).
Probity Oversight
Oversight to the tender assessment process was undertaken by the City’s Contracts Officer.
Tender submissions were evaluated in accordance with the Procurement Evaluation Plan (PEP). The PEP included the following selection criteria:
|
Q |
Criteria |
Weighting |
Schedule Reference |
|
1 |
Sustainable (Corporate Social Responsibility) Procurement a. Environmental Considerations 5% b. Buy Local 10% c. Reconciliation Action Plan 5% d. Access & Inclusion 5% |
25% |
3A, 3B, 3C, 3D |
|
2 |
*WHS |
20% |
2 |
|
3 |
*Methodology Resources & Capacity |
25% |
3E |
|
4 |
*Demonstrated Experience, Capacity and Resources |
30% |
3E |
All tenderers must meet the City’s minimum requirements (as determined by the City) for each of the qualitative criteria detailed above (*) in order to be considered for further evaluation. Pricing is not included in the qualitative criteria and is considered as part of the overall value for money assessment.
All four submissions received for Tender 25132 were assessed for administrative compliance. Each submission was reviewed against the mandatory returnable schedules and insurance requirements. All submissions were deemed conforming and were accepted for further evaluation.
Evaluation Criteria 1 – Sustainable (Corporate Social Responsibility) Procurement (25%)
Evidence of Sustainable (Corporate Social Responsibility) Procurement assessment was based on the tenderers’ responses provided within the Questionnaires set out in Schedules 3A, 3B, 3C and 3D that were included in the tender documentation.
An assessment was made to determine the ranking based on the tenderers’ environmental policy and practices, buy local contributions, as well as commitment to reconciliation and disability access and inclusion.
Sub Criteria a) – Environment Consideration (5%)
The City is committed to procuring goods and services that have the most positive environmental, social and economic impacts over the entire life cycle of a product or service. The environmental assessment based on tenderers’ response to their Environmental policy and practices.
An assessment was made to determine the ranking based on tenderer’s environmental policy and practices.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Dowsing |
1 |
|
WCP Civil |
2 |
|
CIVCON |
2 |
|
Roads 2000 |
4 |
Sub Criteria b) – Buy Local (10%)
An assessment was made to determine the ranking based on the responses provided, detailing the following information:
· Purchasing arrangements through local businesses;
· Location of tenderer’s offices and workshops;
· Residential municipality of staff and subcontractors; and
· Requirement for new employees arising from award of the contract.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Dowsing |
1 |
|
Roads 2000 |
1 |
|
WCP Civil |
3 |
|
CIVCON |
4 |
Sub Criteria c) – Reconciliation Action Plan (5%)
An assessment was made to determine the ranking based on the responses provided that relate to:
· Relationships – building positive relationships between indigenous and non-indigenous people;
· Respect – recognizing the contribution of Indigenous people to Australia and learning more about the history, culture and diversity in a two-way communication process; and
· Opportunities – attracting, developing and retaining organizational talent to build opportunities for aboriginal employment, training and development and mentoring.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
WCP Civil |
1 |
|
Dowsing |
2 |
|
CIVCON |
3 |
|
Roads 2000 |
4 |
Sub Criteria d) – Disability Access & Inclusion (5%)
An assessment was made to determine the ranking based on the responses provided that relate to:
· People with disabilities have the same buildings and facilities access opportunities as other people;
· People with disabilities receive information in a format that will enable them to access information as readily as other people are able to access it;
· People with disabilities receive the same level and quality of service from staff as other people receive;
· People with disabilities have the same opportunities as other people to make complaints; and
· People with disabilities have the same opportunities as other people to participate in any employment opportunities.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Dowsing |
1 |
|
CIVCON |
2 |
|
WCP Civil |
3 |
|
Roads 2000 |
4 |
Overall Sustainable Procurement Ranking Summary
An overall assessment of Evaluation Criteria 1 - Sustainable (Corporate Social Responsibility) Procurement has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Dowsing |
1 |
|
WCP Civil |
2 |
|
Roads 2000 |
3 |
|
CIVCON |
4 |
Evaluation Criteria 2 - Tenderer’s Safety Management Systems (20%)
Evidence of safety management policies and practices was assessed from the tender submissions. The assessment for safety management was based on the tenderers’ responses to a Work Health and Safety Management System Questionnaire included within the tender documentation.
All tenderers provided details of their safety management systems, and the assessment of this criterion has resulted in the following ranking:
|
Tenderer |
Ranking |
|
CIVCON |
1 |
|
WCP Civil |
2 |
|
Dowsing |
3 |
|
Roads 2000 |
3 |
Evaluation Criteria 3 - Methodology Resources & Capacity (25%)
The tenderer’s resources as presented in their tender submission were assessed to evaluate their capacity to meet the requirements of the contract. Assessment of this criterion considered the tenderer’s staff resources, vehicles, plant/equipment, and workshop support to manage the contract.
The assessment of this criterion has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Dowsing |
1 |
|
WCP Civil |
2 |
|
CIVCON |
3 |
|
Roads 2000 |
3 |
Evaluation Criteria 4 - Demonstrated Experience, Capacity and Resources (30%)
The tenderer’s resources as presented in their tender submission were assessed to evaluate their capacity to meet the requirements of the contract. Assessment of this criterion considered the tenderer’s staff resources, vehicles, plant/equipment, and workshop support to manage the contract.
The assessment of this criterion has resulted in the following ranking:
|
Tenderer |
Ranking |
|
WCP Civil |
1 |
|
Dowsing |
1 |
|
CIVCON |
3 |
|
Roads 2000 |
4 |
Overall Qualitative Weighted Assessment and Ranking
The tenderers’ submissions were evaluated in accordance with the selection criteria and were assessed against sustainable procurement, experience, methodology, capacity and resources and safety management systems to undertake the works.
The overall qualitative weighted assessment resulted in the following tender ranking:
|
Tenderer |
Ranking |
|
Dowsing |
1 |
|
WCP Civil |
2 |
|
CIVCON |
3 |
|
Roads 2000 |
4 |
Pricing for the Works Offered
The tenderer’s lump sum price as presented in their tender submission were assessed with the following ranking:
|
Tenderer |
Ranking |
|
WCP Civil |
1 |
|
CIVCON |
2 |
|
Dowsing |
3 |
|
Roads 2000 |
4 |
Overall Value for Money Assessment
The combined assessment of lump sum price and qualitative criteria resulted in the following tender ranking:
|
Tenderer |
Ranking |
|
WCP Civil |
1 |
|
CIVCON |
2 |
|
Dowsing |
3 |
|
Roads 2000 |
4 |
Please refer to the Confidential Memo’s (Attachment 1 & 2) for further information supporting the recommendation.
Overall Assessment and Comment
Tender submissions were evaluated in accordance with the criteria set out in the PEP with the tender submission from WCP Civil assessed to provide the best value for money outcome for Tender 25132 – Road and Drainage Upgrade Works at Mirrabooka Avenue and Kingsway.
Consultation
In accordance with the City’s Community Engagement Policy and Management Procedure, consultation has been undertaken with internal and external stakeholders including Main Roads WA, utility service providers, and adjoining landowners throughout the design and development phases of the project.
Following the award of the contract and prior to the commencement of construction, stakeholders will be notified of the upcoming on-site works. An information letter will be delivered to all residents in the vicinity of the project site. Additionally, elected members and internal and external stakeholders will be advised via Wanneroo wrap, City’s webpage and media channels.
Comment
The tender submission from WCP Civil achieved the highest ranking for the overall value for money assessment in accordance with the assessment criteria and weightings as detailed in the Tender Evaluation Plan and is therefore recommended as the successful tenderer.
Statutory Compliance
Tenders were invited in accordance with the requirements of Section 3.57 of the Local Government Act 1995. The tendering procedures and evaluation complied with the requirements of Part 4 of the Local Government (Functions and General) Regulations 1996.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
5 ~ A well planned, safe and resilient City that is easy to travel around and provides a connection between people and places
5.1 - Develop to meet current need and future growth
Risk Appetite Statement
In pursuit of strategic objective goal 5, we will accept a Medium level of risk, extended to High in the areas of Community / Reputation & Financial / Commercial impacts. Shifting transport modes and usage in the City may require short term pain for longer term gain as the City supports the development, maintenance and connection of alternatives to car use (e.g. cycle ways) and the supporting infrastructure.
Risk Management Considerations
The risks relating to the issues contained within this report are identified and considered within the City’s Strategic and Corporate risk register with action plans developed to manage/mitigate/accept these risks to support existing management systems.
|
Risk Title |
Risk Rating |
|
CO-O08 Contract Management |
Low |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
|
Risk Title |
Risk Rating |
|
CO-O15 Project Management |
Medium |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
Financial Risk
A financial risk assessment was undertaken by Equifax Australasia Credit Ratings Pty Ltd as part of the tender evaluation process and the outcome of this independent assessment advised that WCP Civil has been assessed with the financial capacity to meet the requirements of the contract.
Performance Risk
Performance and operational risk are addressed through the risk assessment process of the project management framework. Prior to the commencement of works, the appointed contractor will be inducted to the project site. Ongoing auditing of the contractor’s work practices during the works will be undertaken to ensure compliance with the WHS requirements.
WCP Civil has delivered capital works projects for the City, in which they demonstrated satisfactory performance. Independent reference checks were conducted for WCP Civil indicating that the recommended tenderer has provided excellent service, with proactive delivery to its clients, producing quality outcomes.
Policy Implications
Tenders were invited in accordance with the requirements of the City’s Purchasing Policy.
Financial (Budget) Implications
|
Description |
Expenditure |
Budget |
|
Budget: |
|
|
|
Allocated Capital Works Budget for 2025/26 (PR-4422) |
|
$1,068,000 |
|
Allocated Capital Works Budget for 2025/26 (PR-4705) (Partial allocation) |
|
$532,000 |
|
Expenditure |
|
|
|
Expenditure incurred to date (2025/2026) |
$0 |
|
|
Commitment to date |
$4,224 |
|
|
Construction Costs including Tenderer’s Price, Project Management and Contingency |
$1,595,776 |
|
|
Total |
$1,600,000 |
$1,600,000 |
The total project cost of $1,600,000 for FY2025/26 is fully funded through allocations from PR-4422 ($1,068,000) and a partial allocation from PR-4705 ($532,000).
Voting Requirements
Simple Majority
|
Moved Cr Herridge, Seconded Cr Seif That Council: 1. ACCEPTS the tender submitted by WCP Civil for Tender No: 25132 for the Road and Drainage Upgrade Works at Mirrabooka Avenue and Kingsway, for the lump sump price as identified within the confidential memorandum (Attachment 1) in accordance with the terms and conditions of the tender; and 2. AUTHORISES Administration to release the information contained in the Confidential Memorandum 2 (Attachment 2) via the City’s website after a formal letter of Tender Award is issued to the successful tenderer (as per item 1 above).
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil
|
||||||
Attachments:
|
1. |
Attachment 1 - Confidential memorandum 1 RFT 25132 |
Confidential |
|
|
2. |
Attachment 2 - Confidential memorandum 2 RFT 25132 |
Confidential |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
AS03-08/25 Tender 25128 - Construction Wangara Waste Transfer Station
File Ref: 39906 – 25/250419
Responsible Officer: Director Assets
Attachments: 2
Changes to Report and Additional Information Arising from Agenda Briefing
In relation to the question raised about the completion date of the project, it is advised that the target project construction completion date is 28 February 2026.
Issue
To consider Tender No. 25128 for the Construction of Wangara Waste Transfer Station.
Background
At the ordinary meeting of Council in February 2025 Council resolved through report AS03-12/24 - Neerabup Resource Recovery Precinct – Masterplan, the following:
“1. ENDORSES the Neerabup Resource Recovery Precinct Masterplan (Attachment 2 & 3) as the key guiding tool for the development of the future waste management precinct for the City;
2. AUTHORISES Administration to implement the recommendations made by Talis Consultants (Attachment 3) and list the works identified under the financial Implications section of this report to support the development of the Neerabup Resource Recovery Precinct;
3. AUTHORISES Administration to progress the design, documentation and associated project development work for the Wangara Waste Transfer Station during 2024/25;
4. APPROVES by ABSOLUTE MAJORITY an unbudgeted amount for the Wangara Waste Transfer Station (Project Number – TBA) of $120,000 in the Capital Work Budget in Financial Year 24/25 to be funded from Waste Management Reserve to progress the design, documentation and associated project development work for the Wangara Waste Transfer Station; and
5. LISTS funds $2,540,000 for consideration in the 2025/26 budget to undertake the construction of Wangara Waste Transfer Station.”
In the Neerabup Resource Recovery Master Plan the former Materials Recycling Facility (MRF) located on Motivation Drive Wangara was identified as the site for an interim waste transfer station solution. Design work for a transfer station has progressed and subsequent to partial demolition of the former MRF, works would be undertaken to convert the facility into a Waste Transfer Station, providing the City with a more cost-effective solution to managing waste.
Detail
Tender No. 25128 for the Construction of Wangara Waste Transfer Station was advertised on Wednesday 25 June 2025 and closed on Tuesday 15 July 2025.
Essential details of the proposed contract are as follows:
|
Item |
Detail |
|
Contract Form |
Major Work Contract |
|
Contract Type |
Fixed Lump Sum |
|
Contract Duration |
18 Months |
|
Commencement Date |
September 2025 |
|
Expiry Date |
February 2027 |
|
Extension Permitted |
No |
|
Rise and Fall |
N/A |
Tender submissions were received from the following companies:
· Byte Construct Pty Ltd (Byte).
· Doolee Construction Pty Ltd (Doolee).
· LKS Constructions (WA) Pty Ltd (LKS).
A total of 4 addenda were issued during the tender period providing clarification on scope and specifications.
Probity Oversight
Oversight to the tender assessment process was undertaken by the City’s Contracts Officer.
Tender submissions were evaluated in accordance with the Procurement and Evaluation Plan (PEP). The PEP included the following selection criteria:
|
Item No |
Description |
Weighting |
|
1 |
Work Health & Safety Management Systems |
25% |
|
2 |
Sustainable Procurement |
20% |
|
3 |
Proposed Methodology |
20% |
|
4 |
Capacity and Resources |
15% |
|
5 |
Demonstrated Experience |
20% |
All tenderers must meet the City’s minimum requirements (as determined by the City) for each of the qualitative criteria detailed above (*) in order to be considered for further evaluation.
Pricing is not included in the qualitative criteria and is considered as part of the overall value for money assessment.
All 3 tender submission were conforming.
Evaluation Criteria 1 - Tenderer’s Work Health & Safety Management Systems (20%)
Evidence of safety management policies and practices was assessed from the tender submissions. The assessment for safety management was based on the tenderers’ responses to a Health and Safety Management System Questionnaire included within the tender documentation.
All tenderers provided details of their safety management systems with the following ranking:
|
Tenderer |
Ranking |
|
Byte |
1 |
|
Doolee |
1 |
|
LKS |
3 |
Evaluation Criteria 2 – Sustainable (Corporate Social Responsibility) Procurement (20%)
Evidence of Sustainable (Corporate Social Responsibility) Procurement assessment was based on the tenderers’ responses provided within the Questionnaires set out in Schedules 3A, 3B, 3C and 3D that were included in the tender documentation.
An assessment was made to determine the ranking based on the tenderers’ environmental policy and practices, buy local contributions, as well as commitment to reconciliation and disability access and inclusion.
Sub Criteria a) – Environment Consideration (5%)
The City is committed to procuring goods and services that have the most positive environmental, social and economic impacts over the entire life cycle of a product or service. The environmental assessment based on tenderers’ response to their Environmental policy and practices.
An assessment was made to determine the ranking based on tenderer’s environmental policy and practices.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Doolee |
1 |
|
LKS |
2 |
|
Byte |
3 |
Sub Criteria b) – Buy Local (10%)
An assessment was made to determine the ranking based on the responses provided, detailing the following information:
· Purchasing arrangements through local businesses.
· Location of tenderer’s offices and workshops.
· Residential municipality of staff and subcontractors, and
· Requirement for new employees arising from award of the contract.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Doolee |
1 |
|
Byte |
2 |
|
LKS |
2 |
Sub Criteria c) – Reconciliation Action Plan (2.5%)
An assessment was made to determine the ranking based on the responses provided that relate to:
· Relationships – building positive relationships between indigenous and non-indigenous people;
· Respect – recognizing the contribution of Indigenous people to Australia and learning more about the history, culture and diversity in a two-way communication process; and
· Opportunities – attracting, developing and retaining organizational talent to build opportunities for aboriginal employment, training and development and mentoring.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Byte |
1 |
|
Doolee |
1 |
|
LKS |
3 |
Sub Criteria d) – Disability Access & Inclusion (2.5%)
An assessment was made to determine the ranking based on the responses provided that relate to:
· People with disabilities have the same buildings and facilities access opportunities as other people;
· People with disabilities receive information in a format that will enable them to access information as readily as other people are able to access it,
· People with disabilities receive the same level and quality of service from staff as other people receive;
· People with disabilities have the same opportunities as other people to make complaints; and
· People with disabilities have the same opportunities as other people to participate in any employment opportunities.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
LKS |
1 |
|
Byte |
2 |
|
Doolee |
2 |
Overall Sustainable Procurement Ranking Summary
An overall assessment of Evaluation Criteria 1 - Sustainable (Corporate Social Responsibility) Procurement has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Doolee |
1 |
|
LKS |
2 |
|
Byte |
3 |
Evaluation Criteria 3 - Tenderer’s proposed methodology to meet the requirements of the Contract (20%)
The tenderer’s proposed methodology as presented in their tender submission were assessed in order to evaluate their understanding in meeting the requirements of the contract. Assessment of this criterion considered the tenderer’s construction methodology and delivery timeline The assessment of this criterion has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Byte |
1 |
|
LKS |
2 |
|
Doolee* |
3 |
Evaluation Criteria 4 - Tenderer’s resources and capacity to meet the requirements of the Contract (15%)
The tenderer’s resources as presented in their tender submission were assessed in order to evaluate their capacity to meet the requirements of the contract. Assessment of this criterion considered the tenderer’s staff resources, vehicles, plant/equipment and workshop support to manage the contract. The assessment of this criterion has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Byte |
1 |
|
Doolee |
2 |
|
LKS |
2 |
Evaluation Criteria 5- Tenderer’s relevant experience with achievement of meeting client expectations (20%)
The tenderer’s relevant experience in demonstrating the achievement of meeting client expectations as presented in their tender submission were assessed in order to evaluate their capability to meet the requirements of the contract. Assessment of this criterion considered the tendering entity’s credentials, the knowledge and experience of key personnel to fulfil the requirements of the contract. The assessment of this criterion has resulted in the following ranking
|
Tenderer |
Ranking |
|
Byte |
1 |
|
Doolee |
2 |
|
LKS |
2 |
Overall Qualitative Weighted Assessment and Ranking
The tenderers’ submissions were evaluated in accordance with the selection criteria and were assessed against sustainable procurement, experience, methodology, capacity and resources and safety management systems to undertake the works.
The overall qualitative weighted assessment resulted in the following tender ranking:
|
Tenderer |
Ranking |
|
Byte |
1 |
|
LKS |
2 |
|
Doolee |
NA |
*Doolee failed to meet at least one of the mandatory qualitative criteria and as such did not proceed to the lump sum pricing or value for money assessment.
Pricing for the Works Offered
An assessment was made to determine the ranking based on the lump sum pricing provided with the quote documentation.
Based on the pricing information provided, tenderers are ranked as follows:
|
Tenderer |
Ranking |
|
Byte |
1 |
|
LKS |
2 |
Overall Value for Money Assessment
Please refer to the Confidential Memo attached for further detail relating to the tenderers lump sum pricing, value for money assessment and further information supporting the recommendation.
Overall Assessment and Comment
Tender submissions were evaluated in accordance with the criteria set out in the PEP with the tender submission from Byte Construct Pty Ltd assessed to provide the best value for money outcome for Tender No. 25128 for the Construction of Wangara Waste Transfer Station.
Comment
The tender submission from Byte Construction Pty Ltd achieved the highest ranking and satisfied the overall value for money assessment in accordance with the assessment criteria and weightings as detailed in the PEP and is therefore recommended as the successful tenderer.
Statutory Compliance
Tenders were invited in accordance with the requirements of Section 3.57 of the Local Government Act 1995. The tendering procedures and evaluation complied with the requirements of Part 4 of the Local Government (Functions and General) Regulations 1996.
The City has submitted a DWER Works Approval for the project, which is currently under assessment, and is anticipated to be finalised before the beginning of works, however should there be a delay works not subject to the DWER approval will be prioritised until approval is received.
The application for a building licence will be undertaken by the appointed tenderer. The works at the site are considered as public works and as such there is no requirement for a development approval.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
4 ~ A sustainable City that balances the relationship between urban growth and the environment
4.4 - Manage waste and its impacts
Risk Appetite Statement
In pursuit of strategic objective goal 4, we will accept a Medium level of risk. The nature of the City being ‘pro-growth’ means that commercial opportunities will be explored in areas identified for development, potentially challenging perceptions of the City as an environmental steward.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
IN-O11 Waste Service Delivery |
Low |
|
Accountability |
Action Planning Option |
|
Manager Waste Services |
Manage |
|
Risk Title |
Risk Rating |
|
IN-O40 Operational activities environmental impact |
Moderate |
|
Accountability |
Action Planning Option |
|
Director Assets |
Manage |
Financial and Performance Risk
Financial Risk
A financial risk assessment was undertaken by Equifax Australasia Credit Ratings Pty Ltd as part of the tender evaluation process and the outcome of this independent assessment advised that Byte Construct Pty Ltd has been assessed with the financial capacity to meet the requirements of the contract.
Performance Risk
Independent reference checks have also indicated that the recommended tenderer has the capacity and experience to undertake a contract of this nature.
Policy Implications
Tenders were invited in accordance with the requirements of the City’s Purchasing Policy.
Financial (Budget) Implications
|
PR-4247 |
||
|
Description |
Expenditure |
Budget |
|
Budget: |
|
|
|
Allocated Capital Works Budget for Previous Years |
|
$379,000 |
|
Allocated Capital Works Budget for 2025/26 (PR-4247) |
|
$2,710,000 |
|
|
|
|
|
Expenditure: |
|
|
|
Expenditure incurred to date in 2024/2025 |
$401,746 |
|
|
Commitment to date |
$65,900 |
|
|
Construction Costs including tender sum and contingency |
$4,171,045 |
|
|
Total Expenditure |
$4,638,691 |
$3,089,000 |
|
Funding Shortfall |
|
|
The award of Tender 25128 requires the budget amendment of $1,549,691 to be made as per the table above to accommodate the construction stage for the project in the current financial year 2025/26.
Voting Requirements
Absolute Majority
|
Moved Cr Miles, Seconded Cr Wright That Council: 1. ACCEPTS the tender submitted by Byte Construct Pty Ltd for the lump sum price for Tender No. 25128, for the Construction of Wangara Waster Transfer Station, as identified within Confidential Memorandum 1 (Attachment 1) in accordance with the terms and conditions of the tender; 2. AUTHORISES Administration to release the information contained in the Confidential Memorandum 2 (Attachment 2) via the City’s website after a formal letter of Award is issued to the successful tenderer as per item 1 above; and 3. APPROVES by ABSOLUTE Majority a budget amendment to increase funding allocation for PR-4247 - Construction of the Wangara Waste Transfer Station by $1,549,691 to be funded from the Waste Management Reserve into Financial Year 25/26 to meet the financial requirements of the project.
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil
|
||||||
Attachments:
|
1. |
Attachment 1 - 25128 Confidential Memo 1 |
Confidential |
|
|
2. |
Attachment 2 - 25128 Confidential Memo 2 |
Confidential |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Waste Services
AS04-08/25 Tender No. 25033 Provision of Mobile Garbage Bins, Parts, Caddies and Compostable Caddy Liners
File Ref: 52356 – 25/237731
Responsible Officer: Director Assets
Attachments: 1
Changes to Report and Additional Information Arising from Agenda Briefing
Revised the recommendation to include the term ‘Separable Portion 1’ in the first paragraph and to remove the reference to ‘Caddies and Compostable Caddy Liners’ for clarity on accepted items.
Issue
To consider Tender No. 25033 for the Provision of Mobile Garbage Bins, Parts, Caddies and Compostable Caddy Liners.
Background
The City’s existing contract to supply and deliver Mobile Garbage Bins (MGBs), to support kerbside waste collection services, expires on 20 August 2025. Additionally, the City eventually plans to adopt a Food Organic and Garden Organic (FOGO) kerbside collection system, in line with the WARR Strategy 2030, prior to 2028. To do this the City will be required to supply residents with a 7L desk top caddy, and appropriate compostable caddy liners. Rollout of this service is dependent upon the receipt of further information and consideration of further reports and decision by Council.
The City has sought tender submissions for a three separable portion contract:
SP1: Supply and delivery of mobile garbage bins and parts.
SP2: Supply and delivery of work top kitchen caddies.
SP3: Supply and delivery of compostable caddy liners/bags.
Detail
Tender No. 25033 for the above separable portions was advertised on Wednesday 9 April 2025 and closed on Tuesday 6 May 2025.
Essential details of the proposed contracts are as follows:
|
Item |
Detail |
|
Contract Form |
Goods and Services |
|
Contract Type |
Schedule of Rates |
|
Contract Duration |
Three (3) Years |
|
Commencement Date |
1 September 2025 |
|
Expiry Date |
31 August 2028 |
|
Extension Permitted |
Yes, two (2) periods of one (1) year. |
|
Rise and Fall |
Maximum Perth All Groups CPI increases upon extensions. |
Tender submissions were received from the following companies:
Separable Portion 1: Supply and delivery of mobile garbage bins and parts
|
Legal Entity |
Trading Name |
Abbreviation |
|
The Trustee for WRS Trust |
Mastec Australia Pty Ltd |
Mastec |
|
Trident Plastics (SA) Pty Ltd |
Trident Plastics (SA) Pty Ltd |
Trident |
Separable Portion 2: Supply and delivery of work top kitchen caddies
|
Legal Entity |
Trading Name |
Abbreviation |
|
The Trustee for WRS Trust |
Mastec Australia Pty Ltd |
Mastec |
|
Trident Plastics (SA) Pty Ltd |
Trident Plastics (SA) Pty Ltd |
Trident |
Separable Portion 3: Supply and delivery of compostable caddy liners/bags
|
Legal Entity |
Trading Name |
Abbreviation |
|
Biobag World Australia Pty Ltd |
Biobag World Australia Pty Ltd |
Biobag World |
|
Cardia Bioplastics (Australia) Pty Ltd |
Cardia Bioplastics (Australia) Pty Ltd |
Cardia Bioplastics |
|
The Trustee for WRS Trust |
Mastec Australia Pty Ltd |
Mastec |
|
Trident Plastics (SA) Pty Ltd |
Trident Plastics (SA) Pty Ltd |
Trident |
|
Vexel Pty Ltd |
Vexel Pty Ltd |
Vexel |
Separable Portions
At this stage, FOGO service options are not yet available for consideration. This is due to the Mindarie Regional Council (MRC) not having finalised its negotiations for a potential FOGO processing contract. Until these negotiations are concluded, the City is unable to assess or present viable FOGO implementation pathways. As the City has not made any decisions yet to proceed to delivering a FOGO processing option, the supply of kitchen caddies and caddy liners under SP2 and SP3 of this tender is unable to be considered as these items will only be required once a FOGO contractor has been appointed.
Separable Portion 1 for the supply of mobile garbage bins and parts was assessed.
Probity Oversight
External Probity Oversight was undertaken by William Buck Consulting (WA) Pty Ltd, and the City’s Contracts Officer.
Tender submissions to Separable Portion 1 were evaluated in accordance with the Procurement Evaluation Plan (PEP). The PEP included the following selection criteria:
|
Item No |
Description |
Weighting |
|
1 |
Sustainable (Corporate Social Responsibility) Procurement a. Environmental Considerations 5% b. Buy Local 10% c. Reconciliation Action Plan 5% d. Access & Inclusion 5% |
25% |
|
2 |
*Established Work Health and Safety Management systems, policies, practices and procedures and demonstrated compliance with those systems, policies, practices and procedures |
20% |
|
3 |
*Demonstrated relevant similar experience |
15% |
|
4 |
*Demonstrated resources and capacity to supply |
20% |
|
5 |
*Demonstrated understanding of the methodology to deliver the services and the allocation of sufficient resources to undertake the services |
20% |
All tenderers must meet the City’s minimum requirements (as determined by the City) for each of the qualitative criteria detailed above (*) in order to be considered for further evaluation.
Both tender submissions to SP1 were considered conforming and were included for further evaluation.
Pricing is not included in the qualitative criteria and is considered as part of the overall value for money assessment.
Evaluation Criteria 1 – Sustainable (Corporate Social Responsibility) Procurement (25%)
Evidence of Sustainable (Corporate Social Responsibility) Procurement assessment was based on the tenderers’ responses provided within the Questionnaires set out in Schedules 3A, 3B, 3C and 3D that were included in the tender documentation.
An assessment was made to determine the ranking based on the tenderers’ environmental policy and practices, buy local contributions, as well as commitment to reconciliation and disability access and inclusion.
Sub Criteria a) – Environment Consideration (5%)
The City is committed to procuring goods and services that have the most positive environmental, social and economic impacts over the entire life cycle of a product or service. The environmental assessment based on tenderers’ response to their Environmental policy and practices.
An assessment was made to determine the ranking based on tenderer’s environmental policy and practices.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Trident Plastics |
1 |
|
Mastec Australia |
2 |
Sub Criteria b) – Buy Local (10%)
An assessment was made to determine the ranking based on the responses provided, detailing the following information:
· Purchasing arrangements through local businesses;
· Location of tenderer’s offices and workshops;
· Residential municipality of staff and subcontractors; and
· Requirement for new employees arising from award of the contract.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Trident Plastics |
1 |
|
Mastec Australia |
2 |
Sub Criteria c) – Reconciliation Action Plan (5%)
An assessment was made to determine the ranking based on the responses provided that relate to:
· Relationships – building positive relationships between indigenous and non-indigenous people;
· Respect – recognising the contribution of Indigenous people to Australia and learning more about the history, culture and diversity in a two-way communication process; and
· Opportunities – attracting, developing and retaining organizational talent to build opportunities for aboriginal employment, training and development and mentoring.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Mastec Australia |
1 |
|
Trident Plastics |
2 |
Sub Criteria d) – Disability Access & Inclusion (5%)
An assessment was made to determine the ranking based on the responses provided that relate to:
· People with disabilities have the same buildings and facilities access opportunities as other people;
· People with disabilities receive information in a format that will enable them to access information as readily as other people are able to access it;
· People with disabilities receive the same level and quality of service from staff as other people receive;
· People with disabilities have the same opportunities as other people to make complaints; and
· People with disabilities have the same opportunities as other people to participate in any employment opportunities.
The assessment of this criterion determined the following ranking:
|
Tenderer |
Ranking |
|
Mastec Australia |
1 |
|
Trident Plastics |
1 |
Overall Sustainable Procurement Ranking Summary
An overall assessment of Evaluation Criteria 1 - Sustainable (Corporate Social Responsibility) Procurement has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Trident Plastics |
1 |
|
Mastec Australia |
2 |
Evaluation Criteria 2 - Established Work Health and Safety Management systems, policies, practices and procedures and demonstrated compliance with those systems, policies, practices and procedures (20%)
Evidence of safety management policies and practices was assessed from the tender submissions. The assessment for safety management was based on the tenderers’ responses to a Health and Safety Management System Questionnaire included within the tender documentation.
All tenderers provided details of their safety management systems with the following ranking:
|
Tenderer |
Ranking |
|
Trident Plastics |
1 |
|
Mastec Australia |
2 |
Evaluation Criteria 3 - Demonstrated relevant similar experience (15%)
The tenderer’s relevant experience in demonstrating the achievement of meeting client expectations as presented in their tender submission were assessed in order to evaluate their capability to meet the requirements of the contract. Assessment of this criterion considered the tendering entity’s credentials to fulfil the requirements of the contract.
The assessment of this criterion has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Mastec Australia |
1 |
|
Trident Plastics |
1 |
Evaluation Criteria 4 - Demonstrated resources and capacity to supply (20%)
The tenderer’s resources as presented in their tender submission were assessed in order to evaluate their capacity to meet the requirements of the contract. Assessment of this criterion considered the tenderer’s staff resources, vehicles, plant/equipment and workshop support to manage the contract.
The assessment of this criterion has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Mastec Australia |
1 |
|
Trident Plastics |
1 |
Evaluation Criteria 5 – Demonstrated understanding of the methodology to deliver the services and the allocation of sufficient resources to undertake the services (20%)
The tenderer’s understanding of the required methodology and their approach to service delivery were assessed to determine their capability to undertake the contract effectively. Assessment of this criterion considered the tenderer’s proposed work methodology, scheduling and operational planning, as well as their allocation of appropriate staff, vehicles, and equipment to deliver the services in line with contract requirements.
The assessment of this criterion has resulted in the following ranking:
|
Tenderer |
Ranking |
|
Mastec Australia |
1 |
|
Trident Plastics |
2 |
Overall Qualitative Weighted Assessment and Ranking
The tenderers’ submissions were evaluated in accordance with the selection criteria and were assessed against sustainable procurement, experience, methodology, capacity and resources and safety management systems to undertake the works.
The overall qualitative weighted assessment resulted in the following tender ranking:
|
Tenderer |
Ranking |
|
Trident Plastics |
1 |
|
Mastec Australia |
2 |
Pricing for the Works Offered
Pricing is based on a schedule of rates over the initial 3-year term of the contract and resulted in the following tenderer ranking:
|
Tenderer |
Ranking |
|
Trident Plastics |
1 |
|
Mastec Australia |
2 |
Overall Value for Money Assessment
Please refer to the Confidential Memo attached for further detail relating to the tenderer’s schedule of rates, value for money assessment and further information supporting the recommendation.
Overall Assessment and Comment
Tender submissions were evaluated in accordance with the criteria set out in the PEP with the tender submission from Trident Plastics assessed to provide the best value for money outcome for Separable Portion 1 to Tender No 25033.
Consultation
As part of the tender evaluation due diligence, consultations were held with other local government authorities who have previously worked with Trident Plastics to obtain performance references.
Comment
The tender submission from Trident Plastics to SP1 achieved the highest qualitative ranking and satisfied the overall value for money assessment in accordance with the assessment criteria and weightings as detailed in the PEP and is therefore recommended as the successful tenderer.
Statutory Compliance
Tenders were invited in accordance with the requirements of Section 3.57 of the Local Government Act 1995. The tendering procedures and evaluation complied with the requirements of Part 4 of the Local Government (Functions and General) Regulations 1996.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
4 ~ A sustainable City that balances the relationship between urban growth and the environment
4.4 - Manage waste and its impacts
Risk Appetite Statement
In pursuit of strategic objective goal 4, we will accept a Medium level of risk. The nature of the City being ‘pro-growth’ means that commercial opportunities will be explored in areas identified for development, potentially challenging perceptions of the City as an environmental steward.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-022 Environmental Management |
High |
|
Accountability |
Action Planning Option |
|
Manager Waste Services |
Manage |
|
Risk Title |
Risk Rating |
|
IN-011 Waste Service Delivery |
High |
|
Accountability |
Action Planning Option |
|
Manager Waste Services |
Manage |
Financial and Performance Risk
Financial Risk
A financial risk assessment was undertaken by Equifax Australasia Credit Ratings Pty Ltd as part of the tender evaluation process and the outcome of this independent assessment advised that Trident Plastics have been assessed with the financial capacity to meet the requirements of the contract.
Performance Risk
Trident Plastics has confirmed there are no current or previous disputes, notices of default, or performance-related issues in their dealings with the City or other clients. This declaration reflects positively on their contract management history and suggests a cooperative and compliant working relationship with the City. Their track record indicates reliability and supports their suitability for ongoing or future engagements.
Policy Implications
Tenders were invited in accordance with the requirements of the City’s Purchasing Policy.
Financial (Budget) Implications
The costs associated with the Provision of Mobile Garbage Bins and Parts are included in the Waste Services Operational Budget.
Voting Requirements
Simple Majority
|
Moved Cr Rowe, Seconded Cr Herridge That Council- 1. ACCEPTS the tender submitted by Trident Plastics for Tender No 25033 for the provision of Mobile Garbage Bins and Parts against Separable Portion 1 for an initial period of Three (3) Years with the option of two (2) twelve (12) month or part thereof options to extend at the City’s discretion and subject to budget availability and satisfactory performance; and 2. DECLINES all tenders for Separable Portions 2 & 3 for Tender No. 25033, for the Provision of Caddies and Compostable Caddy Liners.
*14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil
|
||||
Attachments:
|
1. |
25033 Confidential Attachment 1 |
Confidential |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
AS05-08/25 Membership for the Waste Avoidance and Resource Recovery Advisory Committee
File Ref: 4267V003 – 25/272978
Responsible Officer: Director Assets
Attachments: 1
Previous Items: AS02-07/25 - Updated Terms of Reference: Waste Management Advisory Committee - Ordinary Council - 22 Jul 2025
Changes to Report and Additional Information Arising from Agenda Briefing
In response to the question regarding the Committee name, it is advised that the Committee name noted in the recommendations made in this report is correct.
Issue
Following Council’s endorsement and adoption of the updated Terms of Reference (ToR) for the Waste Advisory and Resource Recovery Advisory Committee (WARRAC), there is a requirement to appoint up to three additional Council Members to the Committee to meet the updated membership provisions.
Background
At its Ordinary Council Meeting held on 22 July 2025, Council resolved to:
“1. Endorse and adopt the updated Terms of Reference for the Waste Management Advisory Committee (WMAC), now renamed the Waste Advisory and Resource Recovery Advisory Committee (WARRAC).
2. Endorse the renaming of the Committee to better reflect its expanded scope and strategic focus on resource recovery.”
The updated ToR now provide for up to four additional Council Members to be appointed to the Committee, in addition to the Mayor and two Council Members who are representatives on the Mindarie Regional Council.
Detail
The current membership of WARRAC includes:
· The Mayor of the City of Wanneroo;
· Two Council Members who are representatives on the Mindarie Regional Council; and
· One additional Council Member.
To align with the updated ToR, up to three additional Council Members can now be appointed to the Committee. This will ensure full representation and enable broader participation in strategic waste and resource recovery initiatives. Nominations can be made by submission of the Nomination Form (Attachment 1).
The recommendation presented at the 22 July 2025 Ordinary Council Meeting included a error in the name of the Committee, referring to it as the Waste Advisory and Resource Recovery Advisory Committee. The correct name, to be endorsed by Council, is the Waste Avoidance and Resource Recovery Advisory Committee.
Consultation
Consultation has occurred with internal stakeholders to ensure alignment with governance protocols and the process for appointment.
Comment
The appointment of three additional Council Members will enhance the Committee’s capacity to provide strategic advice and oversight on waste management and resource recovery matters. It will also support the City’s commitment to sustainability and circular economy principles.
It is noted that the Council resolution from the 22 July 2025 Ordinary Council Meeting included an error in the name of the Committee, referring to it as the Waste Advisory and Resource Recovery Advisory Committee. The correct name, to be endorsed by Council, is the Waste Avoidance and Resource Recovery Advisory Committee. This correction ensures consistency with the updated Terms of Reference and accurately reflects the Committee’s strategic focus on waste avoidance and resource recovery.
Statutory Compliance
The appointment of Committee Members is in accordance with:
· Local Government Act 1995;
· The City of Wanneroo’s Governance Framework;
· The updated Terms of Reference for WARRAC.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
4 ~ A sustainable City that balances the relationship between urban growth and the environment
4.4 - Manage waste and its impacts
Risk Appetite Statement
In pursuit of strategic objective goal 4, we will accept a Medium level of risk. The nature of the City being ‘pro-growth’ means that commercial opportunities will be explored in areas identified for development, potentially challenging perceptions of the City as an environmental steward.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
ST-S29 Waste Services |
High |
|
Accountability |
Action Planning Option |
|
Director Assets |
Manage |
Policy Implications
This action aligns with the City’s strategic waste direction and may inform future updates to relevant City waste policies and guidelines, including operational service frameworks and education strategies.
Financial Implications
There are no direct financial implications associated with the appointment of additional Council Members to the Committee.
Voting Requirements
Absolute Majority
|
Moved Cr Miles, Seconded Cr Wright Nomination from the floor received from Cr Seif for member. Nomination from the floor received from Cr Bedworth for member. Nomination from the floor received from Cr Herridge for member.
That Council:
1. APPROVES the amended name of the Waste Advisory and Resource Recovery Advisory Committee to the Waste Avoidance and Resource Recovery Advisory Committee; and
2. APPOINTS BY ABSOLUTE MAJORITY under section 5.10(1)(a) of the Local Government Act 1995 up to three additional Council Members, to the Waste Avoidance and Resource Recovery Advisory Committee: a) Councillor Seif b) Councillor Bedworth c) Councillor Herridge
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
|
1⇩. |
Attachment 1 - Nomination Form - Committee Member - Waste Avoidance and Resource Recovery Advisory Committee |
25/284254 |
|
Cr Miles declared an impartiality interest in AS06-08/25 due to being a representative for the City of Wanneroo on the Mindarie Regional Council.
Cr Wright declared an impartiality interest in AS06-08/25 due to being a representative for the City of Wanneroo on the Mindarie Regional Council.
File Ref: 44800 – 25/282395
Responsible Officer: Director Assets
Attachments: 2
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To seek Council’s endorsement of the City’s submission on the Mindarie Regional Council’s (MRC) Business Plan for the proposed major land transaction and major trading undertaking at the Neerabup Facility (NF), relating to Food Organics and Garden Organics (FOGO) processing.
Background
The MRC has released a Business Plan (Attachment 1) pursuant to Section 3.59 of the Local Government Act 1995, proposing to refurbish and recommission the Neerabup Facility to process FOGO waste. MRC has published a Public Notice inviting submissions by 15 September 2025 on the Business Plan (the Plan).
The Plan includes leasing the NF to a contractor for a term of up to 15 years to deliver FOGO services to member councils, as well as potentially to other local governments and commercial entities.
The NF has been non-operational since August 2021 and is currently under care and maintenance. The proposed project aligns with the State Government’s Waste Avoidance and Resource Recovery (WARR) 2030 Strategy and seeks to address the region’s infrastructure gap for organics recovery.
Detail
Administration has reviewed the Plan and prepared a submission (Attachment 2) reflecting its strategic position and operational priorities.
The submission outlines the following:
· Comments on the Plan identifying the areas requiring further clarification or amendment;
· City’s main concerns; and
· Recommendations.
The submission also outlines areas requiring further clarification or amendment, including:
· The need to prioritise FOGO processing over garden organics (GO) waste;
· Ensuring equitable access and pricing structures for member councils;
· Transparent contractor selection and performance monitoring mechanisms;
· Opportunities for regional collaboration and commercial partnerships;
· Excision of the southern portion of the Neerabup site from the proposed land transaction to preserve future strategic land use options; and
· Consideration of an alternative model for contract administration following the closure of the Tamala Park landfill, to ensure continued regional governance and operational efficiency.
The submission conditionally supports the repurposing of the NF for FOGO processing, recognising the following benefits:
· Activation of an existing regional asset to deliver FOGO processing capacity.
· Reduction in landfill disposal costs and associated environmental impacts.
· Potential financial returns through gate fees and reduced transport costs.
· Alignment with the City’s Strategic Waste Management objectives.
Consultation
Internal consultation has been undertaken with relevant officers within the Waste Services unit as well as the MRC Strategic Working Group. The submission reflects the City’s endorsed waste management strategies and aligns with broader regional and state policy frameworks.
Comment
At a high level, the concept to repurpose RRF to a FOGO processing facility is supported subject to MRC accepting the City’s suggested recommendations outlined in the submission (Attachment 2).
The project presents a significant opportunity to enhance regional waste recovery infrastructure and contribute to long-term sustainability goals by repurposing the existing RRF to a FOGO processing facility.
As the primary purpose is FOGO processing, GO processing should not be included unless it is supplementary to the primary FOGO function. The southern portion of the site should be excluded from the transaction to retain flexibility for future strategic use.
Administration notes that it is currently unable to provide a recommendation or advice regarding the City’s participation in MRC’s potential FOGO processing contract. This is due to the absence of key details such as contract tenure, commercial terms, and member councils’ obligations. Once MRC provides the relevant information, Administration will prepare a separate report for Council’s consideration on the City’s participation (or otherwise) in the MRC’s potential FOGO processing contract.
By the City providing a formal submission to MRC on the Plan, there may be a perception that the City is supportive of MRC entering into a FOGO processing contract with one of the preferred tenderers. Therefore, subject to Council’s decision on the recommendations made in this report, it is proposed that administration clarifies the City’s position to MRC in writing.
Statutory Compliance
The City’s submission responds to the Mindarie Regional Council’s Business Plan issued under Section 3.59 of the Local Government Act 1995, which governs major land transactions and trading undertakings. The City’s engagement in this process ensures compliance with statutory obligations and supports transparent regional governance.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
4 ~ A sustainable City that balances the relationship between urban growth and the environment
4.4 - Manage waste and its impacts
Risk Appetite Statement
In pursuit of strategic objective goal 4, we will accept a Medium level of risk. The nature of the City being ‘pro-growth’ means that commercial opportunities will be explored in areas identified for development, potentially challenging perceptions of the City as an environmental steward.
The City also recognises the potential for long-term environmental, financial, and operational benefits in relation to regional waste infrastructure projects. The City supports innovation and collaboration in waste management, provided that risks are clearly identified, mitigated, and aligned with strategic objectives and community expectations.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
ST-S29 Waste Services |
High |
|
Accountability |
Action Planning Option |
|
Manager Waste Service |
Manage |
|
Risk Title |
Risk Rating |
|
ST-S23 Stakeholder Relationship |
Medium |
|
Accountability |
Action Planning Option |
|
Chief Executive Officer |
Manage |
Policy Implications
The submission aligns with the City’s Waste Plan, the Local Environmental Strategy, and the State Government’s proposed WARR 2030 Strategy. It reinforces the City’s commitment to sustainable waste practices, regional collaboration, and responsible land use planning.
Financial Implications
While the proposal presents potential financial benefits such as reduced landfill costs and indicative revenue from gate fees, the current Business Plan lacks sufficient detail to fully assess financial impacts. The City’s submission requests:
· A comprehensive breakdown of expected costs and returns;
· Clarification on administration fees and their impact on member councils; and
· Disclosure of lease income and its intended use.
These considerations are essential to ensure financial sustainability and equitable outcomes for all participating councils.
Voting Requirements
Simple Majority
|
Moved Cr Rowe, Seconded Cr Figg That Council:- 1. ENDORSES the City’s submission (Attachment 2) on the Mindarie Regional Council’s Business Plan for the Neerabup Facility FOGO Processing Project (Major land transaction and major trading undertaking); 2. AUTHORISES the Chief Executive Officer to: a) Lodge the endorsed submission with Mindarie Regional Council’s Chief Executive Officer; and b) Advise Mindarie Regional Council that the City’s submission does not constitute its participation in MRC’s potential FOGO processing contract with one of the preferred tenderers; and 3. Following the receipt of further information from Mindarie Regional Council, SEEKS a further report to consider the City’s participation in MRC’s potential FOGO processing contract with one of the preferred tenderers.
11/3
For the motion: Mayor
Aitken, Cr Coetzee, Cr Figg, Cr Herridge, Cr Miles,
Against the motion: Cr Bedworth, Cr Berry and Cr Moore |
Attachments:
|
1⇩. |
Attachment 1 - Final Business Plan FOGO Major trading undertaking and land transaction (Website-Version) |
25/290508 |
|
|
2⇩. |
Attachment 2 - City’s Submission on the Mindarie Regional Council’s Business Plan – Neerabup Facility FOGO Processing |
25/282517 |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Mr Gault left the meeting, the time being 8:12PM
Community & Place
File Ref: 48228 – 25/190417
Responsible Officer: Acting Director Community & Place
Attachments: 3
Changes to Report and Additional Information Arising from Agenda Briefing
In response to the question on the structural issues and regular inspections on the balcony, the following advice is provided:
· A structural building assessment completed in 2023 identified potential safety concerns due to cracking observed along the surface of the balcony. Following the consultant’s recommendation, temporary supports were installed as an interim measure which was considered to adequately address the safety concerns until such time as a more permanent solution was progressed. A further building structural assessment conducted in May 2025 did not highlight any further structural issues relating to the balcony.
Issue
To consider concept designs and funding for changeroom upgrades at the Kingsway Football and Sporting Club facility at Kingsway Regional Open Space.
Background
The Kingsway Football and Sporting Club facility is located at Kingsway Regional Open Space on the AFL/Cricket/Athletics oval (refer Attachment 1) and is used by six clubs/associations across both winter and summer sporting seasons. The changerooms and toilet facilities are used extensively across both seasons due to the high participation rates in the sports, particularly AFL and athletics.
The existing changerooms within the Kingsway Football and Sporting Club facility at Kingsway Regional Open Space were built in 1978. They are not consistent with contemporary standards for sporting change rooms and no longer meet the needs of the clubs or the growing number of spectators. The facility does not comply with current accessibility standards as there is no Universal Accessible Toilet (UAT) or ambulant toilets. Due to the increase in participation, particularly in females, the facility is no longer fit for purpose with limited changeroom space and no dedicated umpire facilities. Additionally, there are functionality and safety issues associated with the upper-level balcony.
A complaint was received from a spectator in a wheelchair regarding the lack of a public UAT. The resident clubs have also raised concerns with the City over the limited number of toilets and outdated changerooms. In response, a three-year capital project PR-4551 was initiated to upgrade the lower-level facilities of the Kingsway AFL pavilion and was listed as:
|
Year |
Work Type |
Cost |
|
2024/25 |
Concept design and consultation |
$15,000 |
|
2025/26 |
Detailed design and costings |
$50,000 |
|
2026/27 |
Construction |
$842,243 |
|
Total |
$907,243 |
|
Regarding the upper-level balcony, a structural building assessment completed in 2023 identified safety concerns due to cracking caused by long-term stress and poor load distribution. In response, temporary supports were installed as an interim measure. A design for a permanent support was prepared in 2023/24 with an estimated cost of $66,895. However, the design has not been implemented due to complications with the underground services obstructing the footing locations.
This structural issue is directly linked to the broader challenge of upgrading the facility. The need for an integrated solution is required to address both the balcony’s structural deficiencies, and upgrade the existing change room and toilet amenities to a contemporary standard to meet the needs of user groups and incorporate essential accessibility upgrades, such as the UAT.
Detail
Initial concepts and options to address the issues with the facility were investigated in 2024/25 with the aim of delivering the following scope:
· UAT facilities.
· Umpires changing facilities.
· First aid room.
· Additional male and female toilets.
· Refurbishment of the existing changerooms and wet areas.
· Demolition of the existing balcony and provision of a new roof top terrace in its place to address the known issues with the balcony.
However, a viable concept was not able to be achieved within the available budget due to design complexities and limitations of the existing building structure.
Revised Concept Design
Further discussions were held with the architect to see what could be achieved within the project construction budget of $842,243 whilst still addressing the key project deliverables and providing a long-term solution to the balcony. The architect subsequently suggested a revised design approach that included:
· A small extension of the building to support the balcony, which would provide the additional space to accommodate new facilities (UAT, umpires facilities, additional toilets etc);
· A full refurbishment of existing changerooms with only a small reduction in the current changeroom space;
The estimated cost of this approach was $1.1M.
Structural Assessment & Final Design Options
After reviewing all available options, a further assessment of the overall building’s structural integrity (not just the balcony) was requested to help inform the next steps. This included an updated structural report and two concept design options - Concept Design Option 1 (Attachment 2) and Concept Design Option 2 (Attachment 3).
The building structural assessment was completed in May 2025 and confirmed that the remainder of the building is in excellent structural condition, with minimal signs of damage. The assessment also confirmed that all existing masonry walls were load-bearing, which would present challenges for any major internal building changes.
A summary of the two Concept Design Options is listed below.
|
|
Concept Design Option 1 |
Concept Design Option 2 |
|
Inclusions |
Internal modifications to the existing changerooms, along with a new southern extension to the building that will incorporate a Universal Access Toilet (UAT), umpire facilities, additional toilets, and refurbishment works. |
Removal of two key load-bearing walls and would require maintaining the slab support line through significant structural re-design, temporary propping, and relocation of a key wall between changeroom 1 and 2 which provide a UAT, additional toilets, umpires facilities and a first aid room. |
|
Structural Engineer Advice |
More viable solution considering design practicality, constructability, reduced temporary works, and overall cost effectiveness. |
Given the extent of the work required this option is unlikely to be feasible without substantial investment and detailed engineering input.
While the cost estimate is lower there are concerns that this option presents a high risk of cost escalation, longer delivery times, and potential for scope creep, which would comprise the project’s ability to meet its original objectives.
Option 2 is not recommended based on these findings. |
|
Cost Estimate |
$2,054,627 |
$1,055,655 |
Concept Design Option 1 provides a range of benefits, including a UAT, additional public toilets and much needed internal upgrades, while also addressing the structural issues associated with the existing balcony. It retains a usable changeroom space and is more straightforward to build, reducing risk during construction.
Concept Design Option 2 is cheaper but comes with several compromises – it reduces usable changeroom space, keeps the outdated fit-out, doesn’t deliver any additional public toilets and doesn’t resolve the balcony propping issues. It also involves complex structural work which increases risk and uncertainty.
Administration is now seeking Council’s approval to proceed with Option 1.
Consultation
Administration has liaised directly with the Kingsway Football and Sporting Club regarding the proposed concept plans, and the Club has confirmed its support for Option 1.
Comment
After reviewing design options and the structural assessment, Concept Design Option 1 is considered to be the most practical and achievable solution as it provides essential upgrades (UAT, umpire facilities, additional toilets, and refurbishment) while also addressing balcony structural issues. Although cheaper, Concept Design Option 2 delivers a reduction in usable changeroom space, and involves extensive structural challenges and higher risks, which make it less viable.
Overall, Option 1 provides the most balanced solution in terms of cost-effectiveness, ease of construction, and long-term functionality to accommodate both current and future user needs whilst also ensuring the balcony issue is addressed to mitigate potential safety issues in the future.
As well as the upgrade to the change rooms and toilets in the existing Kingsway Football and Sporting Club facility, Council should note that the City is also installing a modular change room facility at the site using funding provided from the 2022 federal election. This is a separate project (PR-4603) listed in the current 2025/26 capital works program with total funding of $880,727. The purpose of this facility is to provide additional change room spaces to facilitate female participation, which can’t be accommodated in the existing Kingsway Football and Sporting Club facility. Council is also being asked to consider the tender for the design and construction of this modular facility as part of a separate report on this Council meeting agenda.
Together, these two projects form a coordinated approach to improving the overall functionally and inclusivity of the site. The modular facility provides immediate, flexible changeroom space to accommodate increased participation, while the upgrade of the existing building addresses long-term structural, accessibility and compliance issues and delivers additional elements to support the extensive use of the facility by the community.
Lease status
The Kingsway Football and Sporting Club occupies the site under a lease with the City, with hire arrangements for the adjacent sporting facilities and oval areas. The lease commenced on 19 July 2024 for a 5 year term, with no further option for renewal.
Although the status of the lease is not the subject of this report, if an adjustment to the premises area was required as a result of the proposed works, this is expected to be addressed by a variation or additional area lease (for the amended premises area) and would be capable of signing by the City under existing authorisations and delegations.
Statutory Compliance
Nil.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
1 ~ An inclusive and accessible City with places and spaces that embrace all
1.3 - Facilities and activities for all
Risk Appetite Statement
In pursuit of strategic objective goal 1, we will accept a Medium level of risk. The recent pandemic has challenged our previous event delivery, place activation and community connection processes, and the City accepts that meeting community expectations in a more restrictive environment needs flexibility and innovation if community connection is to develop and grow in contrast to social and individual isolation.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
ST-G09 Long Term Financial Planning |
Low |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
|
Risk Title |
Risk Rating |
|
ST-S23 Stakeholder Relationships |
Medium |
|
Accountability |
Action Planning Option |
|
Chief Executive Officer |
Manage |
Policy Implications
Nil.
Financial Implications
The changeroom upgrade at the Kingsway Football and Sporting Club facility at Kingsway Regional Open Space project is currently listed in the City’s draft Long Term Financial Plan as:
|
Year |
Work Type |
Cost |
|
2025/26 |
Detailed design and costings |
$50,000 |
|
2026/27 |
Construction |
$842,243 |
|
Total |
$892,243 |
|
The cost estimates and construction funding shortfall for the Concept Design Options are:
|
Concept Design |
Total Cost |
Construction Shortfall |
|
Option 1 |
$2,054,627 |
$1,212,384 |
|
Option 2 |
$1,055,655 |
$213,412 |
Should the decision be made to proceed with Concept Design Option 1, Administration will submit a Community Sporting and Recreation Facilities Fund (CSRFF) application for a 2026/27 Forward Planning Grant of $684,876. Applications for CSRFF funding close in September 2025. If the CSRFF application was successful it would reduce the City’s municipal contribution towards the construction to $1,369,751, as per below:
|
Year |
Work Type |
Muni |
Grant |
Total |
|
2025/26 |
Detailed Design and Costings |
$50,000 |
$0 |
$50,000 |
|
2026/27 |
Construction |
$1,369,751 |
$684,876 |
$2,054,627 |
|
Total |
$1,419,751 |
$684,876 |
$2,104,627 |
|
This represents a current $527,508 shortfall for construction (i.e. $1,369,751 - $842,243).
Voting Requirements
Simple Majority
|
Moved Cr Herridge, Seconded Cr Rowe That Council:- 1. ENDORSES Concept Design Option 1 (Attachment 2) as the preferred approach; and 2. LISTS an additional $1,212,384 in the City’s Long Term Financial Plan in 2026/27 to fund the construction of the Kingsway Football and Sporting Club Facility Changeroom Upgrade, comprising $527,508 from municipal funds and $684,876 from a CSRFF grant.
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Attachments:
|
1⇩. |
Attachment 1 - Site Aerial Plan |
25/190435 |
|
|
2⇩. |
Attachment 2 - Concept Design Option 1 |
25/190436 |
|
|
3⇩. |
Attachment 3 - Concept Design Option 2 |
25/190439 |
|
CP02-08/25 Community Facilities Planning Framework
File Ref: 30098V001 – 25/244616
Responsible Officer: Acting Director Community & Place
Attachments: 7
Previous Items: CP02-03/25 - Community Facilities Planning Framework - Ordinary Council - 25 Mar 2025
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To consider the updated Community Facilities Planning Framework.
Background
The City of Wanneroo (the City) holds a primary role in providing community facilities, which is an all-encompassing term for all public open space (POS) and buildings that the City owns freehold or manages on behalf of the State of Western Australia or another organisation. This includes, but is not limited to parks, play spaces, sports grounds, libraries, aquatic and recreation centres and arts, events and cultural spaces.
Given the continued growth of the City and its community assets, the need for an evidence-based, strategically-focused facility planning and provision process has become a priority. Accordingly, Administration prepared a Community Facilities Planning Framework (the Framework) as an overarching document to provide a structure for the effective and efficient planning of new and existing community infrastructure.
The Framework was considered by Council at its Ordinary Council Meeting (OCM) in March 2025, where it resolved:
“That Council in principle supports the Community Facilities Planning Framework subject to the following:
1. REQUESTS Administration to send the Full Framework back to Otium Planning Group Pty to update the contents of the Framework to the latest available data including, but not limited to:
a. Demographic and population data and forecasting
b. Document reviews (internal and external)
c. LGA benchmarking and trend data
d. City of Wanneroo existing asset inventory and facility utilisation
e. Updating all appendices
2. REQUESTS Administration to bring back the full updated Community Facilities Planning Framework report back to an Ordinary Council Meeting no later than August 2025 for endorsement.
3. REQUESTS further information to be provided to Council members as an attachment within the report on:
a. The net impact of adopting the new standards of provision with a breakdown by facility
b. Integration with the long term financial plan including information on the financial implications of those net impacts.”
The intent of this report is to provide Council with the updated information as requested in the March OCM resolution and to seek final endorsement of the Framework.
Detail
The draft Framework was completed in 2023 (Attachment 1), comprising a technical document that included:
· A demographic profile of the City of Wanneroo
· A review of a number of City and state government policies, procedures and documents
· A review of industry standards
· Local government authority benchmarking – community facility provision
· Analysis of facility utilisation
· Standards of provision
· Key findings and recommendations
· An implementation plan
March OCM Resolution 1) – Updating Contents of the Framework
To address resolution item 1) from the March OCM, all supporting data and information, (including demographic and population forecasts, internal and external document reviews, LGA benchmarking and trend analysis, the City’s existing asset inventory, and facility utilisation data) has been reviewed and updated using the most recent available sources. The Framework document and its appendices have been reviewed and revised to reflect this latest data. Attachment 2 outlines the specific updates that been made in accordance with this resolution.
In collating and reviewing the updated information, Administration’s assessment is that there are no changes required to the four key recommendations in the Framework.
Framework Recommendations
The Framework outlines a series of recommendations that support a more strategic, consistent, and evidence-based approach to community facility planning and provision. Administration is supportive of these recommendations, with each playing a key role in shaping future facility planning.
Recommendation 1: Planning Principles
It is recommended that the City adopt the identified planning principles below, against which any new facility or upgrade will be assessed prior to investment.
|
Principle |
Short Description |
|
Quality planning and provision |
Quality in planning and provision of community facilities should reflect the needs and aspirations of the community while contributing to a sense of place. |
|
Functional and fit-for-purpose |
All community facilities should be planned and developed in accordance with their intended use, to ensure that they will meet the functional needs of the community, and be capable of accommodating various activities and the expected number of users. |
|
Diversity, flexibility and adaptability |
Ensure that a diverse range of fit-for-purpose community facilities are provided across the City, which are responsive to community needs, and will be available for future generations. |
|
Access and equity |
Equitable provision of facilities that are intergenerational, promote the diversity of our community and meet community needs, including consideration of personal safety. |
|
Integration and connectivity |
Community facilities will be integrated and co-located with the urban and natural environmental with a view to enhance and complement the place area. |
|
Safety and security |
For a place to function effectively it must be safe and the City must prioritise the safety and security of the community through the planning and design process of a community facility. |
|
Environmental sustainability |
The provision of community facilities must be balanced between the current and future needs of the community and that of the environment. |
Following discussions with Council, there are two additional Planning Principles proposed to be incorporated into the Framework.
|
Principle |
Short Description |
|
Cost Effective Design |
Ensuring ratepayers are receiving value for money by utilising cost and value engineering throughout the project life cycle, streamlining designs and processes and using economic tools and models to evaluate building investment parameters. |
|
Continual design and delivery improvements |
Seeking and incorporating learnings from reviews of delivered facilities into the development of new projects. Building institutional knowledge to increase optimisation of facilities and savings. |
Recommendation 2 : Standards of Provision
That the City adopts the Standards of Provision provided in Attachment 2, which sets out the hierarchy of provision of community facilities and their functions within the City. This includes aligning the current classification network for community facilities with these Standards of Provision.
Recommendation 3 : Community Facility Planning Document Hierarchy
The Framework sets out a hierarchy of documents for adoption that influence / input one another, culminating in the allocation of funds onto the LTFP / annual budget. This will inform a range of future works to be undertaken following the adoption of the Framework.
Recommendation 4 : Community Facility Prioritisation Matrix
The prioritisation of community facility projects should be an iterative process, periodically reviewing and adjusting priorities based on evolving needs, available resources and changing circumstances. Assessing the potential impact and benefits of each project will give priority to projects that have the greatest cost benefit or value for money.
Projects will be assessed and ranked against a criterion or factors, and then prioritised and translated into an implementation plan, and the City’s CWP. A community facility prioritisation matrix has been developed as part of the Framework (Attachment 4 & 5) to assist the City in assessing and prioritising the development, renewal or upgrade of a facility.
Consultation
No external consultation has been undertaken at this time. The implementation of the Framework would require external consultation for some elements, such as the Community Infrastructure Plans. This consultation would be undertaken in accordance with the City’s Community Engagement Policy.
Comment
The Framework establishes a more quantitative and adaptable approach to planning community facilities, to respond to the City’s growth and shifting community needs. It provides a high level structure for the future development, renewal and rationalisation of infrastructure such as play spaces, sporting reserves, community centres, shared-use buildings and lifelong learning hubs.
Following the presentation to the March OCM, all supporting documents have been updated with the latest available data, including population forecasts, policy and document reviews, LGA benchmarking, asset inventory, and facility utilisation. Appendices have also been reviewed and revised to align with these updates.
Certain facilities (e.g. golf courses, bridle trails, natural areas, private facilities) are excluded from the Framework; however, its principles and standards may still be applicable to these areas.
The Framework, and the resulting standards will enable the City to:
· identify where potential gaps or overprovision of community facilities exist within the City, as well as ensuring an equitable distribution ration is established;
· make improvements to existing facilities to an appropriate level, where a deficiency or under provision can be found. This includes connectivity and accessibility to and within community facilities, ensuring that essential core infrastructure is developed to support and assist community groups, clubs and organisations to be self-sufficient and sustainable into the future; and
· provide a diverse range of community facilities that encourage residents and visitors to enjoy quality lifestyles and opportunities to live, work and play.
The Framework will also enable the City to develop further strategic documentation through an Implementation Plan, which will support decisions to ensure community facilities are provided, developed and managed in a sustainable manner. This documentation will include, but is not exclusive to:
· Community Infrastructure Plans;
· Regional Open Spaces strategy;
· Dog exercise space strategy;
· Playspace strategies;
· Skate and BMX strategy; and
· Design guidelines
The Implementation Plan also outlines a number of recommendations and has been broken down into the following timeframes:
· Immediately - as soon as practicable possible, usually within 12 months
· Short term - 12 months to 2 years
· Medium Term - 3 to 5 years
· Long Term - Accounts for projects that have no timeframe and are likely to be triggered based on need or formal requests
· On-going - regular and consistent planning and dialogue required throughout the delivery of the project.
Some of the recommendations and / or strategies to be addressed in the immediate to short term (based on priority order) include:
1. Adoption and implementation of the Framework, including all recommendations;
2. Development of Community Infrastructure Plans;
3. Development of a Sports Facility Floodlighting Replacement Plan;
4. Development of Building Design Guidelines;
5. Development of Building Specifications
o This work has been completed and reviewed in 2024. It is imperative that the City ensure that all assets (new, renewed or upgraded) adhere to the Building Specifications.
6. Development of a Playspace Strategy / Plan; and
7. Development of Landscape Design Guidelines.
The table below provides an indicative timeline for the Implementation Plan.
|
Community Facilities Planning Framework Implementation |
2025/26 |
2026/27 |
2027/28 |
2028/29 |
2029/30 |
|
Community Infrastructure Plans |
|
|
|
|
|
|
Developing coastal |
X |
|
|
|
|
|
Established coastal |
X |
|
|
|
|
|
Central Wanneroo |
X |
|
|
|
|
|
Established Southern |
X |
|
|
|
|
|
Established Rural |
|
X |
|
|
|
|
Conservation |
|
X |
|
|
|
|
Developing Industrial |
|
X |
|
|
|
|
Transitional Rural |
|
X |
|
|
|
|
Established Industrial |
|
X |
|
|
|
|
Other Documents |
|||||
|
Develop a Sports Facility Floodlighting Replacement Plan |
X |
|
|
|
|
|
Develop Building Design Guidelines |
X |
X |
|
|
|
|
Sports Strategy (including a Regional Sports Strategy) |
|
X |
|
|
|
|
Hard Courts Strategy |
|
X |
|
|
|
|
Develop a suite of Standard Drawings for common infrastructure |
|
X |
|
|
|
|
Prepare a Playspace Strategy / Plan (Stage 1 - Audits, Stage 2 - Consultant and Preparing the plans) |
|
|
X |
X |
|
|
Develop Landscape Design Guidelines |
|
|
X |
X |
|
|
Develop a Park Lighting Position Paper |
|
|
|
X |
X |
|
Skate and BMX Strategy / Plan |
|
|
|
X |
X |
|
Fenced Off-Leash Dog Area Strategy |
|
|
|
X |
X |
|
Functional Building Audits |
X |
X |
X |
X |
X |
|
Community facility access audits |
X |
X |
X |
X |
X |
Statutory Compliance
Nil.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
1 ~ An inclusive and accessible City with places and spaces that embrace all
1.3 - Facilities and activities for all
Risk Appetite Statement
In pursuit of strategic objective goal 1, we will accept a Medium level of risk. The recent pandemic has challenged our previous event delivery, place activation and community connection processes, and the City accepts that meeting community expectations in a more restrictive environment needs flexibility and innovation if community connection is to develop and grow in contrast to social and individual isolation.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
ST-S23 Stakeholder Relationships |
Medium |
|
Accountability |
Action Planning Option |
|
Chief Executive Officer |
Manage |
|
Risk Title |
Risk Rating |
|
ST-SG09 Long Term Financial Plan |
Low |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
Policy Implications
The Framework links to a number of existing City policies such as:
· Local Planning Policy 4.3: Public Open Space;
· Facility Hire and Use Policy;
· Sports Floodlighting Policy; and
· Joint Development and Shared Use Facilities with the Department of Education Policy.
Future reviews of these policies would seek to align them with the intent of the Framework, if adopted by Council.
Financial Implications
The implementation of the Framework will require additional resources in consultancy services to complete the priority actions in the Implementation Plan. The net cost of this work is expected to be approximately $100,000 per year for the first three years of the Implementation Plan, which is when the bulk of the work is required. These funds would be included in operational budgets each year for Council’s consideration.
In response to March OCM resolution 3a) and 3b), Administration has undertaken an updated mapping exercise to determine the quantum of facilities required to accommodate the needs of a population of 437,000 by 2046, using the Framework’s Standards of Provision (population-based method) to determine the number of each facility type (Attachment 7). The mapping exercise also compares this quantum of facilities to what is currently listed in the City’s draft Long Term Financial Plan (LTFP) to determine if there is a ‘gap’ in the LTFP. Commentary is also provided in relation to different facility types where gaps are identified.
For the majority of Local, Neighbourhood and District facility types where a gap is identified, these are likely to be delivered by land developers as urban land is progressively structure planned, and subsequently subdivided and developed. Therefore, they are not required to be included in the LTFP, however asset renewal costs will need to be considered in the future when these assets reach the end of their useful life.
The only facility type where there is a clear impact on the LTFP is in the provision of Sports Pavilions / Change Room facilities for Neighbourhood Sports Spaces. For these facilities there is a gap of potentially up to 52 facilities based on the projected total population at 2046. These Sports Pavilions / Change Room facilities are estimated to cost in the range of $2.5M to $4M each, depending on the site and primary function (i.e. to cater for junior or senior sport). In total, this would equate to approximately $150M needing to be added to the LTFP if it was determined that all of these facilities were required and delivered within the LTFP timeframe of 20 years. This represents an overall increase to the LTFP of 7%.
In considering the impact of providing these facilities, it is important to note that the actual number required, their timing of delivery and their cost impact will be guided by a range of factors, including:
a) the number of neighbourhood sports spaces provided for in Local Structure Plans, which, in reality, may be different than what is proposed by the Framework’s Standards of Provision;
b) the timing of the delivery of these neighbourhood sports spaces, which is linked to the development of residential areas and guided by demand and market forces;
c) individual facility needs assessments, which would inform whether there is an actual need for the facility and, if so, the suggested timing of delivery; and
d) external funding opportunities which often means that one third of the construction costs (and sometimes more) can be met through external funding opportunities.
Administration also notes that whilst the Standards of Provision in the Framework suggest an indicative number of Neighbourhood Sports Pavilions / Change Rooms facilities that are likely to be required, these facilities will need to be provided regardless of the Framework because they are important to help activate sports open space and support participation in sport and recreation activities as new regions of the City are developed and local communities grow. On this basis, the LTFP would still need to consider the funding of these Neighbourhood Sports Pavilions / Change Rooms facilities.
On adoption, the Framework will be used to develop the City’s Community Infrastructure Plans (CIP), which are the documents that will identify the specific number, type and location of community facilities required in different places across the City. The recommendations of the CIP will subsequently inform the development of Capital Expenditure Plans (CEP) which will refine and detail individual project costs, risks, timelines, priority ranking and analysis. This process will address the effective delivery of appropriate current and future community facilities and associated infrastructure. Additionally the CIPs and CEPs will demonstrate the need and nexus that is needed when seeking developer contribution funds, and thus informing Developer Contribution Plans.
The CIPs and CEPs will also provide additional rigour in the annual review and updates of the LTFP to ensure it presents a realistic prediction of future budget forecasting for community infrastructure.
Voting Requirements
Simple Majority
|
Moved Cr Smith, Seconded Cr Figg That Council:- 1. ENDORSES the Community Facilities Planning Framework (Attachment 1) incorporating the four recommendations and the implementation plan; and 2. ENDORSES the inclusion of ‘Cost Effective Design’ and ‘Continual Design and Delivery Improvements’ as two additional principles in the Planning Principles recommendation of the Community Facilities Planning Framework. Amendment
Moved Cr Wright, Seconded Cr Miles
To add a third item as Recommendation 3:
3. REQUESTS the Fenced Off-Leash Dog Area Strategy be brought forward to 2026/27 in the implementation plan.
With the consent of the mover and seconder, Recommendation 3 was added.
Substantive Motion as Amended
That Council:- 1. ENDORSES the Community Facilities Planning Framework (Attachment 1) incorporating the four recommendations and the implementation plan; and 2. ENDORSES the inclusion of ‘Cost Effective Design’ and ‘Continual Design and Delivery Improvements’ as two additional principles in the Planning Principles recommendation of the Community Facilities Planning Framework. 3. REQUESTS the Fenced Off-Leash Dog Area Strategy be brought forward to 2026/27 in the implementation plan. The substantive motion as amended was put and
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Attachments:
|
1⇩. |
Attachment 1 - Community Facilities Planning Framework |
25/280044 |
|
|
2⇩. |
Attachment 2 - Framework Updates |
25/282285 |
|
|
3⇩. |
Attachment 3 - Standards of Provision |
24/79691 |
|
|
4⇩. |
Attachment 4 - Community Facility Planning Document Hierarchy |
24/79692 |
|
|
5⇩. |
Attachment 5 - Community Facility Prioritisation Assessment Matrix |
24/332147 |
|
|
6⇩. |
Attachment 6 - Community Facilities Prioritisation Assessment Criteria |
25/74363 |
|
|
7⇩. |
Attachment 7 - Impact of Adoption of Standards of Provision |
25/250534 |
|
The Mayor adjourned the meeting at 8:23PM for ten minutes to allow Council Members a break before resuming the meeting.
There were no speakers to Item CP03-08/25 prior to the adjournment
The meeting resumed at 8:35PM.
File Ref: 21392V004 – 25/250198
Responsible Officer: Acting Director Community & Place
Attachments: 2
Previous Items: MN04-02/25 - Cr Coetzee - Investigation into a Mountain Bike Trail in the Alkimos Area - Ordinary Council - 25 Feb 2025 6
Changes to Report and Additional Information Arising from Agenda Briefing
· In the Detail section of the report, under the ‘Strategic Alignment’ heading, add the following text:
WestCycle developed the Perth & Peel Mountain Bike Master Plan in consultation with state government departments, local governments and other user groups and stakeholders. The City of Wanneroo (the City)was consulted on this Plan, however the City’s involvement was limited to providing information on existing BMX facilities within the City at the time.
The Perth & Peel Mountain Bike Master Plan notes that Mountain biking participation in WA is growing rapidly, with around 405,000 people riding weekly, one million annually, nearly 120,000 mountain bikes purchased each year, and 19% of the population owning a mountain bike. A user survey gathered insights into mountain bike use in the region, with 544 respondents revealing that 97% use existing trails, 84% were male, and 68% were aged 30–49. Rider skill levels were reported as 40% advanced, 42% intermediate, and 8% beginner. Based on other facilities that were analysed in the report, it is estimated that an Alkimos facility would be able to accommodate approximately 25,000 to 33,000 visitors per year.
The Yanchep and Neerabup National Parks Recreation Master Plan, which was published by the Department of Biodiversity, Conservation and Attractions in conjunction with the City, makes note of bike usage to get around the park, future commercial bike hire plans, and some unauthorised bike trails within the park. It does not specifically mention mountainbiking or make provision for future mountain bike trails.
· In the Comment section of the report, amend the third paragraph to read as follows:
There are further environmental conditions noted in the Metropolitan Region Scheme for this site, which require the preparation of an environmental management plan to fully understand the environmental features, including any environmentally sensitive areas, and manage the potential impact of any development on the site on native flora and fauna.
· In the Financial Implications section of the report, add the following text:
The cost for the consultant to investigate and prepare the site and viability assessment was $19,166.40.
In response to a question at Agenda Briefing relating to the management of fauna impacted by any development in Parks and Recreation Reserves, the protection and management of all fauna located on a site is the responsibility of the owner of the land, in this case the WAPC. However, the report notes that an environmental management plan would need to be prepared for this site prior to any development of a mountain bike trail in the Alkimos location being considered. This plan would need to identify local wildlife present on the site, and identify appropriate fauna management measures (and associated implementation responsibilities) to ensure that their welfare was not adversely impacted by any approved development works.
Issue
To provide a report on the outcome of an investigation into the viability of a mountain bike trail facility in the Alkimos area.
Background
At the 25 February 2025 Ordinary Council Meeting (OCM), Council considered Motion on Notice MN04-02/25 and resolved:
“That Council REQUESTS Administration to undertake an investigation into the viability of a mountain bike trail facility in the Alkimos area, with a detailed report to be brought to August 2025 Ordinary Council Meeting.”
The proposed location (Attachment 1) for the mountain bike trail is Parcel 324534 (the site) and is currently not owned or managed by the City of Wanneroo (the City), but is under the ownership of the Western Australian Planning Commission (WAPC).
A preliminary GIS investigation has noted the following for the site:
|
Item |
Current Status |
|
Parcel Number |
324534 |
|
Lot Number / Property Type |
Lot 2001 |
|
Ownership |
West Australian Planning Commission |
|
Aboriginal Sites |
No Cultural Heritage on the site. |
|
Bush Forever |
None Listed on GIS |
Detail
Administration engaged a consultant to undertake a site and viability assessment to determine whether the selected parcel of land is suitable for a mountain bike trail facility. With permission from the WAPC, the consultant accessed the site to undertake the assessment and has prepared a report based on their findings. A copy of the report is provided in Attachment 2.
The report outlines the estimated costs to design and construct the trail itself, as well as the associated amenities. It also outlines an estimated cost for the annual maintenance of the facility. The report is summarised below.
Site Description
The proposed site is a large parcel of land located within a key growth corridor and is currently owned and managed by the WAPC. As identified in the Central Alkimos Local Structure Plan, the site is expected to be divided into two land parcels, with one portion designated as District Open Space. This sits adjacent to planned residential and business areas and is well located with strong connections to the Mitchell Freeway, Alkimos Train Station, future path networks and the planned Alkimos town centre.
Topography, Vegetation and Environmental Considerations
The site includes a dune landscape making it suitable for beginner to intermediate-level cross-country and flow trails. The terrain offers natural corridors and ridgelines that could support trail alignment with minimal earthworks. However, the southern portion contains Parabolic Dunes which are steep and highly erodible and are also noted habitat for the endangered Graceful Sun Moth – meaning this section is not suitable for trail development.
The Quindalup Dune soils that dominate the site are not ideal for trail construction and would require the import of materials (e.g. crushed limestone) for trail surfaces and features.
Vegetation across the site is mostly in excellent or very good condition and includes Banksia woodlands, Acacia shrubland and Tuart/Eucalypt pockets. The area north of the Parabolic Dune is also identified as Carnaby’s Black Cockatoo foraging habitat. Any proposed clearing is likely to require referral under the Environmental Protection and Biodiversity Conservation (EPBC) Act 1999. A low-impact trail design would be needed, focusing on using existing disturbed areas and minimising fragmentation.
Trail Suitability and Supporting Infrastructure
The site is well-suited to beginner (green) and intermediate (blue) level trails, with a focus on family-friendly and community use. Based on the site characteristics, the following trail types are considered viable:
· Cross-Country (XC): Making use of the natural terrain.
· Flow Trails: Machine-built sections with berms and rollers.
· Skills/Pump Park: Small-scale feature area (approx. 100m) with rock features, timber bridges etc.
The proposed 10.5 ha District Open Space area provides a good opportunity for trailhead infrastructure, including:
· Car parking
· Toilets and water
· Shaded seating/rest areas
· Signage and wayfinding
· Skills park or pump track
· Potential for lighting and secure bike storage
Feasibility and Considerations
The report summarises key aspects of the trail proposal as follows:
Key Strengths
· Good location within a growing residential catchment.
· Accessible terrain for beginner/intermediate riders.
· Strong connection to transport and town centre.
· Can be integrated with broader recreation planning.
Constraints
· Environmental sensitivity, potential EPBC triggers.
· Unsuitable soil conditions requiring material import.
· High capital investment for trails and infrastructure.
· Site is not currently under City ownership.
Opportunities
· Unique coastal setting adds to user experience.
· Early planning allows for integration into open space planning.
· Low-impact design supports environmental values.
· Could support events and youth engagement.
Risks
· Environmental approvals may be delayed or denied.
· Costs associated with material import and construction.
· Ongoing maintenance and operational resourcing.
Strategic Alignment
WestCycle is the industry body for bike riding in Western Australia and has released a Mountain Bike Strategy 2022 – 2032 that identifies Sustainable Trail Development and Management as a key priority. This focus area provides direction around the on-going maintenance and long-term sustainability of trails. The strategy also outlines an eight-stage trail development process, which guides the maintenance and long-term sustainability of mountain bike trails.
The strategy details a range of governance and management models for trail networks. These will need to be explored further once a site has been identified as appropriate and under the City’s control.
WestCycle also has a Perth & Peel Mountain Bike Master Plan which aims to achieve a total of 575km of purpose-built mountain bike trails across 24 sites in the region. For the northern suburbs it identifies Joondalup, Wanneroo and Yanchep as locations for trail development, with Joondalup (20km of trails, medium priority) and Wanneroo (5km of trails, low priority) listed as local significance. Yanchep (30km of trails, moderate priority) is listed as regional significance. Alkimos is not currently identified as a trail site in this Plan.
The Joondalup location (Yalbunullup Mountain Bike Trails) is situated on the western side of Lake Joondalup and was recently developed, with the trail opening in December 2024.
A proposed location for Wanneroo is within the Koondoola Regional Bushland, with freehold land or Lightning Swamp Bushland proposed as another possible location. This development is considered low priority.
The Yanchep location is considered medium priority and is proposed to be in Yanchep National Park (managed by Department of Biodiversity, Conservation and Attractions). WestCycle’s master plan document notes that Yanchep National Park should be the primary focus to develop a key recreational resource for the northern suburbs population.
Other existing trails in the area
In addition to the Yalbunullup Mountain Bike Trails, the Yaberoo Budjara Heritage Trail is also located in the northern suburbs. This is a 28km trail based on the movement of Yellagonga and his people between Lake Joondalup and Yanchep. It extends from Neil Hawkins Park in the south to Yanchep National Park in the north, traversing tuart and banksia woodland, coastal heath and former wetlands. The trail is popular with walkers, trail runners and mountain bike riders.
Consultation
Administration has liaised with WestCycle regarding the proposed Alkimos trail project and their feedback indicated that Yanchep is the preferred location for a new mountain bike trail in the northern corridor, aligning with the Perth and Peel Mountain Bike Master Plan, which identifies Yanchep as a moderate priority based on future population growth and distance from the CBD. While WestCycle does not determine trail locations, they advised that most trails are generally located on DBCA-managed land, which is also their preference for Yanchep. While Alkimos could be considered as an alternative location, it is not currently identified in their plans. WestCycle also advised that while State Government funding is sometimes available for trail construction, there is generally no ongoing funding for operations and maintenance. They recommend that land managers partner with locally established cycling clubs to lead the future design and long-term maintenance of any trail.
Administration has not currently conducted any broad community engagement for this site. Should this investigation proceed to the next steps, the City will need to consider the appropriate timing and approach to community consultation in line with the City’s Community Engagement Policy.
Comment
Although the site is well located, adjacent to the Alkimos Train Station and north of the proposed Alkimos Activity Centre, it is currently owned and under the management of the WAPC.
There are some constraints that would require further investigation before it could be confirmed whether a mountain bike trail is feasible in this location. The area contains native flora and fauna, which are important considerations. Notably, the southern boundary of the site includes a parabolic dune, which features highly erodible slopes that are not suitable for inclusion in any mountain bike trail network. Additionally, the native soils present on site are considered unsuitable for trail construction, meaning imported materials would be required to support any future trail development.
There are further environmental conditions noted in the Metropolitan Region Scheme for this site, which require the preparation of an environmental management plan to fully understand the environmental features, including any environmentally sensitive areas, and manage the potential impact of any development on the site. Further engagement with the WAPC, as the current landowner and manager, would be required to determine their interest in progressing the preparation of a management plan for this site.
Given the proposed Alkimos location has some constraints and noting the Yanchep National Park as a preferred site within the Perth & Peel Mountain Bike Master Plan, Administration recommends that more consultation is undertaken with relevant state government departments, industry bodies and local user groups to determine preferred location(s) for mountain bike trails within the City’s northern regions and report these findings back to Council by June 2026.
Statutory Compliance
Nil
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
5 ~ A well planned, safe and resilient City that is easy to travel around and provides a connection between people and places
5.2 - Plan for and manage land use
Risk Appetite Statement
In pursuit of strategic objective goal 5, we will accept a Medium level of risk, extended to High in the areas of Community / Reputation & Financial / Commercial impacts. Shifting transport modes and usage in the City may require short term pain for longer term gain as the City supports the development, maintenance and connection of alternatives to car use (e.g. cycle ways) and the supporting infrastructure.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-017 Financial Management |
Medium |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
|
Risk Title |
Risk Rating |
|
ST-S20 Strategic Community Plan |
Low |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
Policy Implications
Nil.
Financial Implications
The total maximum cost for a trail on the proposed Alkimos site, not including any approvals or assessments, would be approximately $2.5 million dollars. This excludes annual maintenance costs and project management fees (approx. 15% of cost) ranging from ~$57,000 to ~$95,000 per year.
There is currently no funding listed within the City’s draft Long Term Financial Plan for a mountain bike trail.
Voting Requirements
Simple Majority.
|
Moved Cr Coetzee, Seconded Cr Figg That Council:-
1. ACCEPTS the Alkimos Mountain Bike Trail Investigation report included at Attachment 2; and
2 REQUESTS Administration undertake consultation with relevant state departments, industry bodies and local user groups to determine preferred location(s) for mountain bike trails within the City of Wanneroo’s northern regions, including the Alkimos site proposed in this report, and report these findings back to Council by June 2026.
Amendment
Moved Mayor Aitken, Seconded Cr Miles
To add a third item as Recommendation 3:
3. SUPPORTS the establishment of an advisory group to investigate the feasibility and staged development of a mountain bike (MTB) trail facility in the Alkimos area, recognising its potential to serve families, schools, recreational riders, tourism, and future competitive events.
With the consent of the mover and seconder, Recommendation 3 was added.
Substantive Motion as Amended
That Council:-
1. ACCEPTS the Alkimos Mountain Bike Trail Investigation report included at Attachment 2; and
2. REQUESTS Administration undertake consultation with relevant state departments, industry bodies and local user groups to determine preferred location(s) for mountain bike trails within the City of Wanneroo’s northern regions, including the Alkimos site proposed in this report, and report these findings back to Council by June 2026.
3. SUPPORTS the establishment of an advisory group to investigate the feasibility and staged development of a mountain bike (MTB) trail facility in the Alkimos area, recognising its potential to serve families, schools, recreational riders, tourism, and future competitive events.
The substantive motion as amended was put and
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Attachments:
|
1⇩. |
Attachment 1 - Site Location |
25/250469 |
|
|
2⇩. |
Attachment 2 - Alkimos Mountain Bike Trail - Investigation Report |
25/250181 |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Corporate Strategy & Performance
File Ref: 52320 – 25/252443
Responsible Officer: Acting Director Corporate Strategy & Performance
Attachments: 5
Changes to Report and Additional Information Arising from Agenda Briefing
The Note 9 to the FAS report was updated to ensure it comprehensively captures all types of assets disposals including the building and fleet plant.
Issue
To consider the Financial Activity Statement for the period ended 30 June 2025.
Background
In accordance with Local Government (Financial Management) Regulations 1996, the Financial Activity Statement has been prepared in compliance with the following:
· Regulation 34(1) and (3) of the Local Government (Financial Management) Regulations 1996, which requires a local government to prepare a statement of financial activity each month, presented according to nature classification;
· Regulation 34(5) of the Local Government (Financial Management) Regulations 1996, which requires a local government to adopt a percentage or value, calculated in accordance with Australian Accounting Standards, to be used in statements of financial activity for reporting material variances. For the 2024/25 financial year 10% and a value greater than $100,000 will be used for the reporting of variances, and
· Regulation 35 of the Local Government (Financial Management) Regulations 1996, which requires a local government to prepare a statement of financial position of the local government as at the last day of the previous month.
Detail
Financial Activity for the Period Ended 30 June 2025 ( Draft Report)
At the Ordinary Council Meeting on 16 July 2024 (CS02-07/24), Council adopted the Annual Budget for the 2024/25 financial year and Mid-Year Review (MYR) adjustments were adopted on 25 February 2025 (CS03-02/25). The figures in this report are compared to the Revised Budget.
The Closing Surplus reported in The Statement of Financial Activity by Nature, Net Current Assets (Attachment1), the Statement of Financial Position (Attachment 2) reported as at 30 June 2025 and Reserve Balances as at June 2025 (Attachment 5) are drafts and subject to change with the end of the year management adjustments and year end audit adjustments.
The year end final Development Contribution Plans, Capital Expenditure budgets and Reserve movements are currently being reviewed and subject to change. Capital works carry forwards have not been adjusted in this Financial Activity Statement.
Overall Comments Year to Date (YTD)
Results from Operating Activities
The Draft Report net amount attributed to Operating Activities is a favourable variance to budget of $7.5m, including non-cash adjustments of $81k. The cash inflow variance to budget is favourable by $6.2m mainly due to higher inflows from Operating Grants, Subsidies & Contributions of $4.6m, Rates of $648k, Fees and Charges of $612k and Interest Earnings of $300k. The cash outflow variance to budget is favourable by $1.2m mainly due to lower than budget operating expenditure on Materials and Contracts of $1.2m, Employee Costs of $503k and Insurance of $123k offset by higher Utility Charges of $206k and Loss on Asset Disposals of $448k.
Results from Investing Activities
The Draft Report is a favourable variance to budget from Investing Activities of $35.3m, including non-cash adjustments of $42.1m. The cash inflow variance to budget is unfavourable by $18.3m due to lower than budget inflows from Contributed Physical Assets of $10.6m, Non Operating Grants, Subsidies & Contributions of $2.0m and Development Contribution Plans – Revenue of $6.4m offset by the higher inflows from and Proceeds from Disposal of Assets of $698k. The cash outflow variance to budget is favourable by $11.5m due to lower outflows from Purchase & Construction of Infrastructure Assets of $3.6m, Purchase of Property, Plant & Equipment of $2.7m and Development Contribution Plans Expenses of $5.1m.
Results from Financing Activities
The Financial Activities net position as per the draft report is higher than budget by $10.3m. The cash inflow variance to budget is unfavourable by $24.7m due to lower Transfers from Reserves of $19.8m and Transfers from DCP’s (Not in Reserve) of $4.8m. The Cash outflows variance to budget is favourable by $35.0m due to lower outflows from Transfers to Reserves of $30.1m and Transfers to DCP’s (Not in Reserve) of $4.8m.
Capital Program
Year to date 30 June 2025, $97.1m (excluding leased assets and contributed physical assets) was spent on various capital projects, of which $28.9m was spent on Sports Facilities, $18.9m was spent on Roads and $14.9m was spent on Community Buildings. (Refer to Attachment 4 for more details on Top Projects).

Investment Portfolio Performance

Comments relating to the Statement of Financial Activity (SOFA) are provided for the variances between YTD Actuals and Revised Budgets, where the variance is higher than the reporting threshold or an item of interest to Council.
Operating Activities
Rates (YTD - Actual $164.4m, Revised Budget $163.7m)
The variance is favourable by $648k mainly due to higher residential Interim Rates of $512k and higher Interim Rates from commercial properties of $208k offset by lower Interim Rates from rural and mining properties of $61k and lower Ex-Gratia Rates of $10k.
Note 2
Operating Grants, Subsidies & Contributions (YTD - Actual $17.4m, Revised Budget $12.8m)
The variance is favourable by $4.6m mainly due to 50% advance payment of Financial Assistance Grant for 2025/26 of $5.5m offset by lower than budget income from Mariginiup Bushfire Cleanup Grant of $1.0 m noting that lower materials and contract expenditure, which will correspond to lower grant income.

Note 3
Fees and Charges (YTD - Actual $54.5m, Revised Budget $53.9m)
The favourable variance of $612k is mainly due to:
· Higher Application, License and Permit Fee Income of $494k mainly from Building Approval Services;
· Higher Inspection Fee income from Compliance Services of $178k;
· Higher Fees and Charges income from Community Facilities and Emergency Management Services of $133k;
· Higher Search Fee Income of $89k from Building Approval and Rates Services;
· Higher Driving Range income mainly from Carramar Golf Course of $14k;
Offset by;
· Lower Engineering Supervision Income of $173k;
· Lower Property Leases and Rental Income of $126k.

Note 4
Interest Earnings (YTD - Actual $21.6m, Revised Budget $21.3m)
The variance is favourable by $301k due to higher interest earned from investments of $261k and higher interest earnings from late payment interest from Rates of $40k.

Note 5
Employee Costs (YTD - Actual $96.4m, Revised Budget $96.9m)
The employee costs are below budget by $504k, mainly due to:
· Lower spending on Training Courses, Travel Expenses and Conference & Seminars Fees expenses of $395k;
· Lower Spending on Personal Protective Equipment of $44k due to delay in receipt of actual orders; and
· Higher cost recoveries from the Cost Allocations to Capital Projects and Project Administration of $69k.

Note 6
Materials & Contracts (YTD - Actual $96.2m, Revised Budget $97.4m)
The Materials & Contracts expenditure is lower than the budget by $1.2m, mainly due to:
· Lower General Material Expenses of $992k mainly related to delay in mulching of various parks and roads, which is now scheduled for 2025-26 financial year.;
· The Contract Expenses are below budget by $616k mainly due to lower contract expenses from Mariginiup Bushfire Cleanup Grant of $1.1m offset by higher Rates Management Contract Expenses of $509k;
· Underutilisation of Software Maintenance, Support & Licence Expenses budget of $282k is partially due to timing of the Software subscription payments and partially due to excess budget.
· Lower Refuse removal expenses of $87k due to reduced tonnages for domestic general waste removal expenses;
· Lower Fuel expenses of $193k mainly due to lower fuel consumption from Emergency Vehicles;
· Lower Contributions Donations or Sponsorship Expenses of $124k due to lower than budget number of qualifying applications for Community Funding Programme;
· The Minor Equipment Expenses are less than budget by $110k from various business units;
· Lower Tyre Expenses of $74k mainly from Waste Vehicles due to major maintenance on Waste Vehicles;
· Lower external Printing Expenses of $68k from various business units;
· Underspend in Advertising Expenses of $134k from various business units;
· Lower Council Member Conference & Seminar Fee Expenses of $70k;
· The Catering Expenses are below budget by $66k;
· Lower Internet Service Provider Expenses of $61k;
Offset by;
· Higher Maintenance Services costs of $2.2m mainly related to Parks and Conservation due to additional sites handed over from Land Development that were not budgeted for, modified scope of works, preparation of sites, and increased costs in traffic management;
· Higher Legal Fee Expenses of $342k.

Note 7
Utility Charges (YTD - Actual $10.9m, Revised Budget $10.7m)
The Utility Charges are above budget by $206k, mainly due to higher electricity expenses of $299k related to higher street lighting costs due to higher than anticipated road handovers by developers, partially offset by lower water consumption expenses of $48k and lower Gas Expenses of $45k.

Note 8
Insurance (YTD - Actual $1.6m, Revised Budget $1.8m)
The Insurance expenses are below budget by $123k, mainly due to lower premium expenses related to Community Facilities and Leased Buildings.

Note 9
Loss on Asset Disposals (YTD - Actual $573k, Revised Budget $125k)
The actual Loss on Asset Disposals is higher than budget by $448k, mainly due to higher than budgeted losses from demolition of a City building, Fleet and Waste Plant disposals.

Investing Activities
Note 10
Non Operating Grants, Subsidies & Contributions (YTD - Actual $29.3m, Revised Budget $31.3m)
The Non Operating Grants, Subsidies and Contribution income is lower than budget by $2.0m due to timing differences of completion of capital project milestones to qualify for grant milestone claims.
Note 11
Contributed Physical Assets (YTD - Actual $59.4m, Revised Budget $70.0m)
The Contributed Physical Assets are lower than budget by $10.6m due to timing differences of Developer Contributions of Infrastructure Assets. Contributed Assets are non-cash contributions, therefore no impact to the final surplus or deficit of SOFA.
Note 12
Proceeds From Disposal of Assets (YTD - Actual $13.8m, Revised Budget $13.1m)
Inflow from Proceeds from Disposal of Assets is higher than budget by $698k mainly due to higher than budget land sales proceeds from Catalina Regional Council.
Note 13
Development Contribution Plans – Revenue (YTD - Actual $29.2m, Revised Budget $35.6m)
The lower inflow of $6.4m from Developer Contribution Plans is due to timing differences of deferred revenue adjustments. Development Contribution Plan expenditure, deferred revenue and provisions are under review.
Note 14
Purchase of Property, Plant and Equipment (YTD - Actual $47.3m, Revised Budget $50.0m)
The lower outflow of $2.7m from the Purchase of Property, Plant and Equipment is due to the timing of actual expenditure.
Note 15
Purchase & Construction of Infrastructure Assets (YTD - Actual $49.8m, Revised Budget $53.5m)
The lower outflow of $3.6m in the Purchase and Construction of Infrastructure Assets is due to the timing of actual expenditure.
Note 16
Development Contribution Plans – Expenses (YTD - Actual $26.2m, Revised Budget $31.3m)
The lower outflow of $5.1m from Developer Contribution Plans is due to timing differences of deferred revenue adjustments. Development Contribution Plan expenditure, deferred revenue and provisions are under review.
Financing Activities
Note 17
Transfers from Reserves (YTD - Actual $40.4m, Revised Budget $60.2m)
Transfer from Reserves is lower than budget by $19.8m due to lower than budget Reserve transfers from multiple reserves. Capital expenditure and reserve transfers process in progress.
Note 18
Transfers from DCP’s (Not in Reserve) and Transfer to DCP’s (Not in Reserve) (YTD - Actual $27.4m, Revised Budget $32.3m)
The lower inflow adjustment from DCPs and the lower outflows to DCPs of $4.8m is due to lower than budget operating activities within the Cells. These are adjustments between Developer Contributions Restricted Cash and Income, which is offset by the adjustment between Developer Contribution expenses and the Liability. Development Contribution Plan expenditure, deferred revenue and provisions are under review.
Note 19
Transfers to Reserves (YTD - Actual $47.2m, Revised Budget $77.4m)
Transfer to Reserves is lower than budget by $30.1m. Capital expenditure and reserve transfers process in progress.
Statement of Financial Position (Attachment 2)

Note 1 - Net Current Assets
Compared to the closing position on 30 June 2024, Net Current Assets have increased by $17.4m, in the Draft Financial Statement for June 2025, predominately due to increased Cash Balances. The Cash position is subject to change with Receipt of accrued income, payments for Operating and Capital expenditures in future and transfers to Reserves to be finalised as part of the end of financial year processes.
Within the Current Assets, Current Receivables of $37.9m are mainly comprised of Rates and Waste Service Fees debtors of $8.3m and Emergency Services Levy of $1.1m. The remaining balance is attributed to General Debtors of $28.5m.
Note 2 - Non-Current Assets
Non-Current Assets as at 30 June 2025 have increased by $94.1m from 30 June 2024 closing balance, due to increase in Infrastructure Assets, Property, Plant & Equipment and Non Current Trade Receivables offset by the decrease in Investments in Associates.
Note 3 - Non-Current Liabilities
Non-Current Liabilities as at 30 June 2025 have increased by $17.4m from 30 June 2024 closing balance, mainly due to an increase in Deferred Revenue from Developer Contribution Plans and Unspent Grant Liabilities associated with Capital Projects.
Financial Performance Indicators
The table below presents data on relevant financial ratios, comparing the minimum standard expected as per the Department of Local Government, Sport & Cultural Industries (DLGSC) as at 30 June 2025 and at the same period of the last year.
A green highlight is used where the minimum standard is met or exceeded. A red highlight is used where the minimum standard is not met.
Please note that the Ratios are based on the Draft Financial Data, which is anticipated to be changed is Audited Statutory Financial Report for 2024/25 Financial Year.
Capital Works Program
The status of the Capital Works Program is summarised by Sub-Program in the table below:
As at 30 June 2025, the City incurred $97.1m of capital expenditure, which represents 93.9% of the $103.5m Revised Capital Works Budget. Whilst the City is making good progress with the Capital Works Program. Draft Report on Capital Works program is excluding the Carry forward adjustments and Developer Contribution income and expenditure final adjustments.

To further expand on the Capital Works Program information above, updates in key capital projects are selected to be specifically reported on and is provided in the Top Capital Projects attachment to this report (Attachment 4).
Capital Changes
It was proposed that the following changes be made to the 2024/25 Capital Works Program.
PR-4247 Wangara Transfer Station, Wangara - Upgrade Site Works – Additional funds of $31,746 were required in 2024/25 to cover increased site costs. This was funded from the Waste Management reserve.
PR-4287 Frederick Stubbs Park, Quinns Rocks, Upgrade Car Park and Surrounds – An additional $48,497 was required in 2024/25 for advanced construction works. This was funded from the Coastal Infrastructure Management reserve.
PR-4347 Flynn Drive Neerabup, Upgrade from Wanneroo Rd to Old Yanchep Rd – Additional funds of $42,261 were required in 2024/25 due to advanced construction works. This was funded from Federal Government grants. Construction is scheduled to continue into 2025/26.
PR-4357 Gumblossom Community Centre, Quinns Rocks, Upgrade Works – Advanced works necessitated an additional $52,478 in 2024/25. This was funded from the Asset Replacement/Enhancement reserve.
PR-4360 Ridgewood, Ridgewood Park, Upgrade to Facilities – An additional $18,540 was required due to higher-than-anticipated cost estimates. This was funded from the Asset Replacement/Enhancement reserve.
PR-4421 Hartman Dr, Wangara, New Pathway from Ocean Reef Rd to Gnangara Rd – Due to advanced construction, an additional $226,095 was required in 2024/25. This was funded from Federal Government grants.
PR-4435 Montrose Ave, Mirrabooka Ave, Koondoola Ave, Marangaroo, Upgrade Intersection – An additional $103,358 was required in 2024/25 as a result of advanced works. This was funded from Federal Government grants.
PR-4570 McCoy Park, Quinns Rocks, Renew BMX Track – dditional earthworks required an additional $30,789 in funding. This was sourced from the Asset Replacement/Enhancement reserve.
PR-4579 Beach Rd, Girrawheen, Road Rehabilitation MRRG from SLK 2.59 to 3.22 (Eastbound Carriageway) – An additional $35,745 was required due to higher-than-expected costs. This was funded from the Asset Replacement/Enhancement reserve.
PR-4582 Recurring Program, Renew Transport Infrastructure Assets – Due to higher-than-anticipated costs, an additional $189,038 was required. This was funded from the Asset Replacement/Enhancement reserve.
PR-4597 Recurring Program, Renew Irrigation Infrastructure And Upgrade Installations – An additional $30,715 was required due to increased costs. This was funded from the Asset Replacement/Enhancement reserve.
PR-4615 Recurring Program, Renew IT Equipment and Software 2024-25 – Additional IT equipment purchases resulted in a funding requirement of $48,460. This was funded from the Asset Replacement/Enhancement reserve.
PR-4623 Aquamotion and Kingsway Indoor Stadium, Renew Fire Indicator Panels – Advanced construction works required an additional $93,910 in 2024/25. This was funded from the Asset Replacement/Enhancement reserve.
Capital Changes – Software as a Service (SaaS)
The Software as a Service (SaaS) projects were budgeted within the capital projects to manage the budgets/projects centrally. However, to comply with the Australian Accounting Standards, SaaS project costs should be recognised as operating expenses. Therefore, the following changes were proposed to the 2024/25 Capital Works budget:
· PR-4068 New Assets Management System – An amount of $233,528 was to be moved to operating expenditure to recognise Software as a Service (SaaS).
· PR-4071 Renew Customer Request Management System – An amount of $100,284 was to be moved to operating expenditure to recognise Software as a Service (SaaS).
· PR-4072 Renew Property and Rating System – An amount of $192,618 was to be moved to operating expenditure to recognise Software as a Service (SaaS).
· PR-4364 Renew City Website – An amount of $33,078 was to be moved to operating expenditure to recognise Software as a Service (SaaS).
· PR-4466 Recurring Program, New Corporate Business Systems 2023/24 – An amount of $160,210 was to be moved to operating expenditure to recognise Software as a Service (SaaS).
· PR-4513 Renew Human Resource System – An amount of $252,631 was to be moved to operating expenditure to recognise Software as a Service (SaaS).
· PR-4613 Recurring Program, New Corporate Business Systems 2024-25 – An amount of $32,382 was to be moved to operating expenditure to recognise Software as a Service (SaaS).
· PR-4616 Recurring Program, Upgrade Corporate Business Systems 2024-25 – An amount of $43,816 was to be moved to operating expenditure to recognise Software as a Service (SaaS).
· PR-4622 Upgrade Oracle Enterprise Performance Management – An amount of $378,933 was to be moved to operating expenditure to recognise Software as a Service (SaaS).
Investment Portfolio (Attachment 3)
In accordance with the Local Government (Financial Management) Regulations 1996 (and per the City’s Investment Policy), the City invests solely in Authorised Deposit taking Institutions (ADI’s):

At the end of June 2025, the City held an investment portfolio (cash & cash equivalents) of $540.3m (Face Value), equating to $522.5m inclusive of accrued interest. The City’s year to date investment portfolio return has exceeded the UBS Australia Bank Bill rate index benchmark by 0.21% pa (4.60% pa vs. 4.39% pa).
Consultation
This document has been prepared in consultation with relevant Officers.
Comment
This report has incorporated recent amendments to the Local Government (Financial Management) Regulations 1996, which require local governments to prepare monthly Statement of Financial Activity with variance analysis, and the Statement of Comprehensive Income by Nature is no longer required.
The Regulations also require the preparation of Net Current Asset Notes (Attachment 1) to complement the Statement of Financial Activity.
In reference to Statement of Financial Activity in the report, the following key is used to identify variances:
· é = Favourable Variance greater than 10% and $100,000
· è = Favourable or Unfavourable Variance less than 10% and $100,000
· ê = Unfavourable Variance greater than 10% and $100,000
Statutory Compliance
This Monthly Financial Activity Statement complies with Regulations 34 and 35 of the Local Government (Financial Management) Regulations 1996.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-017 Financial Management |
Medium |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
The above risk relating to the issue contained within this report has been identified and considered within the City’s Corporate risk register. Action plans have been developed to manage this risk to support existing management systems.
Local Jobs
The City is prepared to accept a high level of financial risk provided that the City implements a risk management strategy to manage any risk exposure.
Strategic Growth
The City will accept a moderate level of financial risk for facilitating industry development and growth.
Any strategic objective including ongoing planning, funding and capital investment to develop infrastructure strategic assets carries financial risks.
Policy Implications
The following policies are relevant for this report:
· Accounting Policy;
· Investment Policy;
· Financial Cash Back Reserve Policy; and
· Strategic Budget Policy.
Financial Implications
As outlined in the report and detailed in Attachments 1 to 5.
Voting Requirements
Absolute Majority
|
Moved Cr Berry, Seconded Cr Figg That Council:- 1. RECEIVES the Financial Activity Statement and commentaries on variances to Budget for the period ended 30 June 2025 consisting of: a) June 2025 Financial Activity Statement; b) June 2025 Net Current Assets Position; and c) June 2025 Material Financial Variance Notes. 2. APPROVES by ABSOLUTE MAJORITY the following changes to the 2024/25 Capital Works Budget:
Carried UNANIMOUSLY 14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Attachments:
|
1⇩. |
Attachment 1 - Net Current Assets June 2025 |
25/280669 |
|
|
2⇩. |
Attachment 2 - Statement of Financial Position June 2025 |
25/280670 |
|
|
3⇩. |
Attachment 3 - Investment Report June 2025 |
25/280672 |
|
|
4⇩. |
Attachment 4 - Top Projects June 2025 |
25/280685 |
|
|
5⇩. |
Attachment 5 - Reserve Balances June 2025 |
25/280673 |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Corporate Planning Performance & Improvement
File Ref: 51398 – 25/183617
Responsible Officer: Acting Director Corporate Strategy & Performance
Attachments: 1
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
For Council Members to approve and formally adopt the new Council Plan 2025-35 to guide the City’s strategic direction for the next ten years.
Background
A major review of the City’s ‘plan for the future’ has been undertaken in 2024/25 as per the legislative requirements of the Local Government Act 1995, s5.56 and Local Government (Administration) Regulations 1996; Regulation 19C, 19D.
Following an extensive review of the City’s strategic direction, a consolidated Council Plan has been developed to incorporate the key legislative requirements of a Strategic Community Plan (SCP) and Corporate Business Plan (CBP) and pre-empts upcoming changes to the Local Government Act 1995 and Local Government (Administration) Regulations 1996.
The Council Plan forms part of the City’s Integrated Planning and Reporting Framework (see Figure 1) and is required by legislation to have a major review every four years.
Figure 1 – The City of Wanneroo Integrated Planning and Reporting Framework

Detail
After an extensive review of the Strategic Community Plan (SCP) 2021-2031, a new strategic direction has been developed for the City, based on consultation and feedback from key stakeholders of the City.
Council Plan 2025-2035 - Overview
The Council Plan 2025-2035 has new vision and purpose statements that were developed after input from key stakeholders across the City. The revised statements are:
|
VISION |
“Together we grow – safe, green and connected” |
|
PURPOSE |
“We work together to create strong, vibrant, safe and connected neighbourhoods that improve daily life and protect our environment for future generations” |
In addition to the vision and purpose statements, five new strategic goals and 15 strategic priorities have been developed. The new goals and priorities were formulated after lengthy consideration of:
§ The community engagement results for the review (Community vision, aspirations, priorities and challenges),
§ Strategic opportunities and threats (including risks, PESTEL analysis and global megatrends),
§ The current Local Government industry (legislation, policy),
§ Current organisational direction (adopted strategies and plans); and
§ Resourcing capabilities (financial, workforce, assets).
The five strategic goals and 15 strategic priorities are as follows:
|
GOAL 1 |
A SAFE CITY |
|
Priorities |
1.1 – Work together for a safer Wanneroo 1.2 – Make our streets feel safe and welcoming 1.3 – Build safer paths and better ways to get around |
|
GOAL 2 |
A SUSTAINABLE CITY |
|
Priorities |
2.1 – Cool our places with more trees and greenery 2.2 – Power our future with clean energy 2.3 – Turn waste into community value |
|
GOAL 3 |
A THRIVING ECONOMY |
|
Priorities |
3.1 – Grow local jobs through thriving businesses and diverse industries 3.2 – Unlock land to power tomorrow’s economy 3.3 – Attract investment to fuel local growth |
|
GOAL 4 |
A CONNECTED AND LIVEABLE CITY |
|
Priorities |
4.1 – Create welcoming community spaces 4.2 – Build resilient places for people and nature 4.3 – Bring village life to your local centre |
|
GOAL 5 |
A WELL-GOVERNED AND MANAGED CITY |
|
Priorities |
5.1 – Lead with clear decisions and strong advocacy 5.2 – Invest in property and places that grow our economy and community 5.3 – Use digital technology to make life easier |
Further detailed narrative for the vision statement, purpose statement, strategic goals and priorities can be found in Attachment 1.
The new strategic direction has been consolidated with the four-year detailed operational Corporate Business Plan 2025/26 that was adopted by Council on 22 July 2025, in order to create the new Council Plan 2025-2035.
Consultation
Phase 1 - Stakeholder Engagement – Wanneroo Liveability Survey
The development of the Council Plan 2025-2035 was informed by the results of the highly successful Wanneroo Liveability Survey (WLS), a major component of the engagement activity, with 4,055 survey responses completed and 6,218 community ideas generated from 4,357 residents.
Three priority areas were identified and developed from the attributes rated ‘prioritise’ or ‘manage’ in the WLS results, these were:
§ Priority 1 - Neighbourhood and Personal Safety
§ Priority 2 - Public Spaces, Environment and Recreation
§ Priority 3 - Local Businesses and Amenities
These priority areas were used to inform Phase 2 of the stakeholder engagement process.
Phase 2 - Stakeholder Engagement – Workshops
The second phase of stakeholder engagement was delivered by the City and appointed consultants. This phase of engagement consisted of 16 workshops including sessions with community, Council members, employees, external stakeholders and key working groups.
Council Consideration
Following the community engagement exercise, the overall findings were considered by Council Members at the Concept Forums held on 29 April and 20 May 2025.
On 24 June 2025, Council Members endorsed the draft ‘Council Plan – Vision, Purpose, Goals and Priorities’ to be made available for public comment between Monday 30 June and Monday 21 July 2025.
The results from the public comment period were presented to Council Members at the Concept Forum on 5 August 2025, along with a final draft of the strategic direction for consideration and feedback.
Comment
After the Concept Forum held on 5 August 2025, the following identified changes have been made to the Council Plan 2025-2035 document:
1. Vision Statement
The Vision statement has been updated to “Together we grow – safe, green and connected”, and the supporting narrative amended to reflect this change.
2. Goal 2 – A Sustainable City - Targets
Updated the ‘reduction in waste generation per capita’ target to be in line with the State Government Waste Avoidance and Resource Recovery Strategy 2030. The target is now:
§ By 2030 there will be a reduction in waste generation per capita by 20% (in comparison to 2014/15 levels and in line with the State Government Waste Avoidance and Resource Recovery Strategy 2030).
3. Goal 5 – A Well-Governed and Managed City - Targets
To strengthen alignment with the City’s strategic financial direction, two new targets are proposed for inclusion in the Council Plan. These are:
§ By 2030 we will reduce the proportion of total operating revenue derived from rates (Rates Dependency Ratio) from approximately 60% in 2024/25 to a lower level; and
§ By 2030 we will decrease the residential rates to non-residential rates ratio to 3.4:1 (in comparison to 2022 when the ratio was 3.627:1).
These two targets replace the previously proposed target of ‘growing the proportion of revenue derived from sources other than residential rates by 5% by 2030’. The revised targets provide a clearer link to the City’s revenue diversification strategy and offer a more targeted approach to managing the balance between residential and non-residential contributions to the City’s funding base.
The Council Plan 2025-2035 can be viewed in Attachment 1.
Statutory Compliance
§ Local Government Act 1995, s5.56; and
§ Local Government (Administration) Regulations 1996; Regulation 19C, 19D
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
ST-S20 – Strategic Community Plan |
Low |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
Policy Implications
Nil
Financial Implications
The work to develop the Council Plan 2025-2035 is covered by the City’s operating budget.
Voting Requirements
Absolute Majority
|
Moved Cr Aitken, Seconded Cr Rowe That Council: 1. ADOPTS BY ABSOLUTE MAJORITY the new Council Plan 2025-2035 to guide the City’s strategic direction for the next ten years; 2. As per Regulation 19D of the Local Government (Administration) Regulations 1996, request that the City’s Chief Executive Officer: a) Gives local public notice that the plan has been adopted; and b) Publish the plan on the City’s official website.
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Attachments:
|
1⇩. |
Attachment 1 - Council Plan 2025-2035 - OCM 26082025 |
25/305097 |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Transactional Finance
File Ref: 1859V02 – 25/262962
Responsible Officer: Chief Financial Officer
Attachments: Nil
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
Presentation to the Council of a list of accounts paid for the month of June 2025, including a statement as to the total amounts outstanding at the end of the month.
Background
Local Governments are required each month to prepare a list of accounts paid for that month and submit the list to the next Ordinary Meeting of the Council.
In addition, it must record all other outstanding accounts and include that amount with the list to be presented. The list of accounts paid and the total of outstanding accounts must be recorded in the minutes of the Council meeting.
Detail
The following is the Summary of Accounts paid in June 2025
|
Funds |
Vouchers |
Amount |
|
Director Corporate Services Advance A/C Accounts Paid – June 2025 Cheque Numbers EFT Document Numbers Credit Cards – CBA/NAB TOTAL ACCOUNTS PAID
Less Cancelled Cheques Manual Journals Town Planning Scheme RECOUP FROM MUNICIPAL FUND |
125118 – 125137 43748 - 44799 87 - 88 |
$61,136.14 $30,648,213.01 $78,508.80 $30,787,857.95
($7,525.22) ($11,236.80) ($5,800.00) ($30,763,295.93) |
|
Municipal Fund – Bank A/C Accounts Paid – June 2025
Recoup to Director Corporate Services Advance A/C Bank Fees Payroll – Direct Debits TOTAL ACCOUNTS PAID |
|
$30,763,295.93 $22,957.31 $4,928,309.46 $35,714,562.70 |
|
Town Planning Scheme Accounts Paid – June 2025 Cell 4 TOTAL ACCOUNTS PAID |
|
$5,800.00 $5,800.00 |
(Please note in some instances descriptions/details of one transaction are presented across two pages in following table.)
|
Warrant of Payments June 2025 |
|||
|
|
|
|
|
|
Number |
Date |
Supplier / Description |
Amount |
|
125118 |
3/06/2025 |
Allan Hedrick |
$37.40 |
|
|
|
Partial Refund - Copies Of Plans - Not All Available |
|
|
125119 |
3/06/2025 |
Gojko Ergic |
$171.65 |
|
|
|
Refund - Building Application - Returned |
|
|
125120 |
3/06/2025 |
Zac Hart |
$61.65 |
|
|
|
Refund - Building Application - Rejected |
|
|
125121 |
3/06/2025 |
Andrew Quinn |
$71.90 |
|
|
|
Refund - Copies Of Plans - Not Available |
|
|
125122 |
3/06/2025 |
Pitak Chaithong |
$71.90 |
|
|
|
Refund - Copies Of Plans - Not Available |
|
|
125123 |
3/06/2025 |
Chiara Georgianis |
$171.65 |
|
|
|
Refund - Building Application - Cancelled |
|
|
125124 |
9/06/2025 |
Rates Refund |
$38,114.71 |
|
125125 |
9/06/2025 |
Access Training Academy Pty Ltd |
$1,050.01 |
|
|
|
MUP Workshop 2025 - Childhood And Youth Services |
|
|
125126 |
9/06/2025 |
NexSys I.T. Pty Ltd |
$814.00 |
|
|
|
Subscription - Environment For Revit 12 Months |
|
|
125127 |
16/06/2025 |
Rates Refund |
$15,979.15 |
|
125128 |
23/06/2025 |
Rates Refund |
$604.00 |
|
125129 |
23/06/2025 |
Rates Refund |
$469.13 |
|
125130 |
23/06/2025 |
Rates Refund |
$137.85 |
|
125131 |
23/06/2025 |
Rates Refund |
$133.30 |
|
125132 |
23/06/2025 |
Rates Refund |
$351.28 |
|
125133 |
23/06/2025 |
Rates Refund |
$737.19 |
|
125134 |
23/06/2025 |
Rates Refund |
$456.36 |
|
125135 |
23/06/2025 |
Rates Refund |
$821.28 |
|
125136 |
23/06/2025 |
Rates Refund |
$815.83 |
|
125137 |
23/06/2025 |
Marcel Susak |
$65.90 |
|
|
|
Refund - Copies Of Plans - Not Available |
|
|
|
|
|
|
|
|
|
Total Cheque Payments |
$61,136.14 |
|
|
|
|
|
|
Electronic Funds Transfer |
|||
|
43748 |
3/06/2025 |
(A) Pod Pty Ltd |
$66,758.01 |
|
|
|
Architectural Design - Alkimos Aquatic & Recreation Centre - Assets |
|
|
43749 |
3/06/2025 |
101 Residential Pty Ltd |
$14,262.88 |
|
|
|
Refund - Street & Verge Bond |
|
|
43750 |
3/06/2025 |
AAAC Towing |
$2,035.00 |
|
|
|
Towing Of Abandoned Vehicles |
|
|
43751 |
3/06/2025 |
ABN Residential WA Pty Ltd |
$14,585.84 |
|
|
|
Refund - Street & Verge Bond |
|
|
|
|
Refund - Building Application - Cancelled |
|
|
43752 |
3/06/2025 |
Action Glass & Aluminum |
$18,499.81 |
|
|
|
Glazing Services - Clarkson Library |
|
|
43753 |
3/06/2025 |
Active Discovery |
$53,790.00 |
|
|
|
Install Playground Equipment & Softfall - Banksia Grove Community Centre |
|
|
43754 |
3/06/2025 |
Adapt Nutrition Australia |
$200.00 |
|
|
|
Workshop - Adapt Nutrition - Aquamotion |
|
|
43755 |
3/06/2025 |
AE Hoskins Building Services |
$144,287.26 |
|
|
|
Installation Of Boardwalk - Progress Claim 1 - Assets |
|
|
43756 |
3/06/2025 |
AFGRI Equipment Australia Pty Ltd |
$121.17 |
|
|
|
Vehicle Spare Parts |
|
|
43757 |
3/06/2025 |
AHA! Consulting |
$8,144.40 |
|
|
|
Youth Engagement Project - Banksia Grove |
|
|
43758 |
3/06/2025 |
Al Mustafa Community Association Inc |
$850.00 |
|
|
|
Bond Refund |
|
|
43759 |
3/06/2025 |
Alinta Gas |
$139.45 |
|
|
|
Gas Supply Charges - Various Locations |
|
|
43760 |
3/06/2025 |
Alkimos Surf Life Saving Club Inc. |
$15,450.00 |
|
|
|
Beach Safety Services - Facilities |
|
|
43761 |
3/06/2025 |
Anastasia Barneveld |
$42.50 |
|
|
|
Dog Registration Refund – Already Registered For Lifetime |
|
|
43762 |
3/06/2025 |
Annette Bourke |
$2,000.00 |
|
|
|
Refunds - Street & Verge Bond |
|
|
43763 |
3/06/2025 |
Arie Schaap |
$66.50 |
|
|
|
Refund - Bin Ordered In Error - Waste |
|
|
43764 |
3/06/2025 |
Artoble Pty Ltd |
$400.00 |
|
|
|
Advertising In Artoble - Wanneroo Regional Gallery Exhibitions |
|
|
43765 |
3/06/2025 |
Atom Supply |
$2,622.40 |
|
|
|
Gloves Mechanics Heavy Duty Black - Stores |
|
|
43766 |
3/06/2025 |
Audi Centre Perth |
$3,265.15 |
|
|
|
Vehicle Services - Fleet |
|
|
43767 |
3/06/2025 |
Australian Airconditioning Services Pty Ltd |
$5,122.47 |
|
|
|
Airconditioning Maintenance Services - Various Locations |
|
|
43768 |
3/06/2025 |
Australian Institute of Management - Western Australia Human Resource Development Centre Limited |
$2,954.00 |
|
|
|
Training - Excel Fundamentals Course - 1 Attendee |
|
|
|
|
Training - Assertive Communication - 1 Attendee |
|
|
|
|
Training - Conflict Resolution - 1 Attendee |
|
|
43769 |
3/06/2025 |
Australian Taxation Office |
$771,467.00 |
|
|
|
Payroll Deductions |
|
|
43770 |
3/06/2025 |
Barrier Reef Pools Northside |
$219.45 |
|
|
|
Refund - Building Application - Cancelled |
|
|
43771 |
3/06/2025 |
Bayswater Paddlesports Club |
$470.00 |
|
|
|
Participation Funding - 1 Member - Asia Pacific Cup - Komatsu, Japan 08 - 11.05.2025 |
|
|
43772 |
3/06/2025 |
Bee Advice |
$200.00 |
|
|
|
Treat Beehive In Fallen Log - Drimmie Park |
|
|
43773 |
3/06/2025 |
Benara Nurseries, Quito Pty Ltd |
$17,494.43 |
|
|
|
Supply Plants - Parks |
|
|
43774 |
3/06/2025 |
Bing Technologies Pty Ltd |
$7,877.19 |
|
|
|
Postage Charges For The City |
|
|
43775 |
3/06/2025 |
Bladon WA Pty Ltd |
$304.24 |
|
|
|
Staff Uniforms - Council & Corporate Support |
|
|
43776 |
3/06/2025 |
BoatCo Australia |
$4,950.00 |
|
|
|
Transportation - Aluminium Lifeboat With Steel Fabricated Boat Cradle On Castors |
|
|
43777 |
3/06/2025 |
Boral Construction Materials Group Ltd |
$1,698.40 |
|
|
|
Concrete Mix - Various Locations |
|
|
43778 |
3/06/2025 |
Bridgestone Australia Limited |
$2,377.04 |
|
|
|
Tyre Fitting Services |
|
|
43779 |
3/06/2025 |
Bridgestone Australia Limited |
$7,849.88 |
|
|
|
Tyre Fitting Services |
|
|
43780 |
3/06/2025 |
Brooke Thompson-Lucas |
$77.50 |
|
|
|
Refund - Copies Of Plans - Not Available |
|
|
43781 |
3/06/2025 |
Brownes Foods Operations Pty Limited |
$353.85 |
|
|
|
Milk Supplies - Various Locations |
|
|
43782 |
3/06/2025 |
BWY Engineering Consultants Pty Ltd |
$6,545.00 |
|
|
|
Glass Awning Structural Investigation And Assessment - Clarkson Library |
|
|
43783 |
3/06/2025 |
Cancelled |
|
|
43784 |
3/06/2025 |
Cancelled |
|
|
43785 |
3/06/2025 |
Canning & Associates Cost Consulting Pty Ltd |
$2,051.50 |
|
|
|
Provision Of Cost Consultancy Services - Dordaak Kepup Project |
|
|
43786 |
3/06/2025 |
Car Care (WA) Mindarie |
$460.95 |
|
|
|
Cleaning - Community Buses |
|
|
43787 |
3/06/2025 |
Car Care Motor Company Pty Ltd |
$4,295.51 |
|
|
|
Vehicle Services / Repairs |
|
|
43788 |
3/06/2025 |
Catherine Cronin |
$1,200.00 |
|
|
|
Women's Wellbeing & Art For Self-Care - Library Services |
|
|
43789 |
3/06/2025 |
CFMEU |
$110.00 |
|
|
|
Payroll Deductions |
|
|
43790 |
3/06/2025 |
Chillo Refrigeration & Air-Conditioning |
$1,705.00 |
|
|
|
Install New Door Latches To Walk-In Fridges - New Civic Centre |
|
|
|
|
Repairs To Ice Machine - Ashby Operations Centre Shed A2 |
|
|
43791 |
3/06/2025 |
Christian Anthony Hanna t/a New Signs |
$280.00 |
|
|
|
10 Yellow A-Frame - Do Not Enter Signs |
|
|
43792 |
3/06/2025 |
City of Wanneroo |
$472.00 |
|
|
|
Payroll Deductions |
|
|
43793 |
3/06/2025 |
CK Maloney Surveying Pty Ltd |
$31,924.20 |
|
|
|
Feature And Contour Survey St Andrews Drive - Yanchep Beach Road - Yanchep Golf Club |
|
|
43794 |
3/06/2025 |
Cleanaway Equipment Services Pty Ltd |
$529.10 |
|
|
|
Parts Washer Rental - Fleet |
|
|
43795 |
3/06/2025 |
Coca Cola Amatil Pty Ltd |
$414.53 |
|
|
|
Beverages - Kingsway |
|
|
43796 |
3/06/2025 |
Complete Office Supplies Pty Ltd |
$867.89 |
|
|
|
Stationery Supplies For The City |
|
|
43797 |
3/06/2025 |
Contra-Flow Pty Ltd |
$842.31 |
|
|
|
Fix Asphalt Strip - Lagoon Drive |
|
|
43798 |
3/06/2025 |
Cornell Building and Construction |
$147.00 |
|
|
|
Refund - Development Application - Withdrawn |
|
|
43799 |
3/06/2025 |
Corsign (WA) Pty Ltd |
$1,704.43 |
|
|
|
Signs - Bicycle Symbol, Bicycle Route & Street Name Tag |
|
|
|
|
Install Sign - Bus Zone - Salerno Drive - Assets |
|
|
|
|
Street Name Plates |
|
|
43800 |
3/06/2025 |
Craneswest (WA) Pty Ltd |
$1,183.55 |
|
|
|
Green Waste Disposal - Wesco Rd Facility. |
|
|
43801 |
3/06/2025 |
Critical Fire Protection & Training Pty Ltd |
$2,154.69 |
|
|
|
Fire Protection / Detection Equipment Maintenance - Various Locations |
|
|
43802 |
3/06/2025 |
Cromag Pty Ltd T/a Sigma Telford Group |
$1,775.95 |
|
|
|
Pool Chemicals - Aquamotion |
|
|
43803 |
3/06/2025 |
Crown Lift Trucks |
$539.24 |
|
|
|
3 Month Service - Parts And Labour |
|
|
43804 |
3/06/2025 |
CW Brands Pty Ltd |
$271.70 |
|
|
|
Duct Tape / Cloth Tape - Stores |
|
|
43805 |
3/06/2025 |
Dale Alcock Homes Pty Ltd |
$12,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43806 |
3/06/2025 |
Data #3 Limited |
$1,536.19 |
|
|
|
Software Licences - ICT |
|
|
43807 |
3/06/2025 |
David Roy Cull |
$1,670.00 |
|
|
|
Pest Control Services - Various Locations |
|
|
43808 |
3/06/2025 |
Delstrat Pty Ltd t/a Devplex |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43809 |
3/06/2025 |
Densford Civil Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43810 |
3/06/2025 |
Department of Local Government Sport & Cultural Industries |
$1,560.00 |
|
|
|
Kidsport Refund - 4 Participants |
|
|
43811 |
3/06/2025 |
Department of the Premier and Cabinet |
$5,159.55 |
|
|
|
Advertising Services - Various |
|
|
43812 |
3/06/2025 |
Department of Transport |
$1,765.40 |
|
|
|
Disclosure Of Information Fees - Vehicle Ownership Search |
|
|
43813 |
3/06/2025 |
DFS Industrial & Environmental Services Pty Ltd |
$9,332.22 |
|
|
|
Road Sweeping / Drain Cleaning Services - Various Locations |
|
|
43814 |
3/06/2025 |
Double G (WA) Pty Ltd |
$605.00 |
|
|
|
After Hours Call Out - Irrigation Issue - Leatherback Park |
|
|
43815 |
3/06/2025 |
Dowsing Group Pty Ltd |
$1,320.00 |
|
|
|
Concrete Works - Hester Avenue / Connolly Drive |
|
|
43816 |
3/06/2025 |
Du Clene Pty Ltd |
$2,023.84 |
|
|
|
Cleaning Consumables For The City |
|
|
43817 |
3/06/2025 |
Duncraig Seniors Social Badminton Club |
$64.00 |
|
|
|
Refund - Bulk Booking Courts - Kingsway |
|
|
43818 |
3/06/2025 |
EBSCO International Incorporated |
$10,641.85 |
|
|
|
Subscription - Myheritage Library Edition |
|
|
43819 |
3/06/2025 |
Elan Energy Matrix Pty Ltd |
$389.50 |
|
|
|
Tyre Pick Up - Waste |
|
|
43820 |
3/06/2025 |
Environmental Industries Pty Ltd |
$31,072.71 |
|
|
|
Landscape Maintenance Services - Various Locations |
|
|
43821 |
3/06/2025 |
Epic Catering & Events Services Pty Ltd |
$3,448.50 |
|
|
|
Catering - Council Meetings - Dinner |
|
|
43822 |
3/06/2025 |
Ergolink |
$1,206.61 |
|
|
|
2 Standard Desk Risers - Cultural Services |
|
|
|
|
2 Office Chairs - Infrastructure Maintenance & ICT |
|
|
43823 |
3/06/2025 |
Evolve Talent Pty Ltd |
$17,078.05 |
|
|
|
Casual Labour Services |
|
|
43824 |
3/06/2025 |
Fleet Commercial Gymnasiums Pty Ltd |
$17,216.88 |
|
|
|
Rental And Maintenance Of Fitness Equipment - Aquamotion |
|
|
43825 |
3/06/2025 |
Fleet Network |
$14,958.08 |
|
|
|
Input Tax Credits For Salary Packaging |
|
|
|
|
Payroll Deductions |
|
|
43826 |
3/06/2025 |
Forch Australia Pty Ltd |
$330.00 |
|
|
|
Disposable Gloves - Stores |
|
|
43827 |
3/06/2025 |
Fraser Studios |
$1,375.00 |
|
|
|
Business Wanneroo Website Redesign |
|
|
43828 |
3/06/2025 |
FUJIFILM Business Innovation Australia Pty Ltd |
$2,209.90 |
|
|
|
Ezescan Charges - Print Room |
|
|
43829 |
3/06/2025 |
Fusion Applications Pty Ltd |
$178.75 |
|
|
|
Consulting Fees For OICS Architecture Integration |
|
|
43830 |
3/06/2025 |
Future First Homes Perth Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43831 |
3/06/2025 |
Gemini Building and Construction Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43832 |
3/06/2025 |
Gemmill Homes Pty Ltd |
$1,043.78 |
|
|
|
Refund - CTF Levy Fee - Duplicate Payment |
|
|
43833 |
3/06/2025 |
Geoff's Tree Service Pty Ltd |
$116,093.88 |
|
|
|
Pruning Services For The City |
|
|
43834 |
3/06/2025 |
Global Marine Enclosures Pty Ltd |
$4,840.00 |
|
|
|
Summer Maintenance - April 2025 |
|
|
43835 |
3/06/2025 |
GPC Asia Pacific Pty Ltd |
$524.07 |
|
|
|
Vehicle Spare Parts |
|
|
43836 |
3/06/2025 |
Green Workz Pty Ltd |
$4,015.00 |
|
|
|
Championship Range Sportsman Turf |
|
|
43837 |
3/06/2025 |
Greenway Turf Solutions Pty Ltd |
$4,235.00 |
|
|
|
Supply And Delivery Of Dura Stadia Seed |
|
|
43838 |
3/06/2025 |
Groeneveld Lubrication Solutions Pty Ltd |
$1,866.34 |
|
|
|
Vehicle Spare Parts |
|
|
43839 |
3/06/2025 |
Hanh Longmuir & Thi Longmuir |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43840 |
3/06/2025 |
Headset ERA |
$1,006.50 |
|
|
|
2 Jabra Engage Binaural Stereo Headset - Facilities |
|
|
43841 |
3/06/2025 |
Hey Sugar XO c/o Alessia Mitanoski |
$222.00 |
|
|
|
Refund - Development Application - Not Required |
|
|
43842 |
3/06/2025 |
Hickey Constructions Pty Ltd |
$16,655.10 |
|
|
|
Additional Labour & Material - Swipe Card System For Storeroom - Heath Park Pavilion |
|
|
|
|
Replace Broken Capon Limestone Wall - Crevilli |
|
|
|
|
Replace And Fix Pavers - Christian Park |
|
|
43843 |
3/06/2025 |
Hitachi Construction Machinery Pty Ltd |
$980.54 |
|
|
|
Vehicle Spare Parts |
|
|
43844 |
3/06/2025 |
Holty's Hiab |
$528.00 |
|
|
|
Goal Rotations - Riverlinks / Kingsway - Parks |
|
|
43845 |
3/06/2025 |
Home Group WA Pty Ltd |
$22,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
43846 |
3/06/2025 |
Hose Right |
$2,319.71 |
|
|
|
Vehicle Spare Parts |
|
|
43847 |
3/06/2025 |
Hug Group (WA) Pty Ltd |
$4,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
43848 |
3/06/2025 |
Humes Concrete Products |
$858.00 |
|
|
|
Drainage Item - One Part Side Entry System - Engineering |
|
|
43849 |
3/06/2025 |
Imagesource Digital Solutions |
$347.60 |
|
|
|
Museum Bookmarks - Cultural Services |
|
|
43850 |
3/06/2025 |
Incite Energy |
$43,725.00 |
|
|
|
Options Assessment To Become A Renewable Energy Supplier |
|
|
43851 |
3/06/2025 |
Integrity Industrial Pty Ltd |
$29,663.98 |
|
|
|
Casual Labour Services |
|
|
43852 |
3/06/2025 |
Integrity Industrial Pty Ltd |
$6,120.94 |
|
|
|
Casual Labour Services |
|
|
43853 |
3/06/2025 |
Integrity Staffing |
$12,344.52 |
|
|
|
Casual Labour Services |
|
|
43854 |
3/06/2025 |
Intelife Group |
$44,289.36 |
|
|
|
Sand Sifting / Sand / Mulch Top-Ups - Various Locations |
|
|
43855 |
3/06/2025 |
Intelife Group |
$5,351.93 |
|
|
|
Sand Sifting & Top-Up - Overland Park |
|
|
43856 |
3/06/2025 |
Interfire Agencies Pty Ltd |
$825.00 |
|
|
|
Sticker / Reflective Helmet Arch - Fire Services |
|
|
43857 |
3/06/2025 |
Iron Mountain Australia Group Pty Ltd |
$5,455.93 |
|
|
|
Document Management Services - IM |
|
|
43858 |
3/06/2025 |
Irrigation Australia |
$1,370.00 |
|
|
|
Training - Irrigation Efficiency - 1 Attendee - 11 - 13.03.2025 |
|
|
43859 |
3/06/2025 |
J Blackwood & Son Ltd |
$1,566.93 |
|
|
|
4 Face Shields / Gloves / Truck Wash- Stores |
|
|
43860 |
3/06/2025 |
Jackson McDonald |
$24,169.75 |
|
|
|
Legal Fees For The City |
|
|
43861 |
3/06/2025 |
Jacques Design Studio Pty Ltd |
$171.65 |
|
|
|
Refund - Building Application - Incorrect |
|
|
43862 |
3/06/2025 |
James Bennett Pty Ltd |
$1,509.98 |
|
|
|
Book Purchases - Library Services |
|
|
43863 |
3/06/2025 |
Japanese Truck & Bus Spares Pty Ltd |
$306.90 |
|
|
|
Vehicle Spare Parts |
|
|
43864 |
3/06/2025 |
Jason Herlihy |
$61.65 |
|
|
|
Refund - Building Application - Cancelled |
|
|
43865 |
3/06/2025 |
Jobfit Health Group Pty Ltd |
$1,335.40 |
|
|
|
Pre-Employment Medical Assessments |
|
|
43866 |
3/06/2025 |
Johannes Mans |
$985.70 |
|
|
|
Vehicle Crossing Subsidy |
|
|
43867 |
3/06/2025 |
K2 Audiovisual Pty Ltd |
$1,073.60 |
|
|
|
Booking Panel Installations - Tuart & Malleefowl Meeting Rooms |
|
|
43868 |
3/06/2025 |
Karen Mau |
$500.00 |
|
|
|
CCTV Rebate |
|
|
43869 |
3/06/2025 |
Karen Vivarelli Pty Ltd |
$440.00 |
|
|
|
Workshop Presentation - Grow Your Group With Facebook - Technology |
|
|
43870 |
3/06/2025 |
Kim Durling |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43871 |
3/06/2025 |
Kleenit |
$1,931.10 |
|
|
|
Graffiti Removal - Various Locations |
|
|
|
|
Remove Posters - Wanneroo Youth Centre |
|
|
43872 |
3/06/2025 |
Kleenit |
$310.20 |
|
|
|
Clean Bird Waste Of Drinking Fountain - Tobermory Park |
|
|
43873 |
3/06/2025 |
Komatsu Australia Pty Ltd |
$663.77 |
|
|
|
Vehicle Spare Parts |
|
|
43874 |
3/06/2025 |
Konica Minolta Business Solutions Australia Pty Ltd |
$1,169.37 |
|
|
|
Image Charge And Maintenance - Print Room |
|
|
43875 |
3/06/2025 |
KTR Creations Pty Ltd |
$73.00 |
|
|
|
Refund - Development Application - Incorrect |
|
|
43876 |
3/06/2025 |
Landcare Weed Control |
$16,686.82 |
|
|
|
Landscape Maintenance Services - Various Locations |
|
|
43877 |
3/06/2025 |
Lawn Doctor Turf Solutions |
$2,053.70 |
|
|
|
Turfing Works - Various Locations |
|
|
43878 |
3/06/2025 |
Lexie Orapa |
$252.00 |
|
|
|
Refund - Bulk Booking Cancellation |
|
|
43879 |
3/06/2025 |
LGISWA |
$1,000.00 |
|
|
|
Fleet Protection Motor Vehicle Claim Excess Payment |
|
|
43880 |
3/06/2025 |
Linemarking WA Pty Ltd |
$1,581.65 |
|
|
|
Pavement Marking & Associated Works - Salerno Drive |
|
|
43881 |
3/06/2025 |
LKS Constructions (WA) Pty Ltd |
$8,370.78 |
|
|
|
Upgrade - Montrose Tennis Club |
|
|
43882 |
3/06/2025 |
Local Government Professionals Australia WA Inc |
$3,350.00 |
|
|
|
Executive Leadership Program - Sept 2025 - 1 Attendee |
|
|
43883 |
3/06/2025 |
Louis Florent De Robillard t/a Scrub Automotive |
$480.00 |
|
|
|
Trailer Services - Fleet |
|
|
43884 |
3/06/2025 |
Lumify Group (formerly DDLS) |
$3,135.00 |
|
|
|
Agile Business Analysis (Agileba®) Foundation And Agile Business Analysis (Agileba®) Practitioner |
|
|
43885 |
3/06/2025 |
Luxury Living WA Pty Ltd t/a Status Residential |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43886 |
3/06/2025 |
M Gregory Legal |
$18,490.30 |
|
|
|
Legal Fees For The City |
|
|
43887 |
3/06/2025 |
Mackay Urban Design |
$440.00 |
|
|
|
Attendance - Design Review Panel |
|
|
43888 |
3/06/2025 |
Marcey Smallman |
$441.11 |
|
|
|
Refund - Development Application - Withdrawn |
|
|
43889 |
3/06/2025 |
Materon Investments WA Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43890 |
3/06/2025 |
Maurilio De Oliveira |
$110.00 |
|
|
|
Refund - Building Application - Returned |
|
|
43891 |
3/06/2025 |
Maxxia Pty Ltd |
$10,304.88 |
|
|
|
Input Tax Credits For Salary Packaging - March 2025 |
|
|
|
|
Payroll Deductions |
|
|
43892 |
3/06/2025 |
McLeods Lawyers Pty Ltd |
$862.95 |
|
|
|
Legal Fees For The City |
|
|
43893 |
3/06/2025 |
Michael Page International (Australia)Pty Ltd |
$4,648.33 |
|
|
|
Casual Labour Services |
|
|
43894 |
3/06/2025 |
Mindarie Regional Council |
$297,755.46 |
|
|
|
Refuse Disposal Charges - Various |
|
|
43895 |
3/06/2025 |
Montebello Catering |
$506.00 |
|
|
|
Catering - Council Meeting 15.04.2025 |
|
|
43896 |
3/06/2025 |
My Homes WA |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43897 |
3/06/2025 |
Nastech (WA) Pty Ltd |
$3,806.00 |
|
|
|
Amalgamation Of 1 Green Title Lot With 1 Crown Lot - Koomool Drive |
|
|
|
|
Property Acquisition Investigation Survey |
|
|
43898 |
3/06/2025 |
Natural Area Consulting Management Services |
$35,651.00 |
|
|
|
Provision of City Guidelines - Feral Animal Management, Acid Sulphite Soils and Weed Management |
|
|
43899 |
3/06/2025 |
Nature Play WA |
$1,210.00 |
|
|
|
Hosting Fee - Cockman House Trail / Shipwreck Drive Trail / Yanchep National Park Play Trail |
|
|
43900 |
3/06/2025 |
Nhut Truong Doan & Thi Huong Hue Vo |
$44.32 |
|
|
|
Refund - Bulk Junk - Missed Collection 2023 / 2024 |
|
|
43901 |
3/06/2025 |
Office Line |
$5,429.60 |
|
|
|
7 Banquet Round Tables - Community Facilities Operations |
|
|
43902 |
3/06/2025 |
On Road Auto Electrics |
$1,662.45 |
|
|
|
Vehicle Repairs - Fleet |
|
|
43903 |
3/06/2025 |
On Tap Services |
$9,689.14 |
|
|
|
Plumbing Maintenance Works - Various Locations |
|
|
43904 |
3/06/2025 |
Paperbark Technologies Pty Ltd |
$367.75 |
|
|
|
Tree Risk Assessment Report - 1 Eucalyptus |
|
|
43905 |
3/06/2025 |
Parker Black & Forrest |
$396.44 |
|
|
|
Supply / Fit A Lever Action Entrance Set Key Operable From The Outside - Grandis Park |
|
|
43906 |
3/06/2025 |
Party On The Green Pty Ltd |
$1,210.00 |
|
|
|
Standard 9 Hole Mini Golf Course - Wanneroo Youth Centre |
|
|
43907 |
3/06/2025 |
Paul Bullen |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43908 |
3/06/2025 |
Paywise Pty Ltd |
$6,567.16 |
|
|
|
Input Tax Credits For Salary Packaging - March 2025 |
|
|
|
|
Payroll Deductions |
|
|
43909 |
3/06/2025 |
Perth Heavy Tow |
$1,969.00 |
|
|
|
Towing Services - Fleet |
|
|
43910 |
3/06/2025 |
Perth Surveying Services Pty Ltd |
$5,866.58 |
|
|
|
Surveying - Wanneroo Road |
|
|
43911 |
3/06/2025 |
Peter Hall |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43912 |
3/06/2025 |
Peter's Bus Charters |
$580.00 |
|
|
|
Bus Hire - Wartime Tour Event |
|
|
43913 |
3/06/2025 |
Play Check Pty Ltd |
$1,155.00 |
|
|
|
Comprehensive Playground Audits - Willespie Park / Peridot Park / Hainsworth Skate Park |
|
|
43914 |
3/06/2025 |
Power Vac Pty Ltd |
$433.70 |
|
|
|
S20 Sweeper Diesel - Equipment Service - Workshop |
|
|
43915 |
3/06/2025 |
Powerhouse Batteries Pty Ltd |
$569.38 |
|
|
|
Battery - Delkor - Fleet |
|
|
43916 |
3/06/2025 |
Cancelled |
|
|
43917 |
3/06/2025 |
Print Integrity |
$980.65 |
|
|
|
Merchandise - Engaging Youth In Banksia Grove |
|
|
43918 |
3/06/2025 |
Pront Tow Towing / Wanneroo Towing Service |
$1,303.50 |
|
|
|
Bobcat & Mowers Transportation |
|
|
43919 |
3/06/2025 |
Quality Hydraulic Services Design |
$3,740.00 |
|
|
|
Backflow Audit - Gumblossom Community Centre |
|
|
43920 |
3/06/2025 |
RAC BusinessWise |
$108.00 |
|
|
|
Roadside Assistance - WN 33917 |
|
|
43921 |
3/06/2025 |
RBD Building & Maintenance Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43922 |
3/06/2025 |
Reliable Fencing WA Pty Ltd |
$16,359.49 |
|
|
|
Fencing / Gate / Bollard Works - Various Locations |
|
|
43923 |
3/06/2025 |
Residential Building WA Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43924 |
3/06/2025 |
Rhys Gaskin |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43925 |
3/06/2025 |
RM Surveys |
$15,059.00 |
|
|
|
Digital Ground Survey - Orchid Road - Assets |
|
|
43926 |
3/06/2025 |
Robert Barakat |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43927 |
3/06/2025 |
Robert Walters Pty Ltd |
$5,154.78 |
|
|
|
Casual Labour Services |
|
|
43928 |
3/06/2025 |
Sabrina Beate Hansen |
$2,240.00 |
|
|
|
Graphic Design Services - Various |
|
|
43929 |
3/06/2025 |
Safety World |
$1,165.78 |
|
|
|
PPE Issue - Various Employees |
|
|
43930 |
3/06/2025 |
Sahba Global Pty Ltd |
$18,493.75 |
|
|
|
Ad Hoc Consultancy Services - Wangara CCTV |
|
|
|
|
CCTV Maintenance And Management Specifications |
|
|
43931 |
3/06/2025 |
Seabreeze Landscape Supplies |
$231.00 |
|
|
|
Landscape Supplies |
|
|
43932 |
3/06/2025 |
Shane Spinks Consulting |
$17,866.99 |
|
|
|
Changing Places Investigation - Clarkson Town Centre |
|
|
43933 |
3/06/2025 |
Sharka Hornakova t/a Donut Waste |
$1,300.00 |
|
|
|
Event Pop Up Activation - DIY Body Scrub |
|
|
43934 |
3/06/2025 |
SJ McKee Maintenance Pty Ltd |
$4,687.00 |
|
|
|
Maintenance Works - Various Locations - Waste |
|
|
43935 |
3/06/2025 |
Skills Force Australia (Wangara) |
$2,419.20 |
|
|
|
Training - Fire Extinguisher - Parks |
|
|
43936 |
3/06/2025 |
Slater-Gartrell Sports |
$987.80 |
|
|
|
Replace And Install Damaged Backboard And Supply Metal Net - Verwood Park |
|
|
43937 |
3/06/2025 |
Smartsalary |
$2,111.63 |
|
|
|
Input Tax Credits For Salary Packaging - March 2025 |
|
|
|
|
Payroll Deductions |
|
|
43938 |
3/06/2025 |
SOLO Resource Recovery |
$2,359.50 |
|
|
|
Wet Hire Unit - Waste |
|
|
43939 |
3/06/2025 |
Specialist Wholesalers Pty Ltd t/as Truckline |
$5.40 |
|
|
|
Small Plant Spare Parts |
|
|
43940 |
3/06/2025 |
SSB Pty Ltd |
$4,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
43941 |
3/06/2025 |
St John Ambulance Western Australia Ltd |
$91.41 |
|
|
|
Servicing - First Aid Kits And Defibrillators |
|
|
43942 |
3/06/2025 |
Statewide Cleaning Supplies Pty Ltd |
$106.08 |
|
|
|
Dishwashing Liquid & Sponge Scourers - Stores |
|
|
43943 |
3/06/2025 |
Stewart & Heaton Clothing Company Pty Ltd |
$405.05 |
|
|
|
PPE Issue - Fire Services |
|
|
43944 |
3/06/2025 |
StrataGreen |
$1,787.00 |
|
|
|
10kg Buckets Of Terra Cottom Arbor - Parks |
|
|
|
|
Training - Spray Course - 1 Attendee 08 - 09.05.2025 |
|
|
43945 |
3/06/2025 |
Superior Nominees Pty Ltd |
$8,126.89 |
|
|
|
Playground Equipment Repairs - Various Locations |
|
|
43946 |
3/06/2025 |
Susan Ungerboeck |
$500.00 |
|
|
|
CCTV Rebate |
|
|
43947 |
3/06/2025 |
Synergy |
$84,523.52 |
|
|
|
Power Supply Charges - Various Locations |
|
|
43948 |
3/06/2025 |
T-Quip |
$831.05 |
|
|
|
Small Plant Spare Parts |
|
|
43949 |
3/06/2025 |
Team Global Express Pty Ltd |
$484.50 |
|
|
|
Courier Services |
|
|
43950 |
3/06/2025 |
Tegan O'Loughlin-Eames & Stephen McKellican |
$66.50 |
|
|
|
Refund - Customer Paid Incorrect Council |
|
|
43951 |
3/06/2025 |
Tejaskumar Patel |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43952 |
3/06/2025 |
Telstra Limited |
$4,461.46 |
|
|
|
ADSL Charges - ICT |
|
|
43953 |
3/06/2025 |
The Distributors Perth |
$407.55 |
|
|
|
Confectionery - Kingsway Indoor Stadium |
|
|
43954 |
3/06/2025 |
The Grove Church Inc |
$295.00 |
|
|
|
Refund - Development Application - Change Of Use |
|
|
43955 |
3/06/2025 |
The Hire Guys Wangara |
$1,540.00 |
|
|
|
Equipment Hire - Ride On Trailer |
|
|
43956 |
3/06/2025 |
The Hire Guys Wangara |
$863.00 |
|
|
|
Equipment Hire - Dingo Lighthouse |
|
|
|
|
Equipment Hire - Mitsubishi Triton - Parks |
|
|
43957 |
3/06/2025 |
The Local Government, Racing and Cemeteries Employees Union (WA) |
$1,034.00 |
|
|
|
Payroll Deductions |
|
|
43958 |
3/06/2025 |
The Royal Life Saving Society Australia |
$525.00 |
|
|
|
Workshop - Pool Lifeguard Licence Renewal - 3 Attendees |
|
|
43959 |
3/06/2025 |
The Trustee for Talis Unit Trust T/a Talis Consultants |
$6,050.00 |
|
|
|
Consultancy Service - Ashley Park DSI |
|
|
43960 |
3/06/2025 |
Think Water Wanneroo |
$322.00 |
|
|
|
Hort 1 Harness - Advance X-Tree - Parks |
|
|
43961 |
3/06/2025 |
Thomas Smith |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
43962 |
3/06/2025 |
Thuroona Services Pty Ltd |
$14,356.10 |
|
|
|
Coordinated Waste Cleanup - Mariginiup Bushfire |
|
|
43963 |
3/06/2025 |
Timothy D’Ascenzo |
$61.65 |
|
|
|
Refund - Building Application - Rejected |
|
|
43964 |
3/06/2025 |
Tree Planting & Watering |
$1,870.22 |
|
|
|
Watering - 8 Pine Trees - Lenore Rd |
|
|
43965 |
3/06/2025 |
Triton Electrical Contractors Pty Ltd |
$41,905.79 |
|
|
|
Irrigation Electrical Works - Various Locations |
|
|
43966 |
3/06/2025 |
Trophy Shop Australia |
$13.90 |
|
|
|
Name Badge - Cultural Development |
|
|
43967 |
3/06/2025 |
Truck Centre WA Pty Ltd |
$4,150.15 |
|
|
|
Vehicle Spare Parts |
|
|
43968 |
3/06/2025 |
University of Western Australia |
$15,170.10 |
|
|
|
Wave Buoys - Year 2 Servicing - Data And Reporting |
|
|
43969 |
3/06/2025 |
Veolia Recycling & Recovery Pty Ltd |
$5,341.70 |
|
|
|
General / Paper / Cardboard Collections - Waste |
|
|
43970 |
3/06/2025 |
Vocus Pty Ltd |
$88.00 |
|
|
|
Account Level Charges - ICT |
|
|
43971 |
3/06/2025 |
Wanneroo Electric |
$19,003.99 |
|
|
|
Electrical Maintenance Charges - Various Locations |
|
|
43972 |
3/06/2025 |
Water Corporation |
$11,491.45 |
|
|
|
Water Supply Charges - Various Locations |
|
|
43973 |
3/06/2025 |
West Coast Turf |
$16,189.80 |
|
|
|
Turfing Works - Various Locations |
|
|
43974 |
3/06/2025 |
William Buck Consulting (WA) Pty Ltd |
$2,200.00 |
|
|
|
Probity Adviser - RFQ 24216 The Provision Of Telephony And Contact Centre Upgrade |
|
|
43975 |
3/06/2025 |
Work Clobber |
$245.50 |
|
|
|
PPE - Various Employees |
|
|
43976 |
3/06/2025 |
Work Health Professionals Pty Ltd |
$8,487.60 |
|
|
|
Workplace Noise Survey - People & Culture Administration |
|
|
43977 |
3/06/2025 |
Workpower Incorporated |
$2,098.80 |
|
|
|
Provision Of Planting & Maintenance - Yellagonga |
|
|
|
|
Work Power Urban Greening Grant 2025 - Neerabup Road |
|
|
43978 |
3/06/2025 |
Youth Affairs Council of WA |
$3,080.00 |
|
|
|
School Leadership Program - Remaining Funds To Facilitate Youth Leadership Forum |
|
|
43985 |
3/06/2025 |
Ms C Buck |
$29.00 |
|
|
|
Reimbursement - Parking Expense - Tourism Council WA - Tourism Conference 2025 |
|
|
43986 |
3/06/2025 |
Mr Daniel Bergqvist |
$22.99 |
|
|
|
Reimbursement - Comms Bridge - Mary Lindsay Homestead |
|
|
43987 |
3/06/2025 |
Mr M Dickson |
$17.90 |
|
|
|
Reimbursement - Coffee With Developers |
|
|
43988 |
3/06/2025 |
Mr S Pender |
$125.19 |
|
|
|
Reimbursement - Purchase Of Fuel WR 6 |
|
|
43989 |
3/06/2025 |
Mr S Buckle |
$1,186.82 |
|
|
|
Reimbursement - Study Assistance Claim |
|
|
43990 |
5/06/2025 |
Australian Services Union |
$212.00 |
|
|
|
Payroll Deductions |
|
|
43991 |
5/06/2025 |
Ball & Doggett Pty Ltd |
$401.17 |
|
|
|
Paper Supplies - Print Room |
|
|
43992 |
5/06/2025 |
Bubbles and Brushes |
$505.00 |
|
|
|
Second Payment - Art Workshop - Community Planning & Development |
|
|
43993 |
5/06/2025 |
Child Support Agency |
$1,359.74 |
|
|
|
Payroll Deductions |
|
|
43994 |
5/06/2025 |
Civica Pty Ltd |
$200,822.16 |
|
|
|
Authority Payments (Payable Pro For Rates) SAAS Service - Year 1 |
|
|
|
|
Implementation Of Citizen Central / Online Certificates / Online CRM - ICW |
|
|
43995 |
5/06/2025 |
Long Pty Ltd t/a Perth Commercial Fridges and Equipment |
$2,779.00 |
|
|
|
Double Glass Door Display Fridge - Wanneroo Central Bushfire Brigade |
|
|
43996 |
5/06/2025 |
No Limits Perth Inc |
$3,000.00 |
|
|
|
Professional Development Day - Give Back Activity |
|
|
43997 |
5/06/2025 |
Professional Search Group Pty Ltd |
$1,909.05 |
|
|
|
Recruitment Services - Finance Officer |
|
|
43998 |
5/06/2025 |
Shane Spinks Consulting |
$17,866.99 |
|
|
|
Progress Claim - Clarkson Town Centre Changing Places Investigation |
|
|
43999 |
5/06/2025 |
Stiles Electrical & Communication Services Pty Ltd |
$188,293.44 |
|
|
|
Progress Claim 1 - Floodlighting Upgrade - Heath Park |
|
|
44000 |
5/06/2025 |
Team Global Express Pty Ltd |
$126.97 |
|
|
|
Courier Services For The City |
|
|
44001 |
5/06/2025 |
The Good Guys Discount Warehouses(Australia) Pty Ltd |
$4,498.20 |
|
|
|
9kg Tumble Dryer - Community Safety |
|
|
44005 |
9/06/2025 |
Mr D Middlemass |
$100.00 |
|
|
|
Reimbursement - Purchase Of Gift Cards For E-Scooter Safety Project |
|
|
44006 |
9/06/2025 |
Mrs K Leavesley |
$316.00 |
|
|
|
Reimbursement - CSEM Team Building Day |
|
|
44007 |
9/06/2025 |
Mr O Faruk |
$1,209.60 |
|
|
|
Reimbursement - Study Assistance |
|
|
44008 |
9/06/2025 |
4Park Pty Ltd trading as Forpark Australia |
$324,440.60 |
|
|
|
Install Play Equipment / Softfall - Hainsworth Community Centre |
|
|
|
|
Install Playground Equipment - Richard Aldersea Park |
|
|
|
|
Install Playground Equipment / Shade Sails / Soft Fall - Goolema Park |
|
|
44009 |
9/06/2025 |
A1 Pools |
$1,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44010 |
9/06/2025 |
Rates Refund |
$379.47 |
|
44011 |
9/06/2025 |
ABN Residential WA Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44012 |
9/06/2025 |
Activ Foundation Incorporated |
$10,718.62 |
|
|
|
Horticultural / Turf Maintenance - Various Locations |
|
|
44013 |
9/06/2025 |
Activtec Solutions |
$539.55 |
|
|
|
Completed Maintenance On Medical Equipment - Aquamotion |
|
|
44014 |
9/06/2025 |
Adform Engraving & Signs |
$2,552.00 |
|
|
|
Replacement Building / Vehicle Signage - North Coastal Bush Fire Brigade |
|
|
44015 |
9/06/2025 |
Advanced Perth Removals Pty Ltd |
$594.00 |
|
|
|
Relocation Of Tables & Trolleys From Quinns Mindarie Community Centre To Gumblossom Sports Hall |
|
|
44016 |
9/06/2025 |
Air Liquide Australia |
$232.32 |
|
|
|
Cylinder Rental Fee |
|
|
44017 |
9/06/2025 |
Alhidayah Centre |
$492.50 |
|
|
|
Refund - Booking Cancelled - Kingsway |
|
|
44018 |
9/06/2025 |
Alinta Gas |
$13,785.26 |
|
|
|
Gas Supply Charges - Various Locations |
|
|
44019 |
9/06/2025 |
Allworks (WA) Pty Ltd |
$11,427.39 |
|
|
|
Heavy Equipment Hire - Engineering |
|
|
44020 |
9/06/2025 |
Altus Group Consulting Pty Ltd |
$4,620.00 |
|
|
|
Progress Claim 2 - Girrawheen Hub Redevelopment - Assets |
|
|
44021 |
9/06/2025 |
Anvil Doors Pty Ltd |
$62,978.30 |
|
|
|
Roller Shutter Door Renewal - Quinns Mindarie Surf Life Saving Club - Assets |
|
|
44022 |
9/06/2025 |
Aqua Kreartz |
$733.00 |
|
|
|
2 Art / Creative / Mindful Sessions - Cultural Services |
|
|
44023 |
9/06/2025 |
Art Gallery of Western Australia |
$6,600.00 |
|
|
|
Exhibition Fee "The Antipodean Manifesto" - Cultural Development |
|
|
44024 |
9/06/2025 |
Ascon Survey and Drafting |
$8,757.65 |
|
|
|
Ascon Surveys – Various Locations |
|
|
44025 |
9/06/2025 |
Athena Calisthenics Club |
$2,199.75 |
|
|
|
Facilitator Fees - Beach To Bush Arts Festival Paint And Sip Session |
|
|
44026 |
9/06/2025 |
Atlas Dry Cleaners |
$1,061.83 |
|
|
|
Fleet Workshops Laundry |
|
|
44027 |
9/06/2025 |
Audra de Pina |
$27.50 |
|
|
|
Refund - Food Application And Registration - Withdrawn |
|
|
44028 |
9/06/2025 |
Australian Airconditioning Services Pty Ltd |
$25,743.04 |
|
|
|
Airconditioning Maintenance Services - Various Locations |
|
|
44029 |
9/06/2025 |
Australian Institute of Management - Western Australia Human Resource Development Centre Limited |
$2,646.00 |
|
|
|
Health And Safety Representative Training - 2 Attendees |
|
|
44030 |
9/06/2025 |
Australian Volleyball Warehouse |
$342.00 |
|
|
|
Mikasa V330W Competition Volleyball - Kingsway |
|
|
44031 |
9/06/2025 |
AV Truck Service Pty Ltd |
$13,696.94 |
|
|
|
Vehicle Repairs - Fleet |
|
|
44032 |
9/06/2025 |
Bahar Saberi |
$63.00 |
|
|
|
Refund - Cancellation Of Courts On Bulk Booking - Kingsway |
|
|
44033 |
9/06/2025 |
BCA Consultants (WA) Pty Ltd |
$22,968.00 |
|
|
|
Detailed Asset Inspection And Investigation - Aquamotion |
|
|
44034 |
9/06/2025 |
Bladon WA Pty Ltd |
$2,373.80 |
|
|
|
Staff Uniform Issue |
|
|
|
|
Tote Bags - Books On Wheels Deliveries |
|
|
44035 |
9/06/2025 |
Blueprint Homes (WA) Pty Ltd |
$4,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44036 |
9/06/2025 |
Boopathi Pachiappan |
$44.53 |
|
|
|
Refund - Bulk Junk - Missed Collection 2023 / 2024 |
|
|
44037 |
9/06/2025 |
Boral Construction Materials Group Ltd |
$2,808.19 |
|
|
|
Concrete Mix - Various Locations |
|
|
44038 |
9/06/2025 |
Boya Equipment |
$802.60 |
|
|
|
Kubota UDT Transmission Oil 20 Litre - Fleet |
|
|
44039 |
9/06/2025 |
BP Australia Ltd |
$56,079.56 |
|
|
|
Fuel Issues For The City |
|
|
44040 |
9/06/2025 |
Brenton Gregory See t/a Threaded Ink |
$30,800.00 |
|
|
|
Appointed Artist To Provide Mural - Heath Park Pavilion |
|
|
44041 |
9/06/2025 |
Bridgestone Australia Limited |
$951.40 |
|
|
|
Tyre Fitting Services |
|
|
44042 |
9/06/2025 |
Bridgestone Australia Limited |
$10,968.73 |
|
|
|
Tyre Fitting Services |
|
|
44043 |
9/06/2025 |
Brownes Foods Operations Pty Limited |
$353.85 |
|
|
|
Milk Deliveries For The City |
|
|
44044 |
9/06/2025 |
Budo Group Pty Ltd |
$61.65 |
|
|
|
Refund - Building Application - Rejected |
|
|
44045 |
9/06/2025 |
Buildmark Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44046 |
9/06/2025 |
Built Ink Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44047 |
9/06/2025 |
BWY Engineering Consultants Pty Ltd |
$5,276.70 |
|
|
|
Condition Assessment And Validation - Park And Natural Area Assets Alkimos |
|
|
44048 |
9/06/2025 |
Cabcharge |
$894.25 |
|
|
|
Cabcharges For The City |
|
|
44049 |
9/06/2025 |
Car Care Motor Company Pty Ltd |
$4,767.22 |
|
|
|
Vehicle Services / Repairs |
|
|
44050 |
9/06/2025 |
Carramar Resources Industries |
$2,390.63 |
|
|
|
Fill Sand - Quinns Rocks Drainage / Lukin Drive Footpath |
|
|
44051 |
9/06/2025 |
Catherine Cronin |
$400.00 |
|
|
|
Workshops - Woman’s Wellbeing & Art Of Self Care - Library Services |
|
|
44052 |
9/06/2025 |
Civica Pty Ltd |
$53,625.00 |
|
|
|
Services Charge - Schedule 2A: Technical Implementation Services |
|
|
|
|
Services Charge - Schedule 2B: Initial Training |
|
|
44053 |
9/06/2025 |
Civiq Pty Ltd |
$15,075.90 |
|
|
|
Supply Two Drink Fountains - Heath Park |
|
|
44054 |
9/06/2025 |
Classic Home and Garage Innovations Pty Ltd |
$1,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44055 |
9/06/2025 |
Coca Cola Amatil Pty Ltd |
$315.14 |
|
|
|
Beverages - Kingsway Indoor Stadium |
|
|
44056 |
9/06/2025 |
Complete Office Supplies Pty Ltd |
$1,771.51 |
|
|
|
Stationery Purchases - Various Service Units |
|
|
44057 |
9/06/2025 |
Corsign (WA) Pty Ltd |
$416.46 |
|
|
|
Name Magnets For In / Out Board - Waste Services |
|
|
|
|
Street Name Plates |
|
|
44058 |
9/06/2025 |
Critical Fire Protection & Training Pty Ltd |
$11,765.89 |
|
|
|
Fire Protection / Detection Equipment Services - Various Locations |
|
|
44059 |
9/06/2025 |
Daimler Trucks Perth |
$272.78 |
|
|
|
Vehicle Spare Parts |
|
|
44060 |
9/06/2025 |
Dale Alcock Homes Pty Ltd |
$376.38 |
|
|
|
Refund - Street & Verge Bond |
|
|
44061 |
9/06/2025 |
Data #3 Limited |
$1,453.75 |
|
|
|
Software Subscriptions - ICT |
|
|
44062 |
9/06/2025 |
David Roy Cull |
$1,782.00 |
|
|
|
Pest Control Services - Various Locations |
|
|
44063 |
9/06/2025 |
Debra Bowen |
$500.00 |
|
|
|
CCTV Rebate |
|
|
44064 |
9/06/2025 |
Deloitte T&T Pty Ltd |
$192,500.00 |
|
|
|
Professional Services - Oracle ERP / EPM Solutions - ICT |
|
|
44065 |
9/06/2025 |
Densford Civil Pty Ltd |
$6,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44066 |
9/06/2025 |
Department of Energy, Mines, Industry Regulation & Safety |
$228,391.33 |
|
|
|
Building Services Levy - April 2025 |
|
|
44067 |
9/06/2025 |
Department of the Premier and Cabinet |
$660.51 |
|
|
|
Gazettal Notice - District Planning Scheme No. 2 Amendment No. 213 |
|
|
|
|
Gazettal Notice - Change Of Valuation Of Land Method |
|
|
44068 |
9/06/2025 |
DFS Industrial & Environmental Services Pty Ltd |
$57,523.83 |
|
|
|
Road Sweeping / Drain Cleaning Services - Various Locations |
|
|
44069 |
9/06/2025 |
Double G (WA) Pty Ltd |
$11,990.94 |
|
|
|
Irrigation Mainline Conversion - Tamarama Park |
|
|
44070 |
9/06/2025 |
Dowsing Group Pty Ltd |
$144,038.66 |
|
|
|
Concrete Works - Various Locations |
|
|
|
|
Concrete Works - Jordan Street |
|
|
|
|
Upgrade Intersection - Hepburn / Mirrabooka Avenue |
|
|
44071 |
9/06/2025 |
Dowsing Group Pty Ltd |
$27,630.90 |
|
|
|
Concrete Works - Various Locations |
|
|
44072 |
9/06/2025 |
Du Clene Pty Ltd |
$5,176.12 |
|
|
|
Cleaning Consumables / Services - Various Locations |
|
|
44073 |
9/06/2025 |
EBSCO International Incorporated |
$115.93 |
|
|
|
Magazine Subscriptions - Library Services |
|
|
44074 |
9/06/2025 |
Ecoburbia |
$585.20 |
|
|
|
Lady Marmalade Reading - Yanchep Library |
|
|
44075 |
9/06/2025 |
Elizabeth Mary Jackson |
$160.00 |
|
|
|
Tech Skills Workshop - Booking Holidays - Clarkson Library |
|
|
44076 |
9/06/2025 |
Epic Catering & Events Services Pty Ltd |
$2,662.00 |
|
|
|
Catering - Council Meals 27.05.2025 |
|
|
|
|
Catering - Concept Forum Dinner 03.06.2025 |
|
|
44077 |
9/06/2025 |
Ergolink |
$1,886.65 |
|
|
|
3 Office Chairs / Wrist Rest - Various Employees |
|
|
44078 |
9/06/2025 |
Evolve Talent Pty Ltd |
$17,257.50 |
|
|
|
Casual Labour Services |
|
|
44079 |
9/06/2025 |
Excalibur Printing Pty Ltd |
$4,038.43 |
|
|
|
Uniform Issue - Fire Services |
|
|
44080 |
9/06/2025 |
Cancelled |
|
|
44081 |
9/06/2025 |
Forch Australia Pty Ltd |
$1,356.85 |
|
|
|
Disposable Gloves / Supa Glue / Brake Clean - Stores |
|
|
44082 |
9/06/2025 |
Foxfish Pty Ltd t/as Binley Fencing |
$451.00 |
|
|
|
Temporary Fencing - Revolution Park |
|
|
44083 |
9/06/2025 |
Foxfish Pty Ltd t/as Binley Fencing |
$1,441.00 |
|
|
|
Supply Crowd Control Barriers Around Trees - Wanneroo Showgrounds |
|
|
44084 |
9/06/2025 |
Frontline Fire & Rescue Equipment |
$1,334.53 |
|
|
|
Spare Parts - Fire Units |
|
|
44085 |
9/06/2025 |
Fulton Hogan Industries Pty Ltd |
$5,860.80 |
|
|
|
Ezstreet Asphalt - Engineering |
|
|
44086 |
9/06/2025 |
Fusion Applications Pty Ltd |
$7,150.00 |
|
|
|
Consulting Fees For OICS Architecture Integration |
|
|
44087 |
9/06/2025 |
Geoff's Tree Service Pty Ltd |
$98,664.54 |
|
|
|
Pruning Services - Various Locations |
|
|
44088 |
9/06/2025 |
Golddubs Enterprises Pty Ltd |
$1,500.00 |
|
|
|
Beat / Production Workshop – Hainsworth Community Centre |
|
|
|
|
Dance Workshop – Hainsworth Community Centre For Beach To Bush Festival |
|
|
44089 |
9/06/2025 |
GPC Asia Pacific Pty Ltd |
$61.60 |
|
|
|
Vehicle Spare Parts |
|
|
44090 |
9/06/2025 |
Gray-Nicolls Sports Pty Ltd |
$253.00 |
|
|
|
10 Netballs - Kingsway |
|
|
44091 |
9/06/2025 |
Heatley Sales Pty Ltd |
$204.91 |
|
|
|
Vehicle Spare Parts |
|
|
44092 |
9/06/2025 |
HFM Asset Management Pty Ltd |
$10,612.70 |
|
|
|
Aquamotion - Asset Condition Audit And Data Validation |
|
|
44093 |
9/06/2025 |
Hodge Collard Preston Unit Trust |
$42,163.00 |
|
|
|
Architectural And Specialist Consultancy Services - Wanneroo Recreation Centre - Assets |
|
|
44094 |
9/06/2025 |
Home Group WA Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44095 |
9/06/2025 |
Hydroquip Pumps & Irrigation Pty Ltd |
$2,628.51 |
|
|
|
Irrigation Works - Various Locations |
|
|
44096 |
9/06/2025 |
Inspired Development Solutions Pty Ltd |
$1,540.00 |
|
Council Member Training – Lynda Folan |
|||
|
44097 |
9/06/2025 |
Integrity Industrial Pty Ltd |
$22,712.13 |
|
|
|
Casual Labour Services |
|
|
44098 |
9/06/2025 |
Integrity Industrial Pty Ltd |
$2,187.00 |
|
|
|
Casual Labour Services |
|
|
44099 |
9/06/2025 |
Interfire Agencies Pty Ltd |
$5,727.68 |
|
|
|
PPE Issue - Fire Services |
|
|
|
|
Heavy Duty Water Saver Gun - Fire Services |
|
|
44100 |
9/06/2025 |
IPWEA |
$6,974.00 |
|
|
|
Library Subscription - 01.07.2025 - 30.06.2026 |
|
|
|
|
Fleet Subscription - 01.07.2025 - 30.06.2026 |
|
|
44101 |
9/06/2025 |
J Blackwood & Son Ltd |
$179.61 |
|
|
|
3 Drawer Tidy / Whiteboard / Monitor Riser - Fleet |
|
|
44102 |
9/06/2025 |
J Blackwood & Son Ltd |
$744.86 |
|
|
|
10 Jerry Cans / Screwdriver / Face Shield - Stores |
|
|
44103 |
9/06/2025 |
Cancelled |
|
|
44104 |
9/06/2025 |
James McGovern t/a Governance Solutions |
$1,050.00 |
|
|
|
Council Report - Ward Review |
|
|
44105 |
9/06/2025 |
Japanese Truck & Bus Spares Pty Ltd |
$21.35 |
|
|
|
Vehicle Repair Parts |
|
|
44106 |
9/06/2025 |
JBA Pacific Scientists and Engineers Pty Ltd |
$2,530.00 |
|
|
|
Consulting Services - Costal Monitoring Program - Assets |
|
|
44107 |
9/06/2025 |
Jesal Patel |
$500.00 |
|
|
|
CCTV Rebate |
|
|
44108 |
9/06/2025 |
Jobfit Health Group Pty Ltd |
$2,018.50 |
|
|
|
Pre Employment Medical Assessments |
|
|
44109 |
9/06/2025 |
Johanna Wedgwood & Philip Wedgwood |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44110 |
9/06/2025 |
Jonathan Michael Cope t/a Kaleidoscope Multicultural Arts Management |
$6,560.00 |
|
|
|
World Music Cafe - Beach To Bush Arts Festival |
|
|
44111 |
9/06/2025 |
Joondalup Symphony Orchestra Inc. |
$480.00 |
|
|
|
Bar Management Including 2 Staff - World Cafe Event Time |
|
|
44112 |
9/06/2025 |
Julie Devries |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44113 |
9/06/2025 |
Jurovich Surveying Pty Ltd |
$32,230.00 |
|
|
|
Digital Ground Survey And Class B Utility Survey - Road Reserve – Butler Station To Alkimos |
|
|
44114 |
9/06/2025 |
Kaden Matchett |
$300.00 |
|
|
|
Fake ID Band - Beach To Bush |
|
|
44115 |
9/06/2025 |
Kardan Australia Pty Ltd |
$872.85 |
|
|
|
Fire Compliance Additional Works - Yanchep Sports And Social Club |
|
|
44116 |
9/06/2025 |
Kennedys (Australasia) Partnership trading as Kennedys Law |
$3,596.45 |
|
|
|
Legal Fees For The City |
|
|
44117 |
9/06/2025 |
Kleenit |
$2,963.82 |
|
|
|
Graffiti Removal - Various Locations |
|
|
44118 |
9/06/2025 |
Landcare Weed Control |
$53,362.60 |
|
|
|
Landscape Maintenance - Various Locations |
|
|
44119 |
9/06/2025 |
Law Gear |
$321.73 |
|
|
|
Garrison Leather Duty Belt |
|
|
44120 |
9/06/2025 |
Leadlight Repair |
$1,350.00 |
|
|
|
Repair Door Panel - Hainsworth Leisure Centre |
|
|
44121 |
9/06/2025 |
Leanne Bray |
$807.40 |
|
|
|
Workshop - Basket Making |
|
|
44122 |
9/06/2025 |
Lee Syminton |
$29,120.86 |
|
|
|
Design Services - Abbeville Sports Pavilion |
|
|
44123 |
9/06/2025 |
Leonie Helen Thompson trading as The Poster Girls |
$396.00 |
|
|
|
150 A3 Posters And 1000 A6 Postcard Distribution - 2025 CAAE Exhibition |
|
|
44124 |
9/06/2025 |
Lessen with Peg – Rethink Waste |
$550.00 |
|
|
|
Beeswax Wraps@ Caravan Expo, Wanneroo Showgrounds11/05/2025 |
|
|
44125 |
9/06/2025 |
LGISWA |
$5,000.00 |
|
|
|
Professional Indemnity - Property Damage - Excess Currently Applicable |
|
|
44126 |
9/06/2025 |
Lindsey Kellett |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44127 |
9/06/2025 |
Linemarking WA Pty Ltd |
$24,101.74 |
|
|
|
Linemarking Services - Various Locations |
|
|
44128 |
9/06/2025 |
Local Government Professionals Australia WA Inc |
$585.00 |
|
|
|
Workshop Registration - Finance For Non-Financial People |
|
|
44129 |
9/06/2025 |
Rates Refund |
$786.88 |
|
44130 |
9/06/2025 |
Main Roads WA |
$33,194.28 |
|
|
|
Line / Sign Installation - Salerno Drive / Anchorage Drive North |
|
|
44131 |
9/06/2025 |
Major Motors |
$2,263.91 |
|
|
|
Vehicle Spare Parts |
|
|
44132 |
9/06/2025 |
Martin Waterworth |
$500.00 |
|
|
|
CCTV Rebate |
|
|
44133 |
9/06/2025 |
Maryam Payendazada |
$350.00 |
|
|
|
Bond Refund |
|
|
44134 |
9/06/2025 |
Master Meyn |
$16,896.00 |
|
|
|
Provision Of Human Resources And Industrial Relations Services |
|
|
44135 |
9/06/2025 |
MDM Entertainment Pty Ltd |
$6,043.44 |
|
|
|
Wonderbooks Stock - Library Services |
|
|
44136 |
9/06/2025 |
Menegola Flooring Company |
$30,778.00 |
|
|
|
Flooring Removal / Install - Carramar Community Centre |
|
|
44137 |
9/06/2025 |
Mercer Consulting (Australia) Pty Ltd |
$6,490.00 |
|
|
|
Annual Remuneration Review |
|
|
44138 |
9/06/2025 |
Michael Andriotis |
$44.53 |
|
|
|
Bulk Junk - Missed Collection 2023 / 2024 |
|
|
44139 |
9/06/2025 |
Michael Page International (Australia)Pty Ltd |
$3,716.12 |
|
|
|
Casual Labour Services |
|
|
44140 |
9/06/2025 |
Mindarie Regional Council |
$279,227.28 |
|
|
|
Refuse Disposal Charges - Various |
|
|
44141 |
9/06/2025 |
Mini-Tankers Australia Pty Ltd |
$1,674.19 |
|
|
|
Fuel Issues For The City |
|
|
44142 |
9/06/2025 |
Naomi Clark |
$329.00 |
|
|
|
Refund- Skin Penetration Application – Not Required |
|
|
44143 |
9/06/2025 |
Northern Lawnmower & Chainsaw Specialists |
$108.50 |
|
|
|
Small Plant Spare Parts |
|
|
44144 |
9/06/2025 |
Nulook Homes Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44145 |
9/06/2025 |
Nuturf |
$7,073.00 |
|
|
|
Biostim Dredging Tabs / Instar Insecticide - Parks |
|
|
44146 |
9/06/2025 |
Officeworks Superstores Pty Ltd |
$713.95 |
|
|
|
2 Cabinets - Community And Place |
|
|
44147 |
9/06/2025 |
Omnicom Media Group Australia Pty Ltd trading as Marketforce |
$4,402.15 |
|
|
|
Advertising Services - Various |
|
|
44148 |
9/06/2025 |
On Edge Sports Pty Ltd t/a Cable Ski Cairns |
$1,650.00 |
|
|
|
Blue Pond Dye - Parks |
|
|
44149 |
9/06/2025 |
On Tap Services |
$18,354.84 |
|
|
|
Plumbing Maintenance Services - Various Locations |
|
|
44150 |
9/06/2025 |
On Track Fabrication |
$550.00 |
|
|
|
Repair Floor Tipper Body - Fleet |
|
|
44151 |
9/06/2025 |
One Tree Botanical Pty Ltd |
$19,800.00 |
|
|
|
Post-Burn Flora / Vegetation Survey - Franklin Park |
|
|
44152 |
9/06/2025 |
Oracle Corporation Australia Pty Ltd |
$2,060.44 |
|
|
|
EDU Cloud Applications Learning Subscription |
|
|
44153 |
9/06/2025 |
Paperbark Technologies Pty Ltd |
$2,029.96 |
|
|
|
Arboricultural Report - 7 Trees - Wanneroo Recreation Centre (Sports Hub) |
|
|
|
|
Arboricultural Site Meeting / Advice Report - 2 Trees - Carramar Golf Course |
|
|
44154 |
9/06/2025 |
Parker Black & Forrest |
$1,263.59 |
|
|
|
Locking Services - Various Locations |
|
|
44155 |
9/06/2025 |
Peter Moyes Anglican Community School |
$13,922.66 |
|
|
|
Auditorium Hire / Audio / Lighting - Beach To Bush Arts Festival |
|
|
|
|
Bump In / Crew / Programming - Beach To Bush Arts Festival |
|
|
44156 |
9/06/2025 |
Platinum Window Tinting & Glass Repair |
$185.00 |
|
|
|
Supply And Install Window Tint To Bobcat Window/ 96398 |
|
|
44157 |
9/06/2025 |
Powerhouse Batteries Pty Ltd |
$379.59 |
|
|
|
Battery Delkor - Fleet |
|
|
44158 |
9/06/2025 |
Powerlyt |
$495.00 |
|
|
|
Design / Implementation Services - Energy Reduction - Ashby Operations Centre |
|
|
44159 |
9/06/2025 |
Pranam & Dhyana Pty Ltd t/a PDCD Homes |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44160 |
9/06/2025 |
Print Integrity |
$2,304.50 |
|
|
|
Printing - Key Rings / Stress Balls / Sanitiser / Car Deodoriser / Pet Bag Dispenser |
|
|
44161 |
9/06/2025 |
Cancelled |
|
|
44162 |
9/06/2025 |
Programmed Skilled Workforce Limited |
$2,229.15 |
|
|
|
Casual Labour Services |
|
|
44163 |
9/06/2025 |
Pront Tow Towing / Wanneroo Towing Service |
$528.00 |
|
|
|
Towing Services - Fleet |
|
|
44164 |
9/06/2025 |
Rain Bird (Australia) Pty Ltd |
$5,176.60 |
|
|
|
Brighton Rainbird GSP Package - Central Software Year 1 |
|
|
44165 |
9/06/2025 |
Reliable Fencing WA Pty Ltd |
$963.84 |
|
|
|
Install 4 Bollards - Riverlinks Park |
|
|
44166 |
9/06/2025 |
Ricky Adams |
$170.00 |
|
|
|
Grand Finale At Peter Moyes - Beach To Bush Arts Festival |
|
|
44167 |
9/06/2025 |
Roads 2000 |
$320,007.19 |
|
|
|
Bus Embayment Road Construction - Girrawheen Avenue - Assets |
|
|
|
|
Progress Claim 2 - Upgrade Intersection - Mirrabooka Avenue / Hepburn Avenue |
|
|
|
|
Progress Claim 3 - Bus Embayments - Girrawheen Avenue |
|
|
44168 |
9/06/2025 |
Robert Harrold |
$380.00 |
|
|
|
Installation Of Artworks - Community Art Awards |
|
|
44169 |
9/06/2025 |
Robert Walters Pty Ltd |
$5,154.78 |
|
|
|
Casual Labour Services |
|
|
44170 |
9/06/2025 |
Robert Willis |
$7,040.00 |
|
|
|
Clarkson / Butler Cost Sharing Arrangements - Internal Transactional Review Assisting The Project Manager - Finance - Neerabup Industrial Area |
|
|
44171 |
9/06/2025 |
RW Quantity Surveyors |
$3,850.00 |
|
|
|
Quantity Surveying Consultancy Services - Abbeville Park Sports Amenities Building |
|
|
44172 |
9/06/2025 |
Safety And Rescue Equipment |
$2,142.27 |
|
|
|
Oldham Park Community Fac |
|
|
|
|
Update Signage - Supply / Install Adjustable Lanyard - Wanneroo Showgrounds Poultry Shed / Warradale Park Community Centre |
|
|
|
|
Install Signage - Fragile Roof - Replace Damaged Sign - Shelvock Park Sports Facility / Leach Road Duplex |
|
|
44173 |
9/06/2025 |
Safety Tactile Pave |
$377.34 |
|
|
|
Terracotta Tactiles - Pitcairn Entrance |
|
|
44174 |
9/06/2025 |
Safety World |
$1,285.41 |
|
|
|
PPE Issue - Various Employees |
|
|
44175 |
9/06/2025 |
Sanpoint Pty Ltd ATF Fiore Family Trust |
$89,327.38 |
|
|
|
Landscape Maintenance - Various Locations |
|
|
44176 |
9/06/2025 |
Sine Group Pty Ltd |
$108.90 |
|
|
|
iPad Device Management - Animal Care Centre |
|
|
44177 |
9/06/2025 |
Siria Lochrie |
$150.00 |
|
|
|
Hang Out At The Grove Stall - Youth Services |
|
|
44178 |
9/06/2025 |
SJ McKee Maintenance Pty Ltd |
$1,707.00 |
|
|
|
Repair Works - Various Locations - Waste |
|
|
44179 |
9/06/2025 |
Skills Force Australia (Wangara) |
$159.20 |
|
|
|
Training - Chief Warden - 1 Attendee |
|
|
44180 |
9/06/2025 |
SLR Consulting Australia Pty Ltd |
$21,274.00 |
|
|
|
Reporting - Basic Fauna & Black Cockatoo - Hepburn Park |
|
|
44181 |
9/06/2025 |
Soft Landing |
$708.84 |
|
|
|
Admin Processing Fee - Mattress Recycling - Waste |
|
|
44182 |
9/06/2025 |
SOLO Resource Recovery |
$11,797.50 |
|
|
|
Wet Hire Unit / Operator - Waste |
|
|
44183 |
9/06/2025 |
St Elizabeth's Catholic Primary School |
$200.00 |
|
|
|
Community Funding Program - Breakfast - Walk Safely To School Day |
|
|
44184 |
9/06/2025 |
St John Ambulance Western Australia Ltd |
$516.21 |
|
|
|
First Aid Training / Kit Servicing |
|
|
44185 |
9/06/2025 |
Stantec Australia Pty Ltd |
$33,881.96 |
|
|
|
Carpark Upgrade / Surrounds - Frederick Stubbs |
|
|
44186 |
9/06/2025 |
Stewart & Heaton Clothing Company Pty Ltd |
$715.80 |
|
|
|
Uniform Issue - Fire Services |
|
|
44187 |
9/06/2025 |
Stihl Shop Osborne Park |
$1,868.30 |
|
|
|
Small Plant Purchases - Brushcutters |
|
|
44188 |
9/06/2025 |
Superior Nominees Pty Ltd |
$10,060.03 |
|
|
|
Playground Equipment Repairs - Various Locations |
|
|
44189 |
9/06/2025 |
Sydney Tools Pty Ltd |
$2,221.00 |
|
|
|
Milwaukee Tools - Engineering Maintenance |
|
|
44190 |
9/06/2025 |
Synergy |
$669,318.41 |
|
|
|
Power Supply Charges - Various Locations |
|
|
44191 |
9/06/2025 |
T-Quip |
$487.88 |
|
|
|
Vehicle Spare Parts |
|
|
44192 |
9/06/2025 |
Taylor Burrell Barnett |
$801.90 |
|
|
|
Consultancy Services - Neerabup Management Plan / Subdivision Application - Assets |
|
|
44193 |
9/06/2025 |
Team Global Express Pty Ltd |
$453.40 |
|
|
|
Courier Services |
|
|
44194 |
9/06/2025 |
Tenfold Investments Pty Ltd |
$477.00 |
|
|
|
Catering - Fire Services Training |
|
|
44195 |
9/06/2025 |
The Hire Guys Wangara |
$4,264.00 |
|
|
|
Vehicle Hire - Mitsubishi Triton Ute - Parks / Waste |
|
|
44196 |
9/06/2025 |
The Royal Life Saving Society Australia |
$175.00 |
|
|
|
Lifeguard License Renewal - 1 Attendee |
|
|
44197 |
9/06/2025 |
Think Promotional |
$748.00 |
|
|
|
250 Encore Lanyards - Community Facilities |
|
|
44198 |
9/06/2025 |
Tiffany Weaver |
$66.50 |
|
|
|
Refund - Customer Requested Change Of Bin Size In Error |
|
|
44199 |
9/06/2025 |
Toolmart |
$3,550.00 |
|
|
|
6 Milwaukee M18 Inflator Skin - Conservation Management |
|
|
|
|
Belt Drive Air Compressor - WRC |
|
|
44200 |
9/06/2025 |
Total Green Recycling Pty Ltd |
$2,444.93 |
|
|
|
E-Waste Collection - Wangara Recycling Facility - Bulk Verge Services |
|
|
44201 |
9/06/2025 |
Totally Workwear Joondalup & Butler |
$302.51 |
|
|
|
PPE Issues - Various Employees |
|
|
44202 |
9/06/2025 |
Totally Workwear Joondalup & Butler |
$1,786.30 |
|
|
|
PPE Issues - Various Employees |
|
|
44203 |
9/06/2025 |
Triton Electrical Contractors Pty Ltd |
$93.50 |
|
|
|
Electrical Works - Brighton Pump Station |
|
|
44204 |
9/06/2025 |
Trophy Shop Australia |
$685.05 |
|
|
|
Name Badges - Various Employees |
|
|
|
|
Traffolyte Labels - Asset Planning Services |
|
|
44205 |
9/06/2025 |
Truck Centre WA Pty Ltd |
$604.36 |
|
|
|
Vehicle Spare Parts |
|
|
44206 |
9/06/2025 |
Urban Development Institute of Australia WA Division Incorporated |
$2,650.00 |
|
|
|
Registration - UDIA WA 2025 State Conference - Cr Huntley |
|
|
44207 |
9/06/2025 |
Valentina Prentoska |
$44.53 |
|
|
|
Refund - Bulk Junk - Missed Collection 2023 / 2024 |
|
|
44208 |
9/06/2025 |
Valvoline (Australia) Pty Ltd |
$13,414.85 |
|
|
|
Vehicle Oil - Stores |
|
|
44209 |
9/06/2025 |
Vaughn Joshua McGuire |
$605.00 |
|
|
|
Welcome To Country - Beach To Bush Arts Festival Finale |
|
|
44210 |
9/06/2025 |
Viva Energy Australia Pty Ltd |
$120,242.50 |
|
|
|
Fuel Issues For The City |
|
|
44211 |
9/06/2025 |
Wanneroo Electric |
$23,631.87 |
|
|
|
Electrical Maintenance Works - Various Locations |
|
|
44212 |
9/06/2025 |
Wanneroo Fire Support Brigade |
$600.00 |
|
|
|
Reimbursement - HR License Cost For Brigade Member |
|
|
44213 |
9/06/2025 |
Water Corporation |
$915.55 |
|
|
|
Water Supply Charges - Various Locations |
|
|
44214 |
9/06/2025 |
West Coast Turf |
$7,696.15 |
|
|
|
Turfing Works - Various Locations |
|
|
44215 |
9/06/2025 |
Western Irrigation Pty Ltd |
$1,362.90 |
|
|
|
Rain Bird 7" Round Valve Box With Green Lid - Parks |
|
|
44216 |
9/06/2025 |
Western Irrigation Pty Ltd |
$4,899.20 |
|
|
|
Irrigation Parts - 30.04.2025 - 06.05.2025 |
|
|
44217 |
9/06/2025 |
Westpeak Engineering Pty Ltd |
$4,020.23 |
|
|
|
Detailed Design - Quinns Rocks Universal Access Fishing Platform |
|
|
44218 |
9/06/2025 |
WEX Australia Pty Ltd |
$2,260.64 |
|
|
|
Fuel Issues - Fire Services |
|
|
44219 |
9/06/2025 |
William Buck Consulting (WA) Pty Ltd |
$2,200.00 |
|
|
|
Probity Services - Supply Of Fertilisers / Wetting Agents / Turf Products And Seed |
|
|
44220 |
9/06/2025 |
William Buck Consulting (WA) Pty Ltd |
$792.00 |
|
|
|
William Buck Audit And Risk Committee Independent Person - Reference Checks For 2 Candidates |
|
|
44221 |
9/06/2025 |
Work Clobber |
$711.30 |
|
|
|
PPE Issues - Various Employees |
|
|
44222 |
9/06/2025 |
Work Health Professionals Pty Ltd |
$1,032.90 |
|
|
|
Workplace Vaccination Program |
|
|
44223 |
9/06/2025 |
Workpower Incorporated |
$17,291.78 |
|
|
|
Planting & Maintenance - April 2025 - Parks |
|
|
|
|
Site Preparation Works - Quinns Foreshore Revegetation |
|
|
44224 |
9/06/2025 |
Wow Group (WA) Pty Ltd |
$111.50 |
|
|
|
Refund - Street & Verge Bond |
|
|
44225 |
9/06/2025 |
Yesra Mnahi |
$43.50 |
|
|
|
Refund - Bulk Junk - Missed Collection 2023 / 2024 |
|
|
44226 |
12/06/2025 |
ASN Conferences Pty Ltd |
$3,570.00 |
|
|
|
Registration - International Public Works Conference 2025 |
|
|
44227 |
12/06/2025 |
Australia Post |
$1,208.87 |
|
|
|
Postage Fees - Rates |
|
|
44228 |
12/06/2025 |
Emily Claire Hill-Ogbonnaya |
$328.00 |
|
|
|
Its All About Animals Interactive Show - Aquamotion |
|
|
44229 |
12/06/2025 |
Sanpoint Pty Ltd ATF Fiore Family Trust |
$26,386.80 |
|
|
|
Install Mulch - Splendid Park - Parks |
|
|
44230 |
12/06/2025 |
TC & Sons Enterprise Pty Ltd t/a ME Fire Solutions |
$225,815.48 |
|
|
|
Install Fire Indication Panels & Emergency Warning Information Systems - Kingsway Indoor Stadium And Wanneroo Aquamotion |
|
|
44231 |
12/06/2025 |
Team Global Express Pty Ltd |
$37.99 |
|
|
|
Courier Services |
|
|
44232 |
12/06/2025 |
Total Eden Pty Ltd |
$165.00 |
|
|
|
Valve Butterfly Wafer 50mm - Parks |
|
|
44233 |
12/06/2025 |
Impact Panel and Paint |
$1,000.00 |
|
|
|
Motor Vehicle Insurance Excess - WN 33692 |
|
|
44234 |
12/06/2025 |
Landgate |
$15,221.54 |
|
|
|
GR / UV Schedules - Rates |
|
|
|
|
Land Enquiries - Various |
|
|
44235 |
13/06/2025 |
Australia Post |
$9,507.61 |
|
|
|
Postage Charges For The City - Lodged |
|
|
44236 |
13/06/2025 |
Australia Post |
$2,693.92 |
|
|
|
Postage Charges For The City - May 2025 |
|
|
44237 |
16/06/2025 |
AARCO Environmental Solutions Pty Ltd |
$4,205.85 |
|
|
|
ACM Removal - Koondoola Regional Bushland / Mary Park |
|
|
44238 |
16/06/2025 |
ABM Landscaping |
$2,002.00 |
|
|
|
Paving Repair - Evandale / Wordsworth |
|
|
44239 |
16/06/2025 |
ABN Residential WA Pty Ltd |
$18,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44240 |
16/06/2025 |
ABN Residential WA Pty Ltd |
$36,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44241 |
16/06/2025 |
Access Technologies (Heytesbury Technologies Pty Ltd) |
$323.95 |
|
|
|
Repair Cable Gate - Frederick Stubbs Park |
|
|
44242 |
16/06/2025 |
Access Without Barriers Pty Ltd |
$249,448.55 |
|
|
|
Progress Claim 3 & 4 - Kingsway Sporting Complex Changerooms & Toilets |
|
|
44243 |
16/06/2025 |
Acclaimed Catering |
$18,151.38 |
|
|
|
Catering - Emergency Services Volunteer Dinner 05.06.2025 |
|
|
44244 |
16/06/2025 |
Action Glass & Aluminum |
$705.54 |
|
|
|
Reglazed 2 Broken Window Panels - Gumblossom Community Centre |
|
|
44245 |
16/06/2025 |
Advanced Lock & Key |
$8,074.00 |
|
|
|
Padlock Supplies - Stores |
|
|
44246 |
16/06/2025 |
Alinta Gas |
$24.30 |
|
|
|
Gas Supply Charges |
|
|
44247 |
16/06/2025 |
All Australian Safety Pty Ltd |
$958.17 |
|
|
|
Prescription Safety Glasses - 2 Employees |
|
|
44248 |
16/06/2025 |
Allworks (WA) Pty Ltd |
$56,034.00 |
|
|
|
Heavy Equipment Hire - Various |
|
|
44249 |
16/06/2025 |
Anchal Bawa |
$907.50 |
|
|
|
Vehicle Crossing Subsidy |
|
|
44250 |
16/06/2025 |
Aqua Attack Drilling |
$4,284.50 |
|
|
|
Decommission Bore - Belhaven Park |
|
|
44251 |
16/06/2025 |
Aqua Kreartz |
$275.00 |
|
|
|
Art Workshop - Beach To Bush Festival - Events |
|
|
44252 |
16/06/2025 |
Armada Construction Group |
$3,370.00 |
|
|
|
Refund - Building Application - Rejected |
|
|
44253 |
16/06/2025 |
Ascon Survey and Drafting |
$1,836.45 |
|
|
|
Surveying Services - Various Locations |
|
|
44254 |
16/06/2025 |
Aslab Pty Ltd |
$9,196.00 |
|
|
|
Asphalt Testing - Butterworth Avenue |
|
|
44255 |
16/06/2025 |
Assured Learning Australia Pty Ltd |
$650.00 |
|
|
|
Training - ALA-Canbus - 1 Attendee |
|
|
44256 |
16/06/2025 |
ATC Williams Pty Ltd |
$5,225.00 |
|
|
|
Geotechnical Investigation And Reporting - Alkimos Aquatic Centre |
|
|
44257 |
16/06/2025 |
Audi Centre Perth |
$53,193.09 |
|
|
|
Vehicle Service - Fleet |
|
|
|
|
New Vehicle Purchase - Audi A3 Sedan - Fleet Assets |
|
|
44258 |
16/06/2025 |
Aussie Natural Spring Water |
$35.85 |
|
|
|
Water Supplies - Yanchep Community Centre |
|
|
44259 |
16/06/2025 |
Australasian Performing Right Association |
$1,140.27 |
|
|
|
One Music Licence Fees - Kingsway |
|
|
44260 |
16/06/2025 |
Australian Airconditioning Services Pty Ltd |
$5,467.55 |
|
|
|
Airconditioning Maintenance Services - Various Locations |
|
|
44261 |
16/06/2025 |
Australian Services Union |
$212.00 |
|
|
|
Payroll Deductions |
|
|
44262 |
16/06/2025 |
Australian Taxation Office |
$746,060.00 |
|
|
|
Payroll Deductions |
|
|
44263 |
16/06/2025 |
Autoscreens Automotive Glass |
$137.50 |
|
|
|
Toyota Hiace Van - Chip In Windscreen |
|
|
44264 |
16/06/2025 |
Aveling |
$90.00 |
|
|
|
Training - Prepare To Work Safely In The Construction Industry - 1 Attendee |
|
|
44265 |
16/06/2025 |
Benara Nurseries, Quito Pty Ltd |
$920.31 |
|
|
|
Plant Supplies - Parks |
|
|
44266 |
16/06/2025 |
Bladon WA Pty Ltd |
$550.00 |
|
|
|
Sample Kit - Nyitting Custom Sublimated Polo-Shirts - Corporate Support |
|
|
44267 |
16/06/2025 |
Blue Force Pty Ltd |
$1,229.80 |
|
|
|
Supply / Install Time Lapse Camera - Heath Park |
|
|
44268 |
16/06/2025 |
Blueprint Homes (WA) Pty Ltd |
$12,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44269 |
16/06/2025 |
Boral Construction Materials Group Ltd |
$780.12 |
|
|
|
Concrete Mix - 2 Locations |
|
|
44270 |
16/06/2025 |
Boya Equipment |
$1,203.91 |
|
|
|
Vehicle Oil - Stores |
|
|
44271 |
16/06/2025 |
Rates Refund |
$920.00 |
|
44272 |
16/06/2025 |
Bridgestone Australia Limited |
$11,945.56 |
|
|
|
Tyre Fitting Services |
|
|
44273 |
16/06/2025 |
Bridgestone Australia Limited |
$1,575.87 |
|
|
|
Tyre Fitting Services |
|
|
44274 |
16/06/2025 |
Brownes Foods Operations Pty Limited |
$252.75 |
|
|
|
Milk Deliveries For The City |
|
|
44275 |
16/06/2025 |
Bunzl Limited |
$186.23 |
|
|
|
Dispenser - Aquarius Skin Care - Stores |
|
|
44276 |
16/06/2025 |
Car Care Motor Company Pty Ltd |
$3,711.37 |
|
|
|
Vehicle Services / Repairs |
|
|
44277 |
16/06/2025 |
CFMEU |
$110.00 |
|
|
|
Payroll Deductions |
|
|
44278 |
16/06/2025 |
City of Wanneroo |
$496.00 |
|
|
|
Payroll Deductions |
|
|
44279 |
16/06/2025 |
Civil Sciences and Engineering |
$7,579.00 |
|
|
|
2025 / 2026 Transport Assets Renewal Program - Examine & Analyse Various Roads |
|
|
|
|
Update Cost Estimates - Hawkins Road / Townsend Road Commodity Routes |
|
|
44280 |
16/06/2025 |
Clayton Utz |
$8,937.50 |
|
|
|
Legal Fees For The City |
|
|
44281 |
16/06/2025 |
Coca Cola Amatil Pty Ltd |
$434.04 |
|
|
|
Beverages - Kingsway Indoor Stadium |
|
|
44282 |
16/06/2025 |
Complete Office Supplies Pty Ltd |
$1,455.30 |
|
|
|
Stationery Supplies For The City |
|
|
44283 |
16/06/2025 |
Corsign (WA) Pty Ltd |
$3,029.75 |
|
|
|
Sign - Mirrabooka / Hepburn RAB |
|
|
|
|
Signs - Golf Prohibited |
|
|
|
|
Signs - No Fishing |
|
|
|
|
Signs - Prohibition - No Camping |
|
|
|
|
Signs - Snake Habitat Caution |
|
|
|
|
Street Name Plates |
|
|
44284 |
16/06/2025 |
Cr Alexander Figg |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44285 |
16/06/2025 |
Cr Bronwyn Smith |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44286 |
16/06/2025 |
Cr Eman Seif |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44287 |
16/06/2025 |
Cr Glynis Parker |
$2,773.17 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44288 |
16/06/2025 |
Cr Helen Berry |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44289 |
16/06/2025 |
Cr Jacqueline Huntley |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44290 |
16/06/2025 |
Cr James Rowe |
$4,973.33 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44291 |
16/06/2025 |
Cr Jordan Wright |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44292 |
16/06/2025 |
CR Kennedy & Co Pty Ltd |
$2,555.30 |
|
|
|
Vehicle Repairs - Fleet |
|
|
44293 |
16/06/2025 |
Cr Marizane Moore |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44294 |
16/06/2025 |
Cr Natalie Herridge |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44295 |
16/06/2025 |
Cr Paul Miles |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44296 |
16/06/2025 |
Cr Philip Bedworth |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44297 |
16/06/2025 |
Cr Sonet Coetzee |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44298 |
16/06/2025 |
Cr Vinh Nguyen |
$2,911.28 |
|
|
|
Monthly Meeting Attendance Allowance — May 2025 |
|
|
44299 |
16/06/2025 |
Craneswest (WA) Pty Ltd |
$308.00 |
|
|
|
Turf Debris Removal - Ferrara Park |
|
|
44300 |
16/06/2025 |
Dale Alcock Homes Pty Ltd |
$4,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44301 |
16/06/2025 |
Darragh Singleton |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44302 |
16/06/2025 |
Rates Refund |
$287.36 |
|
44303 |
16/06/2025 |
David Roy Cull |
$176.00 |
|
|
|
General Pest Service - Rodents - Girrawheen Senior Citizens |
|
|
44304 |
16/06/2025 |
Deloitte T&T Pty Ltd |
$75,546.08 |
|
|
|
Fees For Professional Services - ICT |
|
|
44305 |
16/06/2025 |
Delos Delta Pty Ltd |
$13,032.25 |
|
|
|
Draft - ICT Strategy |
|
|
44306 |
16/06/2025 |
Densford Civil Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44307 |
16/06/2025 |
Department of Fire & Emergency Services |
$2,983,989.21 |
|
|
|
2024 / 2025 ESL Quarter 4 |
|
|
44308 |
16/06/2025 |
DFS Industrial & Environmental Services Pty Ltd |
$63,106.27 |
|
|
|
Road Sweeping / Drain Cleaning Services - Various Locations |
|
|
44309 |
16/06/2025 |
Diane Cubitt t/a Hosha Holdings |
$255.00 |
|
|
|
Judging Panel - 2025 CAAE |
|
|
44310 |
16/06/2025 |
Distinct Homes Pty Ltd |
$4,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44311 |
16/06/2025 |
Donald Cullen |
$500.00 |
|
|
|
CCTV Rebate |
|
|
44312 |
16/06/2025 |
Dowsing Group Pty Ltd |
$2,750.00 |
|
|
|
Carry Out Footpath Repair / Replacement - Hopetoun Drive |
|
|
44313 |
16/06/2025 |
Dowsing Group Pty Ltd |
$39,849.85 |
|
|
|
Concrete Mix - Various Locations |
|
|
44314 |
16/06/2025 |
Drovers Vet Hospital Pty Ltd |
$228.90 |
|
|
|
Veterinary Charges - Community Safety |
|
|
44315 |
16/06/2025 |
Du Clene Pty Ltd |
$3,834.47 |
|
|
|
North Cleaning - Consumables |
|
|
44316 |
16/06/2025 |
Eclipse Soils |
$462.00 |
|
|
|
Supply 60 Cubes Of Mulch - Pearsall Hocking Community Centre |
|
|
44317 |
16/06/2025 |
Edith Cowan University |
$15,585.35 |
|
|
|
Research Project - Investigating The Impact Of An Increasingly Urbanised Catchment On The Yellagonga Wetlands |
|
|
44318 |
16/06/2025 |
Embroidme Malaga Pty Ltd, Fully Promoted Malaga |
$635.80 |
|
|
|
Staff Uniforms - Community Services |
|
|
44319 |
16/06/2025 |
Essential First Choice Homes Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44320 |
16/06/2025 |
Evolve Talent Pty Ltd |
$4,486.35 |
|
|
|
Casual Labour Services |
|
|
44321 |
16/06/2025 |
Facet |
$550.00 |
|
|
|
Photography - LGA Forum Event |
|
|
44322 |
16/06/2025 |
Feral Invasive Species Eradication |
$1,925.00 |
|
|
|
Fox Control - Yellagonga |
|
|
44323 |
16/06/2025 |
First 5 Minutes Pty Ltd |
$473.00 |
|
|
|
Consulting Services - Lockdown Procedure |
|
|
44324 |
16/06/2025 |
Fleet Network |
$12,929.91 |
|
|
|
Payroll Deductions |
|
|
44325 |
16/06/2025 |
Fluidra Group Australia Pty Ltd |
$946.00 |
|
|
|
Pool Test Kits - Aquamotion |
|
|
44326 |
16/06/2025 |
Focus Consulting WA Pty Ltd |
$16,614.40 |
|
|
|
Initial Survey - Report - Building To See If Lightning Protection System |
|
|
|
|
Contract Administration - Carramar Golf Course Electrical Infrastructure Renewal Works |
|
|
|
|
Electrical Consulting Services - Kingsway AFL Sport Lighting Investigations & Documentation |
|
|
44327 |
16/06/2025 |
Fusion Applications Pty Ltd |
$6,077.50 |
|
|
|
Consulting Fees For OICS Architecture Integration |
|
|
44328 |
16/06/2025 |
Geoff's Tree Service Pty Ltd |
$54,742.18 |
|
|
|
Tree Pruning Services |
|
|
44329 |
16/06/2025 |
GJ Woodard |
$243.55 |
|
|
|
Keyholder Payments |
|
|
44330 |
16/06/2025 |
Global Marine Enclosures Pty Ltd |
$2,942.50 |
|
|
|
Quinns Beach Swimming Enclosure Management - Monthly Winter Maintenance |
|
|
44331 |
16/06/2025 |
Halifax Earthmoving Pty Ltd |
$6,490.00 |
|
|
|
Dry Hire - High Reach Loader |
|
|
44332 |
16/06/2025 |
Halpd Pty Ltd Trading As Affordable Living Homes |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44333 |
16/06/2025 |
Hang Art Pty Ltd |
$2,112.00 |
|
|
|
Art Awards 15 - 16.05.2025 |
|
|
44334 |
16/06/2025 |
Hannah Suleman |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44335 |
16/06/2025 |
Hays Personnel Services |
$1,711.15 |
|
|
|
Casual Labour Services |
|
|
44336 |
16/06/2025 |
Healing Hearts |
$92.40 |
|
|
|
Hire Fee Refund |
|
|
44337 |
16/06/2025 |
Heavy Automatics Pty Ltd |
$677.60 |
|
|
|
Vehicle Spare Parts |
|
|
44338 |
16/06/2025 |
Heidelberg Materials Pty Ltd |
$601.92 |
|
|
|
Supply Of Concrete - Engineering |
|
|
44339 |
16/06/2025 |
Hickey Constructions Pty Ltd |
$329,986.75 |
|
|
|
Damaged Limestone Capping - Longford Park |
|
|
|
|
Demolition - Yanchep Old Surf Club Building |
|
|
|
|
Repair Damaged Limestone Wall - Kingsway Olympic Soccer 1 |
|
|
|
|
Progress Claim 4 - Gumblossom Community Centre Upgrade Works |
|
|
|
|
Yanchep Stair Construction - Yanchep Lagoon Kiosk |
|
|
44340 |
16/06/2025 |
Home Group WA Pty Ltd |
$16,110.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44341 |
16/06/2025 |
HopgoodGanim Lawyers |
$1,650.76 |
|
|
|
Legal Fees For The City |
|
|
44342 |
16/06/2025 |
Hose Right |
$7,949.54 |
|
|
|
Hose Repairs & Maintenance - Fleet |
|
|
44343 |
16/06/2025 |
Hydroquip Pumps & Irrigation Pty Ltd |
$239.32 |
|
|
|
Low Pressure On Pump Gauge Needs Pump Tested - Cockman House |
|
|
44344 |
16/06/2025 |
Ideal Homes Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44345 |
16/06/2025 |
Imagesource Digital Solutions |
$2,437.60 |
|
|
|
Exhibition Glass Wrap Banners & Corflutes - Community Art Awards 2025 |
|
|
|
|
Logo Install - Splendid Park Pavilion |
|
|
|
|
Pull Up Banner - Recycling |
|
|
44346 |
16/06/2025 |
Insight Urbanism |
$660.00 |
|
|
|
Planning Solutions - Alkimos Shopping Centre |
|
|
44347 |
16/06/2025 |
Integrity Industrial Pty Ltd |
$24,922.87 |
|
|
|
Casual Labour Services |
|
|
44348 |
16/06/2025 |
Integrity Industrial Pty Ltd |
$10,438.05 |
|
|
|
Casual Labour Services |
|
|
44349 |
16/06/2025 |
Integrity Staffing |
$8,927.79 |
|
|
|
Casual Labour Services |
|
|
44350 |
16/06/2025 |
Interfire Agencies Pty Ltd |
$226.01 |
|
|
|
Lights - Dual Flash - Red Blue - Fire Services |
|
|
44351 |
16/06/2025 |
Interfire Agencies Pty Ltd |
$10,920.51 |
|
|
|
PPE Equipment - Fire Services |
|
|
44352 |
16/06/2025 |
Ixom Operations Pty Ltd |
$2,826.65 |
|
|
|
Pool Chemicals - Aquamotion |
|
|
44353 |
16/06/2025 |
J Blackwood & Son Ltd |
$1,863.42 |
|
|
|
Torches / Disposable Gloves / Respirator Kits |
|
|
44354 |
16/06/2025 |
J Blackwood & Son Ltd |
$646.80 |
|
|
|
Pedestal Mobile Go - Fleet |
|
|
44355 |
16/06/2025 |
Jackson McDonald |
$1,445.40 |
|
|
|
Legal Fees For The City |
|
|
44356 |
16/06/2025 |
James Bennett Pty Ltd |
$355,166.68 |
|
|
|
Book Stock For Library Services |
|
|
44357 |
16/06/2025 |
Japanese Truck & Bus Spares Pty Ltd |
$250.40 |
|
|
|
Vehicle Spare Parts |
|
|
44358 |
16/06/2025 |
Jason Kim Gravenall |
$441.00 |
|
|
|
Refund - Development Application - Incomplete |
|
|
44359 |
16/06/2025 |
Rates Refund |
$60.00 |
|
44360 |
16/06/2025 |
Jensen Hughes Pty Ltd |
$660.00 |
|
|
|
UAT Performance Solution Report And Certification |
|
|
44361 |
16/06/2025 |
Jodie Aedy Freelance Graphic Designer |
$467.50 |
|
|
|
Graphic Design - Business Wanneroo Pull Up Banners |
|
|
|
|
Pre-Project Evaluation Poster Design - E-Scooter Savvy Parents |
|
|
44362 |
16/06/2025 |
K & K Facility Services Pty Ltd |
$2,981.99 |
|
|
|
Cleaning Services / Supplies For The City |
|
|
44363 |
16/06/2025 |
Kardan Australia Pty Ltd |
$4,322.51 |
|
|
|
Fabricate / Install Custom Pressings To 2 Windows |
|
|
44364 |
16/06/2025 |
Kerb Direct Kerbing |
$25,480.38 |
|
|
|
Kerbing Works - Various Locations |
|
|
44365 |
16/06/2025 |
Kerb Direct Kerbing |
$3,943.66 |
|
|
|
Kerbing Works - Topeka Place |
|
|
44366 |
16/06/2025 |
Kleenit |
$5,351.18 |
|
|
|
Graffiti Removal - Various Locations |
|
|
44367 |
16/06/2025 |
Kleenit |
$523.60 |
|
|
|
Pressure Wash Table & Chairs - Protea Park |
|
|
44368 |
16/06/2025 |
Kyocera Document Solutions |
$5,600.32 |
|
|
|
Photocopier Meter Reading |
|
|
44369 |
16/06/2025 |
La Vida Australia Pty Ltd |
$4,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44370 |
16/06/2025 |
Landcare Weed Control |
$5,445.83 |
|
|
|
Landscape Maintenance Services - Various Locations |
|
|
44371 |
16/06/2025 |
Laundry Express |
$946.17 |
|
|
|
Laundry Services - Hospitality |
|
|
44372 |
16/06/2025 |
Lawn Doctor Turf Solutions |
$7,333.10 |
|
|
|
Turfing Works - Various Locations |
|
|
44373 |
16/06/2025 |
Local Government Professionals Australia WA Inc |
$585.00 |
|
|
|
Training- Finance For Non-Finance People - 1 Attendee |
|
|
44374 |
16/06/2025 |
M Gregory Legal |
$1,518.00 |
|
|
|
Legal Fees For The City |
|
|
44375 |
16/06/2025 |
Madhan Ramalingam |
$500.00 |
|
|
|
CCTV Rebate |
|
|
44376 |
16/06/2025 |
Main Roads WA |
$5,532.59 |
|
|
|
MRWA Signal Loops Reinstatement - Beach Road |
|
|
44377 |
16/06/2025 |
Major Motors |
$1,756.83 |
|
|
|
Vehicle Service - Fleet |
|
|
44378 |
16/06/2025 |
Marese Cox |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44379 |
16/06/2025 |
Maxxia Pty Ltd |
$10,200.05 |
|
|
|
Payroll Deductions |
|
|
44380 |
16/06/2025 |
Mayor Linda Aitken |
$12,614.62 |
|
|
|
Meeting Attendance Allowance — May 2025 |
|
|
44381 |
16/06/2025 |
McGees Property |
$2,200.00 |
|
|
|
Valuation – Market Rental - Property Services |
|
|
44382 |
16/06/2025 |
McLeods Lawyers Pty Ltd |
$3,016.56 |
|
|
|
Legal Fees For The City |
|
|
44383 |
16/06/2025 |
MDM Entertainment Pty Ltd |
$1,459.46 |
|
|
|
Wonderbooks Stock - Library Services |
|
|
44384 |
16/06/2025 |
Michael Page International (Australia)Pty Ltd |
$13,196.67 |
|
|
|
Casual Labour Services |
|
|
44385 |
16/06/2025 |
Mindarie Regional Council |
$208,564.36 |
|
|
|
Refuse Disposal Charges |
|
|
44386 |
16/06/2025 |
Mitchell Bowe |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44387 |
16/06/2025 |
MME Underground Services Pty Ltd |
$31,261.56 |
|
|
|
Service Scan - Irrigation Bores - Abbeville Park |
|
|
|
|
GPR Scan - Various Playgrounds |
|
|
44388 |
16/06/2025 |
Modern Motor Trimmers |
$380.03 |
|
|
|
New Seat Covers - Workshop Service Vehicle |
|
|
44389 |
16/06/2025 |
Ms Peggy Brown |
$145.00 |
|
|
|
Keyholder Payments |
|
|
44390 |
16/06/2025 |
My Homes WA |
$10,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44391 |
16/06/2025 |
Natural Area Consulting Management Services |
$2,008.86 |
|
|
|
Landscape Maintenance / Feral Animal Management - Various Locations |
|
|
44392 |
16/06/2025 |
Cancelled |
|
|
44393 |
16/06/2025 |
Nutrien Ag Solutions Limited |
$71.28 |
|
|
|
Hort 1 Ant - Mintaro Park |
|
|
44394 |
16/06/2025 |
Officeworks Superstores Pty Ltd |
$3,341.31 |
|
|
|
6 Desks / 3 Drawers - Aquamotion |
|
|
44395 |
16/06/2025 |
On Road Auto Electrics |
$1,525.50 |
|
|
|
Vehicle Electrical Works - Fleet |
|
|
44396 |
16/06/2025 |
On Tap Services |
$13,009.92 |
|
|
|
Plumbing Maintenance Works - Various Locations |
|
|
44397 |
16/06/2025 |
Optus |
$25,804.56 |
|
|
|
Phone Charges For The City |
|
|
|
|
Workm8 - Hardwired Tracking Hardware And Monthly Software Access - Fleet Assets |
|
|
44398 |
16/06/2025 |
Oracle Corporation Australia Pty Ltd |
$2,060.44 |
|
|
|
Subscription - EDU Cloud Applications Learning |
|
|
44399 |
16/06/2025 |
Paperbark Technologies Pty Ltd |
$7,351.08 |
|
|
|
Arboricultural Tree Survey & Assessments - 7 Trees - Opportunity Play Space |
|
|
|
|
Street Tree Data Collection - 756 Street Trees - Clarkson |
|
|
44400 |
16/06/2025 |
Parker Black & Forrest |
$1,391.70 |
|
|
|
Locking Services - Various Locations |
|
|
44401 |
16/06/2025 |
Paul Williamson |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44402 |
16/06/2025 |
Paywise Pty Ltd |
$6,027.27 |
|
|
|
Payroll Deductions |
|
|
44403 |
16/06/2025 |
Perth Heavy Tow |
$924.00 |
|
|
|
Towing Services - Fleet |
|
|
44404 |
16/06/2025 |
Perth Playground And Rubber |
$54,846.00 |
|
|
|
Installation Of Softfall - Anthony Waring Park |
|
|
|
|
Repair Softfall - Various Locations |
|
|
44405 |
16/06/2025 |
Peter Phur |
$485.10 |
|
|
|
CCTV Rebate |
|
|
44406 |
16/06/2025 |
Peter's Bus Charters |
$580.00 |
|
|
|
Pick Up And Return From City Of Wanneroo To Do Public Art Safari |
|
|
44407 |
16/06/2025 |
PharmCo (WA) Pty Ltd |
$6,050.00 |
|
|
|
Supply Everlasting Seeds To Be Sown In Streetscape Sites |
|
|
44408 |
16/06/2025 |
Planning Institute of Australia Limited |
$2,460.00 |
|
|
|
PIA WA State Conference 2025 - 4 Attendees |
|
|
44409 |
16/06/2025 |
Play Check Pty Ltd |
$385.00 |
|
|
|
Rubber Surface Impact Testing - Anthony Waring Park |
|
|
44410 |
16/06/2025 |
POP! Floral Studio |
$330.00 |
|
|
|
Bereavement Flowers - Kostov Family |
|
|
|
|
Arrangements - Mrs Oriel Green And Mrs Kathleen G William’s 90th Birthdays |
|
|
44411 |
16/06/2025 |
Prensa Pty Ltd |
$3,652.00 |
|
|
|
Professional Services - Asbestos Hygiene Services Conducted - Mary Street Reserve |
|
|
44412 |
16/06/2025 |
Prime West Constructions Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44413 |
16/06/2025 |
Pro Crack Seal |
$5,445.00 |
|
|
|
Apply Crack Sealing - Joondalup Drive - Pinjar Road To Waldburg Drive |
|
|
44414 |
16/06/2025 |
Pure Homes Pty Ltd t/a B1 Homes |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44415 |
16/06/2025 |
Quik Corp Pty Ltd |
$83,981.99 |
|
|
|
Supply / Delivery - 2 400L Spray Units & 2 600L Spray Units |
|
|
44416 |
16/06/2025 |
Reffing Hoops |
$2,501.79 |
|
|
|
Netball Umpire Services - Kingsway |
|
|
44417 |
16/06/2025 |
Reinol WA |
$374.88 |
|
|
|
Reinol "K" Hand Cleaner Dispenser Cartridge |
|
|
44418 |
16/06/2025 |
Reliable Fencing WA Pty Ltd |
$40,529.88 |
|
|
|
Fencing Works - Various Locations |
|
|
44419 |
16/06/2025 |
Resero Pty Ltd |
$3,734.50 |
|
|
|
50 Viva Stadium Seats - Parks Operations |
|
|
44420 |
16/06/2025 |
Residential Building WA Pty Ltd |
$4,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44421 |
16/06/2025 |
Robert Walters Pty Ltd |
$5,154.78 |
|
|
|
Casual Labour Services |
|
|
44422 |
16/06/2025 |
Roxanne Howells & Clifton Howells |
$2,985.70 |
|
|
|
Refund - Street & Verge Bond |
|
|
|
|
Vehicle Crossing Subsidy |
|
|
44423 |
16/06/2025 |
Sabrina Beate Hansen |
$2,240.00 |
|
|
|
Graphic Design Services - Various |
|
|
44424 |
16/06/2025 |
Safety World |
$237.60 |
|
|
|
Staff Uniforms - Waste Services |
|
|
44425 |
16/06/2025 |
Sanpoint Pty Ltd ATF Fiore Family Trust |
$125,440.00 |
|
|
|
Landscape Maintenance Services - Varius Locations |
|
|
44426 |
16/06/2025 |
Savannah Casey Turner-Wood T/a Second Spark Studios |
$520.00 |
|
|
|
Workshop - Paint Your Own Patches |
|
|
44427 |
16/06/2025 |
SCA Architecture Studio Pty Ltd |
$5,225.00 |
|
|
|
Wanneroo Showgrounds Refurbishment Additional Sketches And Compliance Report |
|
|
44428 |
16/06/2025 |
Seabreeze Landscape Supplies |
$38.00 |
|
|
|
Landscape Supplies - Parks |
|
|
44429 |
16/06/2025 |
Sincerity Group Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44430 |
16/06/2025 |
Site Sentry Pty Ltd |
$2,510.20 |
|
|
|
Site Sentry Solar Security Tower - McCoy Park |
|
|
44431 |
16/06/2025 |
Slater-Gartrell Sports |
$594.00 |
|
|
|
Netball Nets And Post Repairs - Halesworth Park |
|
|
44432 |
16/06/2025 |
Smartsalary |
$1,890.47 |
|
|
|
Payroll Deductions |
|
|
44433 |
16/06/2025 |
SNK Construction Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44434 |
16/06/2025 |
Sofia Rippingale |
$200.00 |
|
|
|
Solo Singer - Beach To Bush Festival |
|
|
44435 |
16/06/2025 |
SSB Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44436 |
16/06/2025 |
St James Anglican School |
$295.00 |
|
|
|
Refund - Development Application - No Longer Required |
|
|
44437 |
16/06/2025 |
St John Ambulance Western Australia Ltd |
$6,235.28 |
|
|
|
First Aid Kits And Defibs Servicing |
|
|
|
|
Defibrillator Cr2 Essential Lifepak - Facilities |
|
|
44438 |
16/06/2025 |
Standards Australia |
$4,772.50 |
|
|
|
Licensing Fee - Document Access |
|
|
44439 |
16/06/2025 |
Sunsafe Australia Pty Ltd |
$897.60 |
|
|
|
Staff Uniforms - Compliance Services |
|
|
44440 |
16/06/2025 |
Superior Nominees Pty Ltd |
$34,270.30 |
|
|
|
Playground Equipment Repairs - Various Locations |
|
|
|
|
Install Drink Fountain - Appleby Park |
|
|
|
|
Two Standard Accessible Bench Seat With Concrete Pad - Paloma Park |
|
|
44441 |
16/06/2025 |
Suzanne Jurleka |
$1,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44442 |
16/06/2025 |
Swan Group WA |
$1,705,177.40 |
|
|
|
Progress Claim 10 - Dordaak Kepup - Assets |
|
|
44443 |
16/06/2025 |
Team Global Express Pty Ltd |
$1,138.26 |
|
|
|
Courier Services For The City |
|
|
44444 |
16/06/2025 |
Technology One Limited |
$6,380.00 |
|
|
|
AMS Program - 01.06.2025 - 30.06.2025 - ICT |
|
|
44445 |
16/06/2025 |
The Distributors Perth |
$211.60 |
|
|
|
Confectionary - Kingsway |
|
|
44446 |
16/06/2025 |
The Hire Guys Wangara |
$2,789.00 |
|
|
|
Equipment Hire - Auger Hire / Isuzu D-Max |
|
|
|
|
Generators - Banksia Grove Hang Out At The Grove 2025 - Childhood And Youth Services |
|
|
44447 |
16/06/2025 |
The Local Government, Racing and Cemeteries Employees Union (WA) |
$990.00 |
|
|
|
Payroll Deductions |
|
|
44448 |
16/06/2025 |
The Trustee for Talis Unit Trust T/a Talis Consultants |
$28,116.00 |
|
|
|
Consultancy Services - Neerabup Enabling Works |
|
|
|
|
Design And Documentation - Wangara Waste Transfer Station |
|
|
44449 |
16/06/2025 |
Toolmart |
$550.00 |
|
|
|
Workshop Tools & Equipment |
|
|
44450 |
16/06/2025 |
Toro Australia Group Sales Pty Ltd |
$1,256.07 |
|
|
|
Small Plant Spare Parts |
|
|
44451 |
16/06/2025 |
Total Tools Joondalup |
$5,059.60 |
|
|
|
Concrete Saw & Blades - Asset Maintenance |
|
|
44452 |
16/06/2025 |
Tracey Nicolson |
$8,050.00 |
|
|
|
Community Service Leadership Program - People & Culture |
|
|
44453 |
16/06/2025 |
Trailer Parts Pty Ltd |
$169.50 |
|
|
|
Vehicle Spare Parts |
|
|
44454 |
16/06/2025 |
Trophy Shop Australia |
$83.40 |
|
|
|
Name Badges - Various Employees |
|
|
44455 |
16/06/2025 |
Truck Centre WA Pty Ltd |
$11,618.88 |
|
|
|
Vehicle Spare Parts |
|
|
44456 |
16/06/2025 |
Vocus Pty Ltd |
$12,089.00 |
|
|
|
Additional Lowering Works – Stage 2 - Prindiville Drive / Hartman Drive |
|
|
44457 |
16/06/2025 |
WA Garage Doors Pty Ltd |
$6,765.00 |
|
|
|
Service All Panel Lift / Roller Doors - Various Locations |
|
|
44458 |
16/06/2025 |
Wanneroo Electric |
$13,634.61 |
|
|
|
Electrical Maintenance Services - Various Locations |
|
|
44459 |
16/06/2025 |
Wanneroo Patios |
$147.00 |
|
|
|
Refund - Development Application - Not Required |
|
|
44460 |
16/06/2025 |
Water Corporation |
$278.91 |
|
|
|
Water Supply Charges |
|
|
44461 |
16/06/2025 |
Water Corporation |
$2,245.67 |
|
|
|
Water Supply Charges |
|
|
44462 |
16/06/2025 |
West Coast 4x4 Recovery Pty Ltd |
$440.00 |
|
|
|
Recovery Of A Tipper Truck |
|
|
44463 |
16/06/2025 |
West Coast Shade Pty Ltd |
$16,258.00 |
|
|
|
Shade Sails - Grandis Park |
|
|
44464 |
16/06/2025 |
West Coast Turf |
$1,969.00 |
|
|
|
Turfing Works - Various Locations |
|
|
44465 |
16/06/2025 |
Western Australian Local Government Association |
$4,684.35 |
|
|
|
Training - Rates In Local Government - Debt Collection - 1 Attendee |
|
|
|
|
Training - Introduction To Local Government Delivered On-Site |
|
|
|
|
Training - Local Government Act 1995 - Advanced - 1 Attendee |
|
|
|
|
Training - Meeting Practices For Good Governance Outcomes - 1 Attendee |
|
|
|
|
Training - Policy Development & Procedure Writing - 4 Attendees |
|
|
44466 |
16/06/2025 |
Western Irrigation Pty Ltd |
$2,818.61 |
|
|
|
Irrigation Parts Replacement List - Parks |
|
|
44467 |
16/06/2025 |
William Buck Consulting (WA) Pty Ltd |
$2,200.00 |
|
|
|
Probity Audit |
|
|
44468 |
16/06/2025 |
Work Clobber |
$1,897.10 |
|
|
|
PPE Issue - Various Employees |
|
|
44469 |
16/06/2025 |
Work Clobber |
$177.16 |
|
|
|
PPE Issue - 1 Employee |
|
|
44470 |
16/06/2025 |
Workpower Incorporated |
$8,173.06 |
|
|
|
Landscape Maintenance - Various Locations |
|
|
44471 |
16/06/2025 |
WTP Australia Pty Limited |
$2,200.00 |
|
|
|
Consultancy Services For Creche / Staff Room / Training Room Upgrades - Wanneroo Aquamotion |
|
|
44472 |
16/06/2025 |
Synergy |
$799,745.84 |
|
|
|
Power Supply Charges - Various Locations |
|
|
44473 |
16/06/2025 |
Mr B Blikman |
$437.86 |
|
|
|
Reimbursement - Hotel Accommodation On Business Trip - Ara Awards Conference & Seminar |
|
|
44474 |
16/06/2025 |
Ms K Leavesley |
$31.13 |
|
|
|
Reimbursement - CSEM Team Day |
|
|
44475 |
16/06/2025 |
Ms L Lorimer |
$23.85 |
|
|
|
Reimbursement - Express Post & Satchel to send hard copy 2023 / 2024 Annual Report to ARA Adjudicator in Queensland |
|
|
44476 |
16/06/2025 |
Ms S Eachran |
$26.00 |
|
|
|
Reimbursement - Parking Fees |
|
|
44478 |
19/06/2025 |
Borrell Rafferty Associates Pty Ltd |
$9,350.00 |
|
|
|
Preparation - Tax Depreciation Schedules - Halesworth Park |
|
|
44479 |
19/06/2025 |
Child Support Agency |
$1,359.74 |
|
|
|
Payroll Deductions |
|
|
44480 |
19/06/2025 |
Roads 2000 |
$27,680.18 |
|
|
|
Supply / Install Stone Pitching - Yellagonga Path |
|
|
44481 |
19/06/2025 |
Stiles Electrical & Communication Services Pty Ltd |
$80,072.85 |
|
|
|
Progress Claim 2 - Heath Park Floodlighting Upgrade |
|
|
44492 |
23/06/2025 |
Mr C Langsford |
$48.00 |
|
|
|
Reimbursement - Parking Fees - Seminar |
|
|
44493 |
23/06/2025 |
Ms D Barr |
$37.40 |
|
|
|
Reimbursement - Catering - Team Workshop |
|
|
44494 |
23/06/2025 |
Mr D Brett-Matthewson |
$10.10 |
|
|
|
Reimbursement - Parking Fees |
|
|
44495 |
23/06/2025 |
Ms K Davis |
$294.21 |
|
|
|
Reimbursement - Conference / Parking |
|
|
44496 |
23/06/2025 |
Ms N Jennings |
$280.50 |
|
|
|
Reimbursement - Business Trip Accommodation |
|
|
44497 |
23/06/2025 |
Ms S McEachran |
$13.00 |
|
|
|
Reimbursement - Parking Fees |
|
|
44498 |
23/06/2025 |
3Logix Pty Ltd |
$1,842.50 |
|
|
|
Waste Track Access July 25 |
|
|
44499 |
23/06/2025 |
8 Slice Productions |
$960.00 |
|
|
|
Oven Hire - Yanchep Youth Program |
|
|
44500 |
23/06/2025 |
AAAC Towing |
$1,364.00 |
|
|
|
Towing Services - Abandoned Vehicle Management |
|
|
44501 |
23/06/2025 |
AALAN Line Marking Services (WA) |
$3,234.00 |
|
|
|
Line Marking - Various Locations |
|
|
44502 |
23/06/2025 |
AARCO Environmental Solutions Pty Ltd |
$15,650.91 |
|
|
|
ACM Removal - Oldham Park |
|
|
|
|
Removal Asbestos In Soil - Mary Park Reserve |
|
|
44503 |
23/06/2025 |
AARCO Environmental Solutions Pty Ltd |
$4,164.00 |
|
|
|
Disposal Of Asbestos - Capricorn Esplanade Foreshore Reserve |
|
|
44504 |
23/06/2025 |
ABM Landscaping |
$232,879.90 |
|
|
|
Brick Work - Hepburn / Mirrabooka |
|
|
44505 |
23/06/2025 |
ABN Residential WA Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44506 |
23/06/2025 |
Action Glass & Aluminum |
$460.68 |
|
|
|
Reglazed Broken Window Panels - Ridgewood Park Clubrooms |
|
|
44507 |
23/06/2025 |
Activ Foundation Incorporated |
$18,580.10 |
|
|
|
Landscape Maintenance Works - Various Locations |
|
|
44508 |
23/06/2025 |
AE Hoskins Building Services |
$453,043.60 |
|
|
|
Ablution Facilities Installation - Two Rocks / Clarkson / Tapping - Assets |
|
|
44509 |
23/06/2025 |
Agility Executive Pty Ltd t/a Integrity Executive Recruitment |
$3,834.44 |
|
|
|
Casual Labour Services |
|
|
44510 |
23/06/2025 |
Alinta Gas |
$496.00 |
|
|
|
Gas Supply Charges |
|
|
44511 |
23/06/2025 |
Allworks (WA) Pty Ltd |
$13,620.36 |
|
|
|
Dry Hire Of Cat Posi - Trak Loader And Trailer |
|
|
|
|
Grader Operator - Lukin Drive Footpath Construction |
|
|
|
|
Loader Hire - Quinns Dog Beach |
|
|
|
|
Equipment Hire - Posi Trailer Combo-Metro - Engineering |
|
|
44512 |
23/06/2025 |
Alphazeta |
$6,655.00 |
|
|
|
Consultancy Services - Potable Water Renewal - Carramar Golf Course |
|
|
|
|
Engineering Advice - Building 3 Roof Renovation - Ashby Operations Centre |
|
|
44513 |
23/06/2025 |
Angela Houston |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44514 |
23/06/2025 |
Animal Health Solutions Pty Ltd |
$1,383.99 |
|
|
|
Supplies - Animal Care Centre |
|
|
44515 |
23/06/2025 |
Archival Survival Pty Ltd |
$1,297.21 |
|
|
|
Equipment - Wanneroo Regional Museum |
|
|
44516 |
23/06/2025 |
Armaguard |
$550.56 |
|
|
|
Cash Collection Services |
|
|
44517 |
23/06/2025 |
Artists Chronicle |
$2,210.00 |
|
|
|
Advertising Services - Cultural Development |
|
|
44518 |
23/06/2025 |
Asphaltech Pty Ltd |
$3,626.15 |
|
|
|
Supply Asphalt And Red Asphalt - Engineering Maintenance |
|
|
44519 |
23/06/2025 |
Aurora Environmental Perth |
$4,691.50 |
|
|
|
Asbestos Consultancy - Montrose Park |
|
|
44520 |
23/06/2025 |
Auscontact Association Limited |
$437.80 |
|
|
|
Awards - Aquamotion Aquatic Centre |
|
|
44521 |
23/06/2025 |
Australasian Performing Right Association |
$1,140.28 |
|
|
|
One Music License Payment 01.03 - 31.05.2025 - Kingsway |
|
|
44522 |
23/06/2025 |
Australian Airconditioning Services Pty Ltd |
$7,597.81 |
|
|
|
Airconditioning Maintenance Works - Various Locations |
|
|
44523 |
23/06/2025 |
Australian Institute of Management - Western Australia Human Resource Development Centre Limited |
$733.00 |
|
|
|
Training - How To Deliver Great Service - 1 Attendee - 03.07.2025 |
|
|
44524 |
23/06/2025 |
Australian Property Consultants |
$4,400.00 |
|
|
|
Valuations - Market Rental - Property |
|
|
44525 |
23/06/2025 |
Australian Training Management Pty Ltd |
$505.00 |
|
|
|
Training - LF Forklift HRW Licence - 1 Attendee |
|
|
44526 |
23/06/2025 |
AVCRM Products Pty Ltd |
$2,695.00 |
|
|
|
Annual Fee 2025 / 2026 |
|
|
44527 |
23/06/2025 |
Bartco Traffic Equipment Pty Ltd |
$301.40 |
|
|
|
Fire Sign - Two Rocks Road |
|
|
44528 |
23/06/2025 |
BCA Consultants (WA) Pty Ltd |
$880.00 |
|
|
|
Hydraulic / Electrical Services - Riverlinks Park - Assets |
|
|
44529 |
23/06/2025 |
Benara Nurseries, Quito Pty Ltd |
$6,383.03 |
|
|
|
Plant Supplies - Parks |
|
|
44530 |
23/06/2025 |
Bethany Hood |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44531 |
23/06/2025 |
BGC Concrete |
$1,300.20 |
|
|
|
Supply Of Concrete - Engineering |
|
|
44532 |
23/06/2025 |
Bing Technologies Pty Ltd |
$1,185.12 |
|
|
|
Postage Costs 15.05.2025 - 31.05.2025 |
|
|
44533 |
23/06/2025 |
Bladon WA Pty Ltd |
$3,011.83 |
|
|
|
Corporate Uniform Issues |
|
|
44534 |
23/06/2025 |
Blueprint Homes (WA) Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bondvc |
|
|
44535 |
23/06/2025 |
BOC Limited |
$68.69 |
|
|
|
Industrial Nitrogen & Medical Oxygen |
|
|
44536 |
23/06/2025 |
Bollig Design Group Ltd |
$10,080.00 |
|
|
|
Contract Admin - Dordaak Kepap Library |
|
|
44537 |
23/06/2025 |
Boral Construction Materials Group Ltd |
$364.98 |
|
|
|
Concrete Mix - 62 Salcott Rd |
|
|
44538 |
23/06/2025 |
BPA Consultants Pty Ltd |
$20,614.00 |
|
|
|
Roof Renovations - Ashby Operations Centre Building 3 |
|
|
|
|
BBQ Shelter Upgrade - Gumblossom Community Centre |
|
|
|
|
Roof Renewal - Lake Joondalup Pavilion |
|
|
44539 |
23/06/2025 |
Bridgestone Australia Limited |
$2,243.12 |
|
|
|
Tyre Fitting Services |
|
|
44540 |
23/06/2025 |
Bridgestone Australia Limited |
$2,330.33 |
|
|
|
Tyre Fitting Services |
|
|
44541 |
23/06/2025 |
BrightMark Group Pty Ltd |
$41,441.15 |
|
|
|
Cleaning Services - Aquamotion / Civic Centre |
|
|
44542 |
23/06/2025 |
Bruce Foord |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44543 |
23/06/2025 |
Bucher Municipal Pty Ltd |
$16,856.18 |
|
|
|
Vehicle Spare Parts / Repairs |
|
|
44544 |
23/06/2025 |
Buggybuddys |
$214.50 |
|
|
|
Noongar Songs & Stories Advert In Buggybuddys Education And Early Years Guide / Facebook Post |
|
|
44545 |
23/06/2025 |
Bunzl Limited |
$260.72 |
|
|
|
Soap Dispensers - Stores |
|
|
44546 |
23/06/2025 |
Business Foundations Ltd |
$1,100.00 |
|
|
|
10 Digital Action Plans - City Of Wanneroo Businesses |
|
|
44547 |
23/06/2025 |
Byrnes Contracting (WA) |
$28,556.00 |
|
|
|
Garden Ben Kerb Construction |
|
|
44548 |
23/06/2025 |
Cameron Van der Does t/a Cameron the Magician |
$400.00 |
|
|
|
Perform Magic Show - Beach To Bush Arts Festival Finale |
|
|
44549 |
23/06/2025 |
Cancelled |
|
|
44550 |
23/06/2025 |
Car Care Motor Company Pty Ltd |
$9,254.28 |
|
|
|
Vehicle Spare Parts / Repairs |
|
|
44551 |
23/06/2025 |
Carabiner Architects Pty Ltd |
$132,251.02 |
|
|
|
Girrawheen Hub Redevelopment Project |
|
|
44552 |
23/06/2025 |
Cat Welfare Society Incorporated |
$7,062.00 |
|
|
|
Daily Impound Fees |
|
|
44553 |
23/06/2025 |
Chubb Fire & Security Pty Ltd |
$1,262.80 |
|
|
|
Fire Extinguishers - Building Maintenance |
|
|
44554 |
23/06/2025 |
Cinnamon Creative Craft |
$966.00 |
|
|
|
Linocut Workshop And Materials - WLCC |
|
|
44555 |
23/06/2025 |
City of Joondalup |
$1,430.00 |
|
|
|
Council Membership - Plastic Free July |
|
|
44556 |
23/06/2025 |
City of Wanneroo Social Club |
$1,012.00 |
|
|
|
Refund - Transfer Quiz Night Income To The Social Club |
|
|
44557 |
23/06/2025 |
Civica Pty Ltd |
$6,875.00 |
|
|
|
Services Charge - Community Comms & Marketing Support |
|
|
44558 |
23/06/2025 |
Clark Equipment Sales Pty Ltd |
$864.18 |
|
|
|
Vehicle Spare Parts |
|
|
44559 |
23/06/2025 |
Claw Environmental |
$151.80 |
|
|
|
Polystyrene Collection - Wangara Greens Recycling Facility |
|
|
44560 |
23/06/2025 |
Clayton Utz |
$16,262.95 |
|
|
|
Legal Fees For The City |
|
|
44561 |
23/06/2025 |
Cleanaway Operations Pty Ltd |
$3,762.00 |
|
|
|
Removal & Disposal Of Waste Liquid - Fleet Workshop |
|
|
44562 |
23/06/2025 |
Clinipath Pathology |
$3,262.88 |
|
|
|
Medical Fees For The City |
|
|
44563 |
23/06/2025 |
Coca Cola Amatil Pty Ltd |
$376.40 |
|
|
|
Beverages - Kingsway Indoor Stadium |
|
|
44564 |
23/06/2025 |
Commercial Aquatics Australia |
$6,268.90 |
|
|
|
Preventative Maintenance - Aquamotion |
|
|
44565 |
23/06/2025 |
Common Ground Trails Pty Ltd |
$177,619.61 |
|
|
|
Design And Refurbishment Of BMX Track – McCoy Park |
|
|
44566 |
23/06/2025 |
Community Greenwaste Recycling Pty Ltd |
$6,261.20 |
|
|
|
Disposal Of Mixed Waste - McCoy Park BMX Track |
|
|
|
|
Tipping Of Spoils - Lukin Drive Footpath |
|
|
44567 |
23/06/2025 |
Complete Office Supplies Pty Ltd |
$1,149.31 |
|
|
|
Stationery Supplies - Various Service Units |
|
|
44568 |
23/06/2025 |
Converge International Pty Ltd |
$1,249.34 |
|
|
|
Staff Coaching & Training |
|
|
44569 |
23/06/2025 |
Corsign (WA) Pty Ltd |
$2,620.48 |
|
|
|
Remove Construction Notification Sign - Sanctuary Park |
|
|
|
|
Signs - We Are Not Weeds Please Do Not Spray Or Remove |
|
|
|
|
Street Name Plates |
|
|
44570 |
23/06/2025 |
Craneswest (WA) Pty Ltd |
$20,059.41 |
|
|
|
Debris Collection - Various Locations |
|
|
|
|
Removal Of Green Waste - Motivation Drive Site |
|
|
44571 |
23/06/2025 |
Craneswest (WA) Pty Ltd |
$174,042.65 |
|
|
|
Work Completed By Western Go Organics JV May 2025 |
|
|
44572 |
23/06/2025 |
CS Legal |
$4,112.84 |
|
|
|
Court Fees - Rating Services |
|
|
44573 |
23/06/2025 |
CTI Couriers |
$1,147.61 |
|
|
|
Courier Services |
|
|
44574 |
23/06/2025 |
Dale Alcock Homes Pty Ltd |
$8,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44575 |
23/06/2025 |
Dale Parish |
$1,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44576 |
23/06/2025 |
Data #3 Limited |
$1,625.80 |
|
|
|
Deep Freeze Enterprise Maintenance - 16.05.2025 - 15.05.2025 |
|
|
44577 |
23/06/2025 |
Data #3 Limited |
$28,494.16 |
|
|
|
CIS Suite Datacenter Core - ICT |
|
|
44578 |
23/06/2025 |
David Roy Cull |
$264.00 |
|
|
|
Pest Control Services - Playgroup Store - Elliot Park |
|
|
44579 |
23/06/2025 |
Department of Fire & Emergency Services |
$22,884.29 |
|
|
|
50% Cost Sharing For The Community Emergency Services Manager |
|
|
44580 |
23/06/2025 |
DFS Industrial & Environmental Services Pty Ltd |
$227,956.48 |
|
|
|
Drain Cleaning / Road Sweeping Services - Various Locations |
|
|
44581 |
23/06/2025 |
DMC Cleaning |
$108,854.39 |
|
|
|
Cleaning Services - Various Locations |
|
|
44582 |
23/06/2025 |
Double G (WA) Pty Ltd |
$33,680.77 |
|
|
|
Irrigation Works - Various Locations |
|
|
44583 |
23/06/2025 |
Dowsing Group Pty Ltd |
$709,805.82 |
|
|
|
Concrete Works - Various Locations |
|
|
44584 |
23/06/2025 |
Du Clene Pty Ltd |
$2,711.26 |
|
|
|
North Cleaning Consumables |
|
|
44585 |
23/06/2025 |
Eclipse Soils |
$31,941.80 |
|
|
|
Bushland Mulch Supplies - Parks |
|
|
44586 |
23/06/2025 |
Edge People Management |
$7,597.33 |
|
|
|
Provision Of Case Management Return To Work Monitoring And Job Dictionaries |
|
|
44587 |
23/06/2025 |
Educational Art Supplies |
$542.90 |
|
|
|
Art Material Supplies - Mindful Workshop |
|
|
44588 |
23/06/2025 |
Environmental Site Services |
$2,184.60 |
|
|
|
Single Event Standalone Vibration Monitoring – McCoy Park BMX Track Renewal |
|
|
44589 |
23/06/2025 |
Epic Catering & Events Services Pty Ltd |
$4,114.00 |
|
|
|
Catering - Council Dinners 10.06.2025 |
|
|
|
|
Catering - Service Review Working Group Meeting 16.06.2025 |
|
|
44590 |
23/06/2025 |
EPM Partners Pty Ltd |
$6,600.00 |
|
|
|
Subscription - Self Managed Program Level |
|
|
44591 |
23/06/2025 |
Equifax Australasia Credit Rating Pty Ltd |
$2,047.32 |
|
|
|
Standard Financial Assessments - Procurement |
|
|
44592 |
23/06/2025 |
Equifax Australasia Workforce Solutions Pty Limited |
$369.60 |
|
|
|
Australian Criminal History Checks |
|
|
44593 |
23/06/2025 |
Evoke Interior Design Pty Ltd |
$1,546.88 |
|
|
|
Modifications To Community Health Entry Area - Two Rocks Playgroup - Assets |
|
|
44594 |
23/06/2025 |
Evolve Talent Pty Ltd |
$19,111.86 |
|
|
|
Casual Labour Services |
|
|
44595 |
23/06/2025 |
Fleetspec Hire |
$6,427.51 |
|
|
|
Hire - Crew Cab Tipper Truck - Parks Operations |
|
|
44596 |
23/06/2025 |
Foxfish Pty Ltd t/as Binley Fencing |
$987.45 |
|
|
|
Temporary Fencing - Lukin Drive - Footpath Installation |
|
|
44597 |
23/06/2025 |
Frontline Fire & Rescue Equipment |
$242.34 |
|
|
|
Repairs - Two Rocks Light Tanker |
|
|
44598 |
23/06/2025 |
Fusion Applications Pty Ltd |
$5,720.00 |
|
|
|
OICS Architecture Integration - ICT |
|
|
44599 |
23/06/2025 |
Gemmill Homes Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44600 |
23/06/2025 |
Geoff's Tree Service Pty Ltd |
$113,145.22 |
|
|
|
Pruning Works - Various Locations |
|
|
44601 |
23/06/2025 |
Golddubs Enterprises Pty Ltd |
$810.00 |
|
|
|
Workshop - Cap Printing - Beach To Bush Arts Festival |
|
|
44602 |
23/06/2025 |
Halpd Pty Ltd Trading As Affordable Living Homes |
$14,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44603 |
23/06/2025 |
Hames Sharley Architects |
$4,840.00 |
|
|
|
Clarkson Train Station Precinct Walkshop |
|
|
44604 |
23/06/2025 |
Harcourts Alliance |
$12.90 |
|
|
|
Refund - Copies Of Plans - Not Available |
|
|
44605 |
23/06/2025 |
Heidelberg Materials Pty Ltd |
$947.76 |
|
|
|
Concrete Mix - 7 Parkside Street |
|
|
44606 |
23/06/2025 |
Hickey Constructions Pty Ltd |
$3,946.80 |
|
|
|
Slab Reinstatement Works - Yanchep Old Surf Club |
|
|
44607 |
23/06/2025 |
Hodge Collard Preston Unit Trust |
$2,351.25 |
|
|
|
Defects Liability Administration - Heath Park Sports Amenities Building |
|
|
44608 |
23/06/2025 |
HopgoodGanim Lawyers |
$1,485.00 |
|
|
|
Legal Fees For The City |
|
|
44609 |
23/06/2025 |
Horizon West Landscape Constructions |
$103,431.97 |
|
|
|
Upgrade - Riverlinks Park, New All-Abilities Playground |
|
|
|
|
Landscape Construction - Sanctuary Park |
|
|
44610 |
23/06/2025 |
Houspect WA |
$1,500.00 |
|
|
|
Building Inspections - Tiger Kart Club |
|
|
44611 |
23/06/2025 |
Hydroquip Pumps & Irrigation Pty Ltd |
$53,855.82 |
|
|
|
Irrigation Pump Works - Various Locations |
|
|
44612 |
23/06/2025 |
Ideal Homes Pty Ltd |
$14,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44613 |
23/06/2025 |
Imagesource Digital Solutions |
$104.50 |
|
|
|
Signage - Friday Flicks |
|
|
44614 |
23/06/2025 |
Inflatable Entertainment Perth Pty Ltd T/a Perth Bubble Soccer |
$575.00 |
|
|
|
Inflatable Soccer Field - Workshop 6 - Youth Services |
|
|
44615 |
23/06/2025 |
Inspired Development Solutions Pty Ltd |
$440.00 |
|
|
|
Executive Coaching 3 1 Hour Sessions |
|
|
44616 |
23/06/2025 |
Institute of Public Works Engineering Australasia (NSW Division) LTD |
$3,080.00 |
|
|
|
Training - Asset Management Fundamentals |
|
|
|
|
Training - Conduct Road Inspections |
|
|
|
|
Training - Managing Sealed And Unsealed Local Roads |
|
|
44617 |
23/06/2025 |
Integrity Industrial Pty Ltd |
$35,758.14 |
|
|
|
Casual Labour Services |
|
|
44618 |
23/06/2025 |
Integrity Industrial Pty Ltd |
$2,253.68 |
|
|
|
Casual Labour Services |
|
|
44619 |
23/06/2025 |
Integrity Staffing |
$13,000.84 |
|
|
|
Casual Labour Services |
|
|
44620 |
23/06/2025 |
Intelife Group |
$118,321.94 |
|
|
|
BBQ Maintenance / Vehicle Cleaning / Sandsifting /Building Cleaning & Consumables |
|
|
44621 |
23/06/2025 |
Intelife Group |
$4,424.48 |
|
|
|
Sand Top-Up - Rotary Park |
|
|
44622 |
23/06/2025 |
Interfire Agencies Pty Ltd |
$2,438.32 |
|
|
|
Equipment - Operational Requirements - Fire Services |
|
|
44623 |
23/06/2025 |
Iron Mountain Australia Group Pty Ltd |
$7,278.90 |
|
|
|
Document Management Services |
|
|
44624 |
23/06/2025 |
J Blackwood & Son Ltd |
$216.66 |
|
|
|
Respirator Kits / Screwdriver - Stores |
|
|
44625 |
23/06/2025 |
Jackson McDonald |
$32,188.20 |
|
|
|
Legal Fees For The City |
|
|
44626 |
23/06/2025 |
James Bennett Pty Ltd |
$2,178.64 |
|
|
|
Book Stock - Library Services |
|
|
44627 |
23/06/2025 |
Janali & Co Pty Ltd |
$29,106.00 |
|
|
|
Contract Expenses - Homelessness Research Project |
|
|
|
|
Contract Expenses - Evaluation Project - Community Development |
|
|
44628 |
23/06/2025 |
Janis Rudolfs Nedela |
$385.00 |
|
|
|
Assessing 5 Public Artwork By Tony Jones Held By The City Of Wanneroo |
|
|
44629 |
23/06/2025 |
Jason Cowie & Michelle Cowie |
$117.65 |
|
|
|
Refund - Building Application - Rejected |
|
|
44630 |
23/06/2025 |
Jensen Hughes Pty Ltd |
$13,530.00 |
|
|
|
Building Condition & Compliance Inspections 2024 / 2025 |
|
|
44631 |
23/06/2025 |
Jobfit Health Group Pty Ltd |
$3,627.80 |
|
|
|
Pre-Employment Medical Assessments |
|
|
44632 |
23/06/2025 |
John Papas Trailers [Aust] Pty Ltd |
$29,989.98 |
|
|
|
2 Trailers - Fleet Assets |
|
|
44633 |
23/06/2025 |
Joondalup Symphony Orchestra Inc. |
$1,738.00 |
|
|
|
Redeemed Beverage Vouchers - Beach To Bush Festival Finale |
|
|
44634 |
23/06/2025 |
Kennedys (Australasia) Partnership trading as Kennedys Law |
$2,904.00 |
|
|
|
Legal Fees For The City |
|
|
44635 |
23/06/2025 |
Kerb Direct Kerbing |
$54,253.46 |
|
|
|
Kerbing Works - Various Locations |
|
|
44636 |
23/06/2025 |
Kerb Direct Kerbing |
$3,497.93 |
|
|
|
Kerbing Works - 32 Charleston |
|
|
44637 |
23/06/2025 |
Kleenit |
$2,712.17 |
|
|
|
Graffiti Removal - Various Locations |
|
|
44638 |
23/06/2025 |
Konecranes Pty Ltd |
$2,894.10 |
|
|
|
Konecranes Service & Inspection Of Super Crane - Fleet |
|
|
44639 |
23/06/2025 |
Kuditj Pty Ltd |
$1,699.50 |
|
|
|
Catering - Morning Teas - People And Culture |
|
|
44640 |
23/06/2025 |
Landscape Elements Pty Ltd |
$77,321.43 |
|
|
|
Landscape Maintenance Works - Various Locations |
|
|
44641 |
23/06/2025 |
Landscape Elements Pty Ltd |
$28,984.04 |
|
|
|
Landscape Maintenance Works - Various Locations |
|
|
44642 |
23/06/2025 |
Larrikin House Pty Ltd |
$243.00 |
|
|
|
Library Book Stock |
|
|
44643 |
23/06/2025 |
Lee Harrington |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44644 |
23/06/2025 |
Lifeline |
$3,190.00 |
|
|
|
Training Course - Managing Challenging Interactions |
|
|
44645 |
23/06/2025 |
Lisa McQuoid |
$500.00 |
|
|
|
CCTV Rebate |
|
|
44646 |
23/06/2025 |
Living Turf |
$99,931.70 |
|
|
|
Turfing Works - Various Locations |
|
|
44647 |
23/06/2025 |
Local Government Professionals Australia WA Inc |
$2,170.00 |
|
|
|
Training - Finance For Non-Financial People - 4 Attendees |
|
|
44648 |
23/06/2025 |
Localis Technologies Australia Pty Ltd |
$548.90 |
|
|
|
Event Report - 'Ready 4 Adventure' Show |
|
|
44649 |
23/06/2025 |
Luke Schoonens |
$500.00 |
|
|
|
CCTV Rebate |
|
|
44650 |
23/06/2025 |
M Gregory Legal |
$2,226.40 |
|
|
|
Legal Fees For The City |
|
|
44651 |
23/06/2025 |
Mansour Mohseni |
$71.90 |
|
|
|
Refund - Copies Of Plans - Not Available |
|
|
44652 |
23/06/2025 |
McLeods Lawyers Pty Ltd |
$16,310.43 |
|
|
|
Legal Fees For The City |
|
|
44653 |
23/06/2025 |
Michael Page International (Australia)Pty Ltd |
$3,589.29 |
|
|
|
Casual Labour Services |
|
|
44654 |
23/06/2025 |
Michael Smith-Bingham |
$500.00 |
|
|
|
CCTV Rebate |
|
|
44655 |
23/06/2025 |
Mindarie Regional Council |
$257,057.28 |
|
|
|
Refuse Disposal Charges |
|
|
44656 |
23/06/2025 |
MNG Pty Ltd |
$44,165.00 |
|
|
|
Coastal Surveys - Northern Beaches October 2024 |
|
|
44657 |
23/06/2025 |
Momo & Co 4 Pty Ltd trading as Cabernet and Canvas |
$1,380.00 |
|
|
|
Event - Paint N Sip - Turquoise Cafe - 24.05.2025 |
|
|
44658 |
23/06/2025 |
NoiseNet Operations Pty Ltd |
$4,587.00 |
|
|
|
Hire - Smart Noise Sensor |
|
|
44659 |
23/06/2025 |
Noma Pty Ltd |
$1,402.50 |
|
|
|
Design Review Panel Meeting Attendance |
|
|
44660 |
23/06/2025 |
Office Cleaning Experts |
$101,580.77 |
|
|
|
Cleaning Services - Various Locations |
|
|
44661 |
23/06/2025 |
Omnicom Media Group Australia Pty Ltd trading as Marketforce |
$13,990.99 |
|
|
|
Advertising Services For The City |
|
|
44662 |
23/06/2025 |
On Tap Services |
$23,958.60 |
|
|
|
Plumbing Maintenance Services - Various Locations |
|
|
44663 |
23/06/2025 |
On Track Fabrication |
$4,584.80 |
|
|
|
Fabricate 4 Tyre Racks - Ashby |
|
|
44664 |
23/06/2025 |
One Tree Botanical Pty Ltd |
$18,040.00 |
|
|
|
Flora And Vegetation Survey - Hepburn Park |
|
|
44665 |
23/06/2025 |
Optima Press |
$315.70 |
|
|
|
Printing - Writing Flyers - Arts Development |
|
|
44666 |
23/06/2025 |
Oracle Corporation Australia Pty Ltd |
$229,098.01 |
|
|
|
Oracle Account Cloud Services |
|
|
44667 |
23/06/2025 |
Oswald Homes Pty Ltd t/a Residential Attitudes |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44668 |
23/06/2025 |
Paperbark Technologies Pty Ltd |
$27,525.81 |
|
|
|
Landscape Maintenance Services - Various Locations |
|
|
44669 |
23/06/2025 |
Parker Black & Forrest |
$2,178.94 |
|
|
|
Locking Services - Various Locations |
|
|
44670 |
23/06/2025 |
Parks & Leisure Australia |
$2,640.00 |
|
|
|
Registration - PLA WA Conference |
|
|
44671 |
23/06/2025 |
Paul G Uhlmann |
$255.00 |
|
|
|
Judging - 2025 Community Art Awards |
|
|
44672 |
23/06/2025 |
People with Disabilities (WA) Inc |
$1,413.50 |
|
|
|
Social Stories Development - Community Planning & Development |
|
|
44673 |
23/06/2025 |
Perth Better Homes |
$47,657.50 |
|
|
|
Removal Of Shade Sails - Various Locations |
|
|
44674 |
23/06/2025 |
Perth Heavy Tow |
$1,320.00 |
|
|
|
Towing Services - Fleet |
|
|
44675 |
23/06/2025 |
Perth Region NRM |
$4,950.00 |
|
|
|
2024 / 2025 Support For Perth NRM Coastal And Marine Program |
|
|
44676 |
23/06/2025 |
Pianos Mahachi |
$73.50 |
|
|
|
Refund - Copy Of Plans - Not Available |
|
|
44677 |
23/06/2025 |
Pineapple Fingers |
$673.75 |
|
|
|
Livestream - Beach To Bush Arts Festival Finale |
|
|
44678 |
23/06/2025 |
Place Info Pty Ltd |
$10,890.00 |
|
|
|
Place Forecast - 1 Year Subscription June 2025 / 2026 |
|
|
44679 |
23/06/2025 |
Planning Institute of Australia Limited |
$777.75 |
|
|
|
Training - Enhancing Policy Development And Report Writing With Generative Ai |
|
|
44680 |
23/06/2025 |
Powerhouse Batteries Pty Ltd |
$1,958.18 |
|
|
|
Vehicle Spare Parts |
|
|
44681 |
23/06/2025 |
Powerlyt |
$10,612.80 |
|
|
|
Design / Implementation Services - Energy Reduction At Ashby Operations Centre |
|
|
44682 |
23/06/2025 |
Prestige Alarms |
$84,406.34 |
|
|
|
Alarm / CCTV Services - Various Locations |
|
|
44683 |
23/06/2025 |
Price Consulting Group Pty Ltd |
$7,356.25 |
|
|
|
Annual CEO Performance Review |
|
|
44684 |
23/06/2025 |
Cancelled |
|
|
44685 |
23/06/2025 |
Priority Management Australia Pty Ltd |
$990.00 |
|
|
|
Training - Working Smart With Microsoft Onenote - 20.06.2025 |
|
|
44686 |
23/06/2025 |
Professional Homes Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44687 |
23/06/2025 |
Professional Search Group Pty Ltd |
$4,836.27 |
|
|
|
Casual Labour Services |
|
|
44688 |
23/06/2025 |
Programmed Skilled Workforce Limited |
$5,240.95 |
|
|
|
Casual Labour Services |
|
|
44689 |
23/06/2025 |
PS Structures Pty Ltd |
$3,289,304.58 |
|
|
|
Progress Certificate 5 - Construction Of Alkimos Aquatic & Recreation Centre |
|
|
44690 |
23/06/2025 |
Public Sector Network (Australia) Pty Ltd |
$1,094.50 |
|
|
|
Training - Rethinking EVP & Talent Management In The Government - 1 Attendee |
|
|
44691 |
23/06/2025 |
Pure Homes Pty Ltd t/a B1 Homes |
$6,000.00 |
|
|
|
Refund - Street & Verge Bonds |
|
|
44692 |
23/06/2025 |
Push My Button Australia Ltd |
$1,576.30 |
|
|
|
Subscription - HappyorNot Touch Essentials - ICT |
|
|
44693 |
23/06/2025 |
Qualcon Laboratories |
$561.00 |
|
|
|
Offshore Sand PSD Tests |
|
|
44694 |
23/06/2025 |
Quality Hydraulic Services Design |
$1,760.00 |
|
|
|
Stage 2 - Upgrade Works - Gumblossom Community Centre |
|
|
44695 |
23/06/2025 |
R1i Technology Pty Ltd |
$610,153.03 |
|
|
|
Supply / Design / Implementation / Support Of City Network - ICT |
|
|
44696 |
23/06/2025 |
RAC BusinessWise |
$216.00 |
|
|
|
Call Out Services - WN 34238 & WN 34622 |
|
|
44697 |
23/06/2025 |
Ralph Beattie Bosworth |
$3,569.50 |
|
|
|
Detailed Design Estimate - Frederick Stubbs Carpark Upgrade |
|
|
44698 |
23/06/2025 |
Reliable Fencing WA Pty Ltd |
$53,696.58 |
|
|
|
Fencing Works - Various Locations |
|
|
44699 |
23/06/2025 |
Residential Building WA Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44700 |
23/06/2025 |
Roads 2000 |
$775,841.12 |
|
|
|
Final Claim - Mirrabooka Avenue / Hepburn Avenue |
|
|
|
|
Progress Claim 1 - Mirrabooka / Montrose / Koondoola - Intersection - Pavement Widening Works With Traffic Management |
|
|
|
|
Progress Claim 2 - Butterworth Avenue - Assets |
|
|
|
|
Upgrade Road Work - Salerno Drive / Anchorage Drive North |
|
|
|
|
Final Claim - Yellagonga Path / Scenic Drive To Rotary Park |
|
|
44701 |
23/06/2025 |
Robert Walters Pty Ltd |
$5,154.78 |
|
|
|
Casual Labour Services |
|
|
44702 |
23/06/2025 |
Rogers Axle & Spring Works Pty Ltd |
$805.20 |
|
|
|
Vehicle Spare Parts |
|
|
44703 |
23/06/2025 |
Romana Investments Pty Ltd t/a Perth Hire Shop |
$14,068.08 |
|
|
|
Hire - 4.7 Tonne Roller - Lukin Drive Footpath Works |
|
|
44704 |
23/06/2025 |
Roy Gripske & Sons Pty Ltd |
$961.53 |
|
|
|
24 Ezi Reachers - Parks |
|
|
44705 |
23/06/2025 |
Safety World |
$888.25 |
|
|
|
Staff Uniforms - Waste |
|
|
44706 |
23/06/2025 |
Sanpoint Pty Ltd ATF Fiore Family Trust |
$720,320.18 |
|
|
|
Landscape Maintenance Works - Various Locations |
|
|
44707 |
23/06/2025 |
Seabreeze Landscape Supplies |
$19.00 |
|
|
|
Landscape Supplies - Parks |
|
|
44708 |
23/06/2025 |
Seek Limited |
$9,021.56 |
|
|
|
Seek Branded Ads - People & Culture |
|
|
44709 |
23/06/2025 |
Sheridan's |
$78.54 |
|
|
|
2 Councillor Name Badges - Cr J Wright & Cr B Smith |
|
|
44710 |
23/06/2025 |
Site Environmental & Remediation Services Pty Ltd |
$6,380.00 |
|
|
|
Environmental And Contamination Report - 590 Wanneroo Road |
|
|
44711 |
23/06/2025 |
SJ McKee Maintenance Pty Ltd |
$775.00 |
|
|
|
Repair Works - Various Locations - Waste |
|
|
44712 |
23/06/2025 |
Slater-Gartrell Sports |
$22,242.00 |
|
|
|
Modify All Posts - Halesworth Park |
|
|
|
|
Install 3 Synthetic Cricket Pitches - Ridgewood Park |
|
|
44713 |
23/06/2025 |
Specialist News Pty Ltd t/a Workplace Express |
$379.81 |
|
|
|
Additional Users - 3 Employees |
|
|
44714 |
23/06/2025 |
Sphere Architects |
$19,588.80 |
|
|
|
Consultancy - Clarkson Library Audit Improvements |
|
|
|
|
Contract Administration - Montrose Park Renovations |
|
|
44715 |
23/06/2025 |
SProductions |
$2,640.00 |
|
|
|
Business Support Workshop – "Reel Business Hacks" |
|
|
44716 |
23/06/2025 |
Sri Harsha Polavarapu |
$494.65 |
|
|
|
CCTV Rebate |
|
|
44717 |
23/06/2025 |
St John Ambulance Western Australia Ltd |
$1,359.05 |
|
|
|
First Aid Training / Supplies |
|
|
44718 |
23/06/2025 |
Stantec Australia Pty Ltd |
$29,895.93 |
|
|
|
Coastal Management Study - Yanchep |
|
|
44719 |
23/06/2025 |
Stewart & Heaton Clothing Company Pty Ltd |
$3,232.02 |
|
|
|
PPE Issue - Fire Services |
|
|
44720 |
23/06/2025 |
Stiles Electrical & Communication Services Pty Ltd |
$50,126.01 |
|
|
|
Progress Claim 5 - Brampton Park |
|
|
44721 |
23/06/2025 |
StrataGreen |
$104.83 |
|
|
|
Krumpholz Spading Fork - Parks |
|
|
44722 |
23/06/2025 |
Superior Nominees Pty Ltd |
$63,318.64 |
|
|
|
Playground Equipment Repairs - Various Locations |
|
|
44723 |
23/06/2025 |
Synergy |
$32,079.24 |
|
|
|
Power Supply Charges - Various Locations |
|
|
44724 |
23/06/2025 |
T-Quip |
$797.21 |
|
|
|
Vehicle Spare Parts |
|
|
44725 |
23/06/2025 |
Taldara Industries Pty Ltd |
$286.00 |
|
|
|
Double Wall Enviro Cups - Stores |
|
|
44726 |
23/06/2025 |
Tallemenco Pty Ltd t/a Water Pumping Institute |
$2,940.30 |
|
|
|
Training - Sustainable Pumping For Water & Wastewater - 2 Attendees |
|
|
44727 |
23/06/2025 |
Team Digital |
$1,750.00 |
|
|
|
Training - Premiere Pro - Essentials - 2 Attendees |
|
|
44728 |
23/06/2025 |
Team Global Express Pty Ltd |
$887.19 |
|
|
|
Courier Services |
|
|
44729 |
23/06/2025 |
Technologically Speaking |
$600.00 |
|
|
|
Workshops - Technology Education - Clarksons Library |
|
|
44730 |
23/06/2025 |
Telstra Limited |
$8,746.04 |
|
|
|
Phone Services / Fire Protection Wireless Data |
|
|
44731 |
23/06/2025 |
The Distributors Perth |
$227.35 |
|
|
|
Confectionery - Kingsway Indoor Stadium |
|
|
44732 |
23/06/2025 |
The Factory Aust. Pty Ltd |
$1,086.25 |
|
|
|
Christmas Decoration Storage - May 2025 |
|
|
44733 |
23/06/2025 |
The Hire Guys Wangara |
$4,411.00 |
|
|
|
Trailer Hire - Bulk Services |
|
|
|
|
Pump Hire - Wangara Recycling Facility |
|
|
|
|
Trailer Hire - Parks Operations |
|
|
44734 |
23/06/2025 |
The Real Estate Institute of Western Australia Inc |
$1,110.00 |
|
|
|
Training - PM Essentials - 3 Attendees |
|
|
44735 |
23/06/2025 |
The Royal Life Saving Society Australia |
$8,669.46 |
|
|
|
Operations - Water Feature Monthly Services - Kingsway / Revolution Park |
|
|
|
|
Filter Pressure Gauge Replacement - Splashpad - Kingsway |
|
|
44736 |
23/06/2025 |
The Trustee for New Dealership Trust |
$80.30 |
|
|
|
Vehicle Spare Parts |
|
|
44737 |
23/06/2025 |
The Trustee for Talis Unit Trust T/a Talis Consultants |
$128,332.61 |
|
|
|
Consultancy Fees - Neerabup Enabling Works |
|
|
|
|
Consultancy Fees - NRRP Community Recycling Centre |
|
|
|
|
Mechanical Ventilation Design And Documentation & Coordination Fee - Wangara Transfer Station |
|
|
44738 |
23/06/2025 |
The Trustee for UDLA Unit Trust |
$14,690.50 |
|
|
|
Development Of Master Plan And Cost Estimate - Peridot Park |
|
|
44739 |
23/06/2025 |
The Trustee for W & K Discretionary Trust t/a PhotoCoffee and Wiseone Technologies |
$742.50 |
|
|
|
3 Mobile Phone Photography Courses - Events |
|
|
44740 |
23/06/2025 |
Think Promotional |
$784.30 |
|
|
|
Promotional Items - Wrist Sweat Band - Kingsway |
|
|
44741 |
23/06/2025 |
Toolmart |
$2,296.99 |
|
|
|
Tools / Equipment - Workshop |
|
|
44742 |
23/06/2025 |
Toro Australia Group Sales Pty Ltd |
$305.47 |
|
|
|
Vehicle Spare Parts |
|
|
44743 |
23/06/2025 |
Torque Driving Pty Ltd |
$1,350.00 |
|
|
|
Training - Torque Driving Trailer & Load Restraints |
|
|
44744 |
23/06/2025 |
Totally Workwear Joondalup & Butler |
$134.50 |
|
|
|
PPE Issue |
|
|
44745 |
23/06/2025 |
Trailer Parts Pty Ltd |
$16.90 |
|
|
|
Vehicle Spare Parts |
|
|
44746 |
23/06/2025 |
TRDW Council Approvals |
$61.65 |
|
|
|
Refund - Building Application - Rejected |
|
|
44747 |
23/06/2025 |
Tree Planting & Watering |
$110,962.50 |
|
|
|
Watering Services - Various Locations |
|
|
44748 |
23/06/2025 |
Triton Electrical Contractors Pty Ltd |
$31,149.80 |
|
|
|
Irrigation Electrical Works - Various Locations |
|
|
44749 |
23/06/2025 |
Truck Centre WA Pty Ltd |
$8,024.04 |
|
|
|
Vehicle Spare Parts / Repairs |
|
|
44750 |
23/06/2025 |
Two Rocks Volunteer Bush Fire Brigade |
$32.95 |
|
|
|
Reimbursement - Yearly Planner |
|
|
44751 |
23/06/2025 |
Unleished Art |
$852.50 |
|
|
|
Business Wanneroo Investment Prospectus Map Design - Timezone Map & City Map |
|
|
44752 |
23/06/2025 |
WA Library Supplies |
$60.00 |
|
|
|
Young Adult Spine Labels - Library Services |
|
|
44753 |
23/06/2025 |
WA Limestone Company |
$259,385.91 |
|
|
|
Beach Sand - Ocean Drive |
|
|
|
|
Limestone Productions - Engineering |
|
|
44754 |
23/06/2025 |
Wanchai Pombua |
$985.70 |
|
|
|
Vehicle Crossing Subsidy |
|
|
44755 |
23/06/2025 |
Wanneroo Electric |
$62,514.68 |
|
|
|
Electrical Maintenance Works - Various Locations |
|
|
44756 |
23/06/2025 |
Water Corporation |
$12,229.39 |
|
|
|
Water Supply Charges - Various Locations |
|
|
44757 |
23/06/2025 |
Water Corporation |
$16,506.84 |
|
|
|
Water Supply Charges - Various Locations |
|
|
44758 |
23/06/2025 |
West Coast Bus Charters Pty Ltd |
$660.00 |
|
|
|
Transport Participants - The Clarkson Train Station Precinct Upgrade Walk Shop |
|
|
44759 |
23/06/2025 |
West Coast Turf |
$21,494.00 |
|
|
|
Turfing Works - Various Locations |
|
|
44760 |
23/06/2025 |
West to West Indigenous Corporation Pty Ltd |
$61,372.37 |
|
|
|
Progress Claim 1 - Upgrade Accessibility - Civic Centre |
|
|
44761 |
23/06/2025 |
West-Sure Group Pty Ltd |
$409.98 |
|
|
|
Cash Collection Services |
|
|
44762 |
23/06/2025 |
WestCycle Incorporated |
$6,362.40 |
|
|
|
Safe Routes To School - Yanchep Rise Primary School - May 2025 |
|
|
44763 |
23/06/2025 |
Western Australian Local Government Association |
$654.50 |
|
|
|
Training - Rates In Local Government - Debt Collection - 1 Attendee |
|
|
|
|
Training - Policy Development & Procedure Writing - 1 Attendee |
|
|
|
|
Training - Report Writing For Informed Decision Making - 1 Attendee |
|
|
44764 |
23/06/2025 |
WFS Australia Pty Limited |
$278.08 |
|
|
|
Software - Draw Down Service For EmpLive - ICT |
|
|
44765 |
23/06/2025 |
William Buck Consulting (WA) Pty Ltd |
$4,620.00 |
|
|
|
Probity Adviser - Contracts & Procurement |
|
|
44766 |
23/06/2025 |
Winc Australia Pty Limited |
$672.67 |
|
|
|
ID Cards / Holders - Asset Maintenance |
|
|
44767 |
23/06/2025 |
Work Clobber |
$1,684.23 |
|
|
|
PPE Issues - Various Employees |
|
|
44768 |
23/06/2025 |
Workpower Incorporated |
$13,345.20 |
|
|
|
Landscape Maintenance Works - Various Locations |
|
|
44769 |
23/06/2025 |
Wow Group (WA) Pty Ltd |
$2,000.00 |
|
|
|
Refund - Street & Verge Bond |
|
|
44770 |
23/06/2025 |
Yalkarang Consulting |
$330.00 |
|
|
|
Community Workshop - Early Years Children |
|
|
44771 |
23/06/2025 |
Zenith Executive Search Pty Ltd |
$2,656.50 |
|
|
|
Casual Labour Services |
|
|
44772 |
23/06/2025 |
Zipform Pty Ltd |
$3,115.75 |
|
|
|
Interim Rates Notice 2024 / 2025 |
|
|
|
|
Programming, Testing & Samples - Rates |
|
|
44773 |
26/06/2025 |
Allyda Nithasha |
$100.00 |
|
|
|
Community Art Awards 2025 ‘Youth Highly Commended’ |
|
|
44774 |
26/06/2025 |
Almond Developments Pty Ltd trading as Adrian Price Architect |
$1,050.00 |
|
|
|
Drawings & Documentation - Fleet Maintenance Workshop Toilet Renewal |
|
|
44775 |
26/06/2025 |
Anna Speirs |
$7,500.00 |
|
|
|
‘Open Award’ Community Art Awards 2025,‘Moonlight Solitude’, Painting |
|
|
44776 |
26/06/2025 |
Austraffic WA |
$15,523.20 |
|
|
|
Undertake Automatic Traffic Counts Classification - 35 Locations |
|
|
44777 |
26/06/2025 |
Charlotte Robinson |
$500.00 |
|
|
|
Highly Commended Painting Community Art Awards 2025, ‘Ely’, Photo, Painting |
|
|
44778 |
26/06/2025 |
Civica Pty Ltd |
$167,591.25 |
|
|
|
CM Select Enterprise Subscription & Content Manager Select 1 Power Named User |
|
|
44779 |
26/06/2025 |
Clinton Price |
$1,400.00 |
|
|
|
City Of Wanneroo Community Art Awards 2025 ‘Photo, Film And Digital Media Award’ |
|
|
44780 |
26/06/2025 |
David Fardoe |
$500.00 |
|
|
|
Community Art Awards 2025 ‘Works On Paper Highly Commended’ |
|
|
44781 |
26/06/2025 |
Epic Catering & Events Services Pty Ltd |
$3,025.00 |
|
|
|
Catering Services - Concept Forum & WALGA |
|
|
44782 |
26/06/2025 |
Isabella Pitt |
$500.00 |
|
|
|
Youth Award Community Art Awards 2025, ‘Me 3 Years Ago’. |
|
|
44783 |
26/06/2025 |
Jacqueline Glaser |
$100.00 |
|
|
|
‘Highly Commended Celebrating Wanneroo’ Community Art Awards 2025, ‘The Visitor’, Painting. |
|
|
44784 |
26/06/2025 |
Jeremy Blank |
$2,000.00 |
|
|
|
Best Resident Award Community Art Awards 2025, ‘Trail Walk To Yanchep’. |
|
|
44785 |
26/06/2025 |
Landgate |
$839.84 |
|
|
|
Land Enquiries For The City |
|
|
44786 |
26/06/2025 |
Laurel Holyoak |
$500.00 |
|
|
|
‘’Sculpture Highly Commended’ Community Art Awards 2025, ‘Angler Fish’ |
|
|
44787 |
26/06/2025 |
Lucy Oosterhoff |
$1,400.00 |
|
|
|
‘Painting Award’ Community Art Awards 2025, ‘The Binge’. |
|
|
44788 |
26/06/2025 |
Roads 2000 |
$116,607.02 |
|
|
|
Asphalt Path - Burt Street |
|
|
44789 |
26/06/2025 |
Truck Centre WA Pty Ltd |
$237.53 |
|
|
|
Vehicle Spare Parts |
|
|
44790 |
26/06/2025 |
Veta Holmes |
$1,000.00 |
|
|
|
Highly Commended Resident Community Art Awards 2025, ‘Urban View’. |
|
|
44791 |
27/06/2025 |
CS Legal |
$27,921.67 |
|
|
|
Court Fees - Rating Services |
|
|
44792 |
27/06/2025 |
CS Legal |
$28,876.10 |
|
|
|
Court Fees - Rating Services |
|
|
44793 |
27/06/2025 |
Acurix Networks Pty Ltd |
$11,743.81 |
|
|
|
Monitoring, Licensing, Support, Category Based Content Filtering, Premium Portaland Unlimited Downloads For The Month Of June 2025 |
|
|
44794 |
27/06/2025 |
Angela Delury |
$1,400.00 |
|
|
|
‘’Sculpture Award’ Community Art Awards 2025, ‘Toby’ |
|
|
44795 |
27/06/2025 |
Audra de Pina |
$500.00 |
|
|
|
City Of Wanneroo Community Art Awards 2025 ‘Photo, Film, Digital Media Highly Commended’ |
|
|
44796 |
27/06/2025 |
Capricorn Village Joint Venture |
$2,786,493.59 |
|
|
|
Capricorn Beach Foreshore DCP Reimbursement Claim Phase 1 |
|
|
44797 |
27/06/2025 |
Double G (WA) Pty Ltd |
$270,288.48 |
|
|
|
Installation Of Irrigation System Renewal - Ferrara Park |
|
|
44798 |
27/06/2025 |
Entire Land Care Pty Ltd |
$23,100.00 |
|
|
|
Completion Of Controlled Eco-Burning - Various Locations |
|
|
44799 |
27/06/2025 |
Hays Personnel Services |
$3,751.13 |
|
|
|
Casual Labour Services |
|
|
|
|
|
|
|
|
|
Total EFT Payments |
$30,648,213.01 |
|
|
|
|
|
|
CREDIT CARD RECONCILIATIONS |
|||
|
87 |
3/06/2025 |
CBA Corporate Card |
|
|
|
|
Vicki Coles |
|
|
87-01 |
|
01/04/2025 - City Of Perth - Auditor General Conference Perth - Parking |
$15.14 |
|
87-02 |
|
02/04/2025 - CPP Regal Place - Auditor General Conference Perth - Impact 2025 - Parking |
$16.15 |
|
87-03 |
|
10/04/2025 - ACC Australia - ACC WA In-House Counsel Day - 1 Attendee |
$824.00 |
|
87-04 |
|
14/04/2025 - Officeworks - Wireless Keyboards - 3 New Starters |
$267.00 |
|
87-05 |
|
29/04/2025 - SP City West - Parking Fees |
$25.58 |
|
87-06 |
|
30/04/2025 - CPP Terrace Road - Parking Fees |
$16.66 |
|
87-07 |
|
30/04/2025 - CPP Terrace Road - Parking Fees |
$16.66 |
|
|
|
|
|
|
|
|
Kirstie Davis |
|
|
87-08 |
|
01/04/2025 - Darwin Radio 131008 - Place Leaders Conference Darwin |
$35.28 |
|
87-09 |
|
01/04/2025 - The Precinct Tavern - Place Leaders Conference Darwin |
$54.00 |
|
87-10 |
|
01/04/2025 - Easypark - Conference Parking |
$33.44 |
|
87-11 |
|
06/04/2025 - Darwin Radio 131008 - Place Leaders Conference - April 2025 |
$38.64 |
|
87-12 |
|
06/04/2025 - Adina Darwin - Place Leaders Conference - April 2025 |
$121.44 |
|
87-13 |
|
15/04/2025 - Company Director - Australian Institute Of Company Directors |
$760.00 |
|
87-14 |
|
30/04/2025 - EDA - Economic Development Australia Webinar |
$30.00 |
|
87-15 |
|
19/04/2025 - Ampol Yanchep 55077F - Audi Loan Vehicle |
$86.34 |
|
87-16 |
|
22/04/2025 - Coles - Community And Place Workshop |
$41.25 |
|
87-17 |
|
23/04/2025 - CT Storeco - Team Workshop - Community And Place |
$91.12 |
|
87-18 |
|
23/04/2025 - CT Storeco - Team Workshop - Community And Place |
$91.12 |
|
87-19 |
|
24/04/2025 - Business News Pty Lt - Business News Event - The Future Of Health |
$275.00 |
|
|
|
|
|
|
|
|
Mark Dickson |
|
|
87-20 |
|
29/04/2025 - Planning Institute Barton - Refund |
-$175.00 |
|
87-21 |
|
29/04/2025 - Planning Institute Barton - Refund |
-$95.00 |
|
|
|
|
|
|
|
|
Noelene Jennings |
|
|
87-22 |
|
31/03/2025 - WALGA Events - Local Government Awards 2024 - 1 Councillor Attendance |
$165.00 |
|
87-23 |
|
07/04/2025 - Intuit Mailchimp - Mailchimp For Wanneroo Wrap - April 2025 |
$21.69 |
|
87-24 |
|
16/04/2025 - Moore Australia WA Pl - 2025 Financial Reporting Workshop - 2 Attendees |
$3,696.00 |
|
87-25 |
|
28/04/2025 - City of Vincent - Parking Fees |
$1.05 |
|
87-26 |
|
17/04/2025 - Dome Wanneroo Central - Beverage Refreshment - External Business Meeting |
$5.50 |
|
|
|
|
|
|
|
|
Bill Parker |
|
|
87-27 |
|
30/03/2025 - Hyatt Regency BNE OPI - Hyatt Regency Hotel DSP |
$636.02 |
|
87-28 |
|
30/03/2025 - Hyatt Regency BNE OPI - Hyatt Regency Hotel CEO |
$636.02 |
|
87-29 |
|
31/03/2025 - Storia On Queen - Dinner - CEO And DPS 31.03.2025 |
$90.54 |
|
87-30 |
|
31/03/2025 - Hyatt Regency BNE OPI - Waiting On Credit From Hotel |
$636.02 |
|
87-31 |
|
01/04/2025 - Hyatt Regency BNE OPI - Hotel Snack Fee |
$5.08 |
|
87-32 |
|
01/04/2025 - Zlr*Bdseeds - Coffee - Airport 01.04.2025 |
$21.80 |
|
87-33 |
|
01/04/2025 - Bettys Burgers Austral - Dinner - CEO And DPS 01.04.2025 |
$42.80 |
|
87-34 |
|
01/04/2025 - Hyatt Regency BNE OPI - Parking Fee |
$35.56 |
|
87-35 |
|
01/04/2025 - Sq *The Wedge Cafe - Breakfast 02.04.2025 |
$53.72 |
|
87-36 |
|
01/04/2025 - Citadines On Bourke - DPS |
$593.65 |
|
87-37 |
|
01/04/2025 - Citadines On Bourke - CEO |
$593.65 |
|
87-38 |
|
02/04/2025 - Hertzgroup Australia - Rental Car |
$400.44 |
|
87-39 |
|
02/04/2025 - Zlr*Chin Chin Melbourn - Dinner - CEO And DPS 02.04.2025 |
$98.88 |
|
87-40 |
|
03/04/2025 - Sq *Little Lanterns - Lunch - CEO And DPS 03.04.2025 |
$88.35 |
|
87-41 |
|
03/04/2025 - Ampol Narre War 37350F - Fuel - Rental Car |
$13.54 |
|
87-42 |
|
03/04/2025 - Bunjil Place Pos - Breakfast - CEO And DPS 03.04.2025 |
$30.70 |
|
87-43 |
|
03/04/2025 - Hella Good Emporium - Dinner - CEO And DPS 03.04.2025 |
$42.12 |
|
87-44 |
|
04/04/2025 - Zlr*Melt1A Veneziano - Breakfast - CEO And DPS 04.04.2025 |
$41.58 |
|
87-45 |
|
06/04/2025 - Linkt Sydney - Toll - Hire Car |
$13.70 |
|
87-46 |
|
09/04/2025 - Linkt Sydney - Toll - Hire Car |
$10.40 |
|
|
|
|
|
|
|
|
Harminder Singh |
|
|
87-47 |
|
03/04/2025 - Waste Management - Annual Membership |
$2,748.26 |
|
87-48 |
|
08/04/2025 - Main Roads WA Don Aitk - Safety Engineering Course - ICW Civil Designer |
$495.00 |
|
87-49 |
|
17/04/2025 - DWER - Water - Clearing B-Point |
$400.00 |
|
87-50 |
|
17/04/2025 - SP A Mano Florals - Flowers - Family Of Brett Neely |
$184.00 |
|
87-51 |
|
22/04/2025 - Western Power - Neerabup RRP |
$498.91 |
|
|
|
|
|
|
|
|
Total - CBA |
$14,868.80 |
|
|
|
|
|
|
88 |
3/06/2025 |
NAB Corporate Card |
|
|
|
|
Advocacy & Economic Development |
|
|
88-01 |
|
02/04/2025 - Do Gooder Subscription - 2025 Election Advocacy Campaign |
$286.12 |
|
88-02 |
|
16/04/2025 - Facebk *Etawcp4Gj2 - Business Survey Sponsored Post |
$77.00 |
|
88-03 |
|
18/04/2025 - Facebk *Lbm3Xpgfj2 - Business Survey Sponsored Post |
$77.00 |
|
88-04 |
|
19/04/2025 - Facebk *Xbta4Pyfj2 - Business Survey Sponsored Post |
$85.00 |
|
88-05 |
|
21/04/2025 - Facebk *U5U64Qgfj2 - Business Survey Sponsored Post |
$55.19 |
|
88-06 |
|
25/04/2025 - Facebk *7Y229Pcfj2 - Business Survey Sponsored Post |
$104.00 |
|
88-07 |
|
25/04/2025 - Localis.Co - Localis Membership April 2025 |
$163.90 |
|
88-08 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-09 |
|
22/04/2025 - Facebk *Qhy77Qgfj2 - Business Survey Sponsored Post |
$94.00 |
|
88-10 |
|
22/04/2025 - Coles - Ecu Delegates Bus Tour - Catering |
$11.20 |
|
88-11 |
|
01/05/2025 - Eb *Connecting The Tou - Facet - Connecting The Tourism Industry With Local Government And Business Forum |
$173.00 |
|
|
|
|
|
|
|
|
Building Maintenance |
|
|
88-12 |
|
04/04/2025 - Bunnings - Toilet Seats / Cloths - Maintenance Community Buildings |
$52.41 |
|
88-13 |
|
09/04/2025 - Bunnings - Mouldings / Screws - Maintenance Community Buildings |
$98.05 |
|
88-14 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-15 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-16 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-17 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-18 |
|
29/04/2025 - Bunnings - Flush Door - Maintenance Community Buildings |
$83.49 |
|
88-19 |
|
29/04/2025 - Bunnings - Colour Bond Roofing - Maintenance Community Buildings |
$358.46 |
|
88-20 |
|
31/03/2025 - Bunnings - Hoseclamps / Scrappers / Cabinet - Maintenance Community Buildings |
$323.03 |
|
88-21 |
|
01/04/2025 - Bunnings - Cord - Maintenance Community Buildings |
$19.00 |
|
88-22 |
|
02/04/2025 - Bunnings - Pliers - Maintenance Community Buildings |
$14.23 |
|
88-23 |
|
02/04/2025 - The Hire Guys Wangar - Hire Of Cherry Picker - Maintenance Community Buildings |
$330.00 |
|
88-24 |
|
04/04/2025 - Bunnings - PVC / Solvent - Maintenance Community Buildings |
$30.38 |
|
88-25 |
|
08/04/2025 - Bunnings - Indoor Blinds / Cloths / Toilet Seat - Maintenance Community Buildings |
$188.92 |
|
88-26 |
|
11/04/2025 - Bunnings - Door Vents - Maintenance Community Buildings |
$212.95 |
|
88-27 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-28 |
|
28/04/2025 - Bunnings - Duct Tape / Silicone / Gap Filler - Maintenance Community Buildings |
$45.33 |
|
88-29 |
|
29/04/2025 - Bunnings - Drill Jobber - Maintenance Community Buildings |
$12.72 |
|
88-30 |
|
29/04/2025 - Bunnings - Bolts & Nuts / Shelf Sup - Maintenance Community Buildings |
$22.79 |
|
88-31 |
|
31/03/2025 - Valspar Mindarie - Paint - Maintenance Community Buildings |
$124.63 |
|
88-32 |
|
02/04/2025 - Valspar Mindarie - Paint - Maintenance Corporate Buildings |
$143.54 |
|
88-33 |
|
04/04/2025 - Bunnings - Gap Filler / Painters Tape / Masking Tape / Acetone - Painters Maintenance Corporate Buildings |
$79.97 |
|
88-34 |
|
04/04/2025 - Valspar Mindarie - Paint - Painters Maintenance Community Buildings |
$182.71 |
|
88-35 |
|
08/04/2025 - Bunnings - Paint / Solvent / Paint Brushes / Tape - Painters Maintenance Corporate Buildings |
$132.38 |
|
88-36 |
|
09/04/2025 - Bunnings - Paint - Painters Maintenance Corporate Buildings |
$38.95 |
|
88-37 |
|
11/04/2025 - Lindan Pty Ltd - PPE - Shoes / Shorts / Pullover - Maintenance |
$400.08 |
|
88-38 |
|
14/04/2025 - Valspar Mindarie - Paint - Painters Maintenance Corporate Buildings |
$43.57 |
|
88-39 |
|
16/04/2025 - Valspar Mindarie - Paint - Maintenance Community Buildings |
$83.58 |
|
88-40 |
|
29/04/2025 - Valspar Mindarie - Paint -Maintenance Corporate Buildings |
$109.65 |
|
88-41 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-42 |
|
29/04/2025 - Bunnings - Paint / Roller / Additive / Brush - Maintenance Corporate Buildings |
$281.10 |
|
88-43 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-44 |
|
11/04/2025 - Bunnings - Drill Bits / Screws / Security Locks - Maintenance Community Buildings |
$52.57 |
|
88-45 |
|
15/04/2025 - Bunnings - Blades / PVC Pipes / PVC Tees - Maintenance Community Buildings |
$35.48 |
|
88-46 |
|
22/04/2025 - Bunnings - Credit - Silicone - Maintenance Community Buildings |
-$13.98 |
|
88-47 |
|
22/04/2025 - Bunnings - Silicone - Maintenance Community Buildings |
$13.98 |
|
88-48 |
|
22/04/2025 - Bunnings - Indicator Bolts - Maintenance Community Buildings |
$18.82 |
|
88-49 |
|
22/04/2025 - Bunnings - Indicator Bolts - Maintenance Community Buildings |
$48.21 |
|
88-50 |
|
22/04/2025 - Bunnings - Silicone - Maintenance Community Buildings |
$12.78 |
|
88-51 |
|
23/04/2025 - Barnetts Archite H - Primary Lock - Maintenance Community Buildings |
$276.61 |
|
88-52 |
|
23/04/2025 - Bunnings - Dressed Pine - Maintenance Community Buildings |
$13.61 |
|
88-53 |
|
23/04/2025 - Bunnings - Flush Door - Maintenance Community Buildings |
$137.91 |
|
88-54 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-55 |
|
29/04/2025 - Lindan Pty Ltd - Custom Signage - Maintenance Community Buildings |
$96.80 |
|
88-56 |
|
29/04/2025 - Bunnings - Screws / Alum Tee Section - Maintenance Community Buildings |
$66.13 |
|
88-57 |
|
01/04/2025 - Bunnings - Spray Paint / Paint / Masking Tape / Roller Covers - Maintenance Community Buildings |
$568.26 |
|
88-58 |
|
04/04/2025 - Lindan Pty Ltd - PPE - Max Monet - Shorts /Shirts / Cap - Maintenance |
$420.31 |
|
88-59 |
|
10/04/2025 - Bunnings - Paint / Paint Brushes - Graffiti - Maintenance Community Buildings |
$174.01 |
|
88-60 |
|
15/04/2025 - Bunnings - Paint - Maintenance Community Buildings |
$222.11 |
|
88-61 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-62 |
|
01/04/2025 - Valspar Joondalup - Paint / Paint Remover - Maintenance Community Buildings |
$174.21 |
|
88-63 |
|
07/04/2025 - Valspar Joondalup - Paint / Brushes - Maintenance Community Buildings |
$89.84 |
|
88-64 |
|
08/04/2025 - Valspar Joondalup - Paint - Maintenance Community Buildings |
$82.18 |
|
88-65 |
|
11/04/2025 - Pattos Paint Shop - Paint - Maintenance Community Buildings |
$308.84 |
|
88-66 |
|
11/04/2025 - Valspar Joondalup - Paint - Maintenance Community Buildings |
$82.18 |
|
88-67 |
|
16/04/2025 - Pattos Paint Shop - Credit Of Overcharge On Paint - Maintenance Community Buildings |
-$286.84 |
|
88-68 |
|
16/04/2025 - Pattos Paint Shop - Paint - Maintenance Community Buildings |
$186.69 |
|
88-69 |
|
16/04/2025 - Pattos Paint Shop - Paint - Maintenance Community Buildings |
$186.69 |
|
88-70 |
|
22/04/2025 - Valspar Joondalup - Paint - Maintenance Community Buildings |
$185.82 |
|
88-71 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-72 |
|
31/03/2025 - Bunnings - Fastener - Maintenance Community Buildings |
$20.20 |
|
88-73 |
|
01/04/2025 - Bunnings - Bolts & Nuts / Lock - Maintenance Community Buildings |
$35.07 |
|
88-74 |
|
09/04/2025 - Bunnings - Holesaws / Galvabond Sheet - Maintenance Community Buildings |
$75.89 |
|
88-75 |
|
10/04/2025 - Ampelite Australia P/L - Webglass - Maintenance Community Buildings |
$1,062.60 |
|
88-76 |
|
15/04/2025 - Bunnings - Locks / Caulking Gun / Plastic Film - Maintenance Community Buildings |
$91.32 |
|
88-77 |
|
16/04/2025 - Bunnings - Weatherproof Tape - Maintenance Community Buildings |
$86.89 |
|
88-78 |
|
16/04/2025 - Sas Locksmithing - Cyberlocks - Maintenance Community Buildings |
$81.74 |
|
88-79 |
|
22/04/2025 - Bunnings - Bolts & Nuts - Maintenance Community Buildings |
$2.98 |
|
88-80 |
|
23/04/2025 - Barnetts Archite H - Door Furniture - Maintenance Community Buildings |
$423.71 |
|
88-81 |
|
24/04/2025 - Bunnings - Bolts & Nuts / Drill Bits - Maintenance Community Buildings |
$53.37 |
|
88-82 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-83 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-84 |
|
01/04/2025 - Bunnings - Screws - Maintenance Community Buildings |
$47.83 |
|
88-85 |
|
01/04/2025 - Bunnings - Rubbish Bin - Maintenance Community Buildings |
$65.97 |
|
88-86 |
|
02/04/2025 - Bunnings - Silicone / Powergrip - Maintenance Corporate Buildings |
$53.52 |
|
88-87 |
|
02/04/2025 - Bunnings - Adhesive Contact - Maintenance Corporate Buildings |
$29.86 |
|
88-88 |
|
03/04/2025 - Bunnings - Plywood / Screws - Maintenance Corporate Buildings |
$354.95 |
|
88-89 |
|
08/04/2025 - Csr Building Product - Manhole Frame - Maintenance Corporate Buildings |
$454.50 |
|
88-90 |
|
08/04/2025 - Bunnings - Screws - Maintenance Corporate Buildings |
$11.34 |
|
88-91 |
|
08/04/2025 - Bunnings - Drill Bits / Screws - Maintenance Corporate Buildings |
$33.19 |
|
88-92 |
|
09/04/2025 - Bunnings - Insulation Tape - Maintenance Corporate Buildings |
$31.19 |
|
88-93 |
|
10/04/2025 - Barnetts Archite H - Door Furniture - Maintenance Community Buildings |
$148.34 |
|
88-94 |
|
10/04/2025 - Bunnings - Silicone / Paint Brushes - Maintenance Corporate Buildings |
$29.54 |
|
88-95 |
|
11/04/2025 - Bunnings - Swageless Term Taskmasters - Maintenance Community Buildings |
$15.42 |
|
88-96 |
|
14/04/2025 - Bunnings - Moulding / Nuts & Bolts / Washers - Maintenance Community Buildings |
$35.32 |
|
88-97 |
|
14/04/2025 - Bunnings - Bolts & Nuts - Maintenance Community Buildings |
$8.10 |
|
88-98 |
|
15/04/2025 - Bunnings - Pine - Maintenance Community Buildings |
$16.71 |
|
88-99 |
|
15/04/2025 - Bunnings - Gate Latch - Maintenance Community Buildings |
$19.42 |
|
88-100 |
|
16/04/2025 - Bunnings - Hinge - Maintenance Community Buildings |
$77.20 |
|
88-101 |
|
17/04/2025 - Bunnings - Plywood / Drill Bits / Ramset Pack - Maintenance Community Centre |
$211.00 |
|
88-102 |
|
17/04/2025 - Bunnings - Rubbish Bin - Maintenance Community Centre |
$109.95 |
|
88-103 |
|
23/04/2025 - Bunnings - Rubbish Bins - Maintenance Community Centre |
$45.96 |
|
88-104 |
|
23/04/2025 - Bunnings - Tidy Lift Bin - Maintenance Community Centre |
$20.00 |
|
88-105 |
|
24/04/2025 - Bunnings - Plastic Bucket - Maintenance Community Centre |
$5.94 |
|
88-106 |
|
24/04/2025 - Bunnings - Air Freshener - Maintenance Community Centre |
$9.92 |
|
88-107 |
|
29/04/2025 - Officeworks - Signage Clips - Maintenance Corporate Buildings |
$9.98 |
|
88-108 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-109 |
|
29/04/2025 - Barnetts Archite H - Door Furniture - Maintenance Community Buildings |
$400.44 |
|
88-110 |
|
30/04/2025 - Ajar Enterprises Pty - Foam - Maintenance Corporate Buildings |
$40.50 |
|
88-111 |
|
29/04/2025 - Bunnings - Drill Jobber / Screws - Maintenance Corporate Buildings |
$15.64 |
|
|
|
|
|
|
|
|
Chief Bush Fire Control Officer |
|
|
88-112 |
|
08/04/2025 - Bunnings - Various Tools - Stanley Set / Drill Bit / Rivet Gun / Rivets And Washers |
$95.97 |
|
88-113 |
|
08/04/2025 - Shire Of Gingin - Change Plates - Fire Vehicles |
$38.80 |
|
88-114 |
|
08/04/2025 - Bp Exp Merriwa - Fuel |
$63.44 |
|
88-115 |
|
10/04/2025 - Super Cheap Auto - Various Items - Cleaning Fire Trucks / Tape Measure |
$212.94 |
|
88-116 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Coastal Maintenance |
|
|
88-117 |
|
03/04/2025 - Bunnings - Coastal Monitoring Camera Parts - Maintenance |
$56.23 |
|
88-118 |
|
03/04/2025 - Jaycar Clarkson - Coastal Monitoring Camera Parts - Maintenance |
$11.90 |
|
88-119 |
|
03/04/2025 - Jaycar Clarkson - Coastal Monitoring Camera Parts - Maintenance |
$39.90 |
|
88-120 |
|
29/04/2025 - Annual Fee - Monthly Nab Purchasing Card Fee |
$5.00 |
|
|
|
|
|
|
|
|
Community & Place - Events |
|
|
88-121 |
|
25/04/2025 - Canva* I04497-15207102 - Interactive App - Events |
$20.00 |
|
88-122 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-123 |
|
02/04/2025 - House Of Hobby - Sip And Paint Event - The Beach To Bush Arts Festival |
$300.00 |
|
88-124 |
|
04/04/2025 - Bunnings Group Ltd - Storage Equipment - Events |
$166.80 |
|
88-125 |
|
04/04/2025 - Officeworks - Materials - Civic Events |
$125.14 |
|
88-126 |
|
04/04/2025 - Mobile Skips - Skip Bin Hire |
$410.00 |
|
88-127 |
|
07/04/2025 - Sp Luna Events - Materials - Civic Events |
$1,207.10 |
|
88-128 |
|
07/04/2025 - Coles - Events Materials |
$34.50 |
|
88-129 |
|
07/04/2025 - Aussie Soap Supplies - Workshops - Girrawheen Hub - Beach To Bush Arts Festival |
$400.39 |
|
88-130 |
|
15/04/2025 - Paypal - Kids Entertainment - Clarkson Fun Fest |
$337.26 |
|
88-131 |
|
17/04/2025 - Smp*Dry Cleaning Laund - Cleaning Of Chair Covers |
$76.24 |
|
88-132 |
|
29/04/2025 - Annual Fee - Credit Card Fee |
$5.00 |
|
|
|
|
|
|
|
|
Community & Place - Place Management |
|
|
88-133 |
|
05/04/2025 - Darwin Radio 131008 - Taxi - Hotel To Conference |
$42.21 |
|
88-134 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Community Development |
|
|
88-135 |
|
26/04/2025 - Woolworths Online - Catering Items - Dordaak Kepup Film Day |
$54.80 |
|
88-136 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Community History |
|
|
88-137 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Community Safety & Emergency Management |
|
|
88-138 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-139 |
|
26/04/2025 - Reconyx - Covert Sims |
$15.93 |
|
88-140 |
|
29/04/2025 - Annual Fee - Credit Card Fee |
$5.00 |
|
|
|
|
|
|
|
|
Construction Team |
|
|
88-141 |
|
03/04/2025 - Bunnings - Reticulation - Gully Units - Mindarie Drive |
$6.05 |
|
88-142 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Corporate Strategy & Performance |
|
|
88-143 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Council & Corporate Support - Hospitality |
|
|
88-144 |
|
07/04/2025 - Smp*Wanneroo Fresh - In House Hospitality - Mayor & CEO With WALGA President & CEO / Valuable Award - Project Officers / People & Culture Recruitment Team And Briefing |
$16.18 |
|
88-145 |
|
07/04/2025 - Coles - In House Hospitality - Mayor & CEO With WALGA President & CEO / Valuable Award - Project Officers / People & Culture Recruitment Team And Briefing |
$37.05 |
|
88-146 |
|
07/04/2025 - Coles - In House Hospitality - Mayor & CEO With WALGA President & CEO / Valuable Award - Project Officers / People & Culture Recruitment Team And Briefing |
$19.50 |
|
88-147 |
|
08/04/2025 - Coles - Catering Items - Various Functions And Events |
$222.54 |
|
88-148 |
|
11/04/2025 - Coles - In House Hospitality - Breakfast - Waste |
$146.50 |
|
88-149 |
|
11/04/2025 - Wanneroo Fresh - In House Hospitality - Breakfast - Waste |
$85.50 |
|
88-150 |
|
14/04/2025 - Wanneroo Fresh - In House Hospitality - Valuable Reward / Employee Retirement / Breakfast - Waste / Concept Forum |
$51.63 |
|
88-151 |
|
14/04/2025 - Coles - In House Hospitality - Valuable Reward / Employee Retirement / Concept Forum |
$192.83 |
|
88-152 |
|
14/04/2025 - Aldi Stores - Catering Items - Various Functions And Events |
$129.16 |
|
88-153 |
|
14/04/2025 - Wanneroo Fresh - In House Hospitality - Breakfast - Waste |
$55.87 |
|
88-154 |
|
14/04/2025 - Coles - In House Hospitality - Breakfast - Waste |
$13.91 |
|
88-155 |
|
16/04/2025 - Coles - In House Hospitality - Breakfast - Waste |
$51.00 |
|
88-156 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-157 |
|
29/04/2025 - TCS Wanneroo - In House Hospitality Requests - Concept Forum |
$38.95 |
|
88-158 |
|
29/04/2025 - Coles - In House Hospitality Requests - Concept Forum / Strategic Decision-Making Training / Community Safety Working Group / Fire Warden Training |
$91.95 |
|
88-159 |
|
29/04/2025 - Smp*Wanneroo Fresh - In House Hospitality - Strategic Decision Making Training / Community Safety Working Group / Fire Warden Training |
$42.51 |
|
88-160 |
|
30/04/2025 - Coles - In House Hospitality - Strategic Decision Making Training / Community Safety Working Group / Fire Warden Training |
$83.60 |
|
88-161 |
|
30/04/2025 - Smp*Wanneroo Fresh - In House Hospitality - Strategic Decision Making Training / Community Safety Working Group / Fire Warden Training |
$8.11 |
|
88-162 |
|
30/04/2025 - Smp*Wanneroo Fresh - In House Hospitality - Strategic Decision Making Training / Community Safety Working Group / Fire Warden Training |
$23.91 |
|
88-163 |
|
31/03/2025 - Coles - In House Catering Requests - Mental Health Meeting / The Dining Room / Special Audit & Risk Meeting |
$184.98 |
|
88-164 |
|
31/03/2025 - Coles - In House Catering Requests - Mental Health Meeting |
$36.00 |
|
88-165 |
|
31/03/2025 - Liquorland - In House Catering Requests - The Dining Room |
$78.00 |
|
88-166 |
|
31/03/2025 - Coles - In House Catering Requests - The Dining Room |
$84.80 |
|
88-167 |
|
31/03/2025 - Wanneroo Fresh - In House Catering Requests - Ashby Mental Health Meeting |
$87.91 |
|
88-168 |
|
01/04/2025 - Coles - In House Catering Requests - Nomuc Forum / Council Forum |
$58.00 |
|
88-169 |
|
01/04/2025 - Tcs Wanneroo - In House Catering Requests - Council Forum |
$36.95 |
|
88-170 |
|
01/04/2025 - Smp*Wanneroo Fresh - In House Catering Requests - Nomuc Meeting / Council Forum |
$29.87 |
|
88-171 |
|
04/04/2025 - Kmart - In House Catering Requests - Staff Sausage Sizzle |
$78.00 |
|
88-172 |
|
04/04/2025 - Coles - In House Catering Requests - Staff Sausage Sizzle |
$98.00 |
|
88-173 |
|
09/04/2025 - Liquorland - In House Catering Requests - The Sausage Sizzle |
$55.92 |
|
88-174 |
|
09/04/2025 - Wanneroo Fresh - In House Catering Requests - The Sausage Sizzle |
$50.00 |
|
88-175 |
|
09/04/2025 - Coles - In House Catering Requests - The Sausage Sizzle |
$243.80 |
|
88-176 |
|
10/04/2025 - Coles - In House Catering Requests - The Sausage Sizzle |
$45.00 |
|
88-177 |
|
22/04/2025 - Coles - In House Catering Requests - Youth Services Team Meeting / Council Forum |
$74.30 |
|
88-178 |
|
22/04/2025 - Smp*Wanneroo Fresh - In House Catering Requests - Youth Services Team Meeting |
$41.63 |
|
88-179 |
|
23/04/2025 - Coles - In House Catering Requests - Youth Services Meeting |
$3.70 |
|
88-180 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Curatorial Services |
|
|
88-181 |
|
02/04/2025 - Coles - Cleaning Wipes |
$17.80 |
|
88-182 |
|
28/04/2025 - Pro Sub Fee - Eventbrite Monthly Subscription |
$15.00 |
|
88-183 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Customer & Information Services |
|
|
88-184 |
|
03/04/2025 - Telrex - 20 Avaya 9608 IP Desk Phones Refurbished. |
$1,100.00 |
|
88-185 |
|
14/04/2025 - Eb *2025 Contact Centr - Eventbrite - Best Practice Report Key Findings Presentation - 1 Attendee |
$68.35 |
|
88-186 |
|
22/04/2025 - Newdomain.* Entral - W - Webcentral Domain Renewal - cityofwanneroo.au. |
$59.90 |
|
88-187 |
|
22/04/2025 - Newdomain.* Entral - W - Webcentral Domain Renewal - wannerooshire.au |
$59.90 |
|
88-188 |
|
22/04/2025 - Newdomain.* Entral - W - Webcentral Domain Renewal - wanneroocouncil.au |
$59.90 |
|
88-189 |
|
22/04/2025 - Newdomain.* Entral - W - Webcentral Domain Renewal - shireofwanneroo.au. |
$59.90 |
|
88-190 |
|
28/04/2025 - Qa Supplies - Sticker Supplies - Apply To Assets |
$143.00 |
|
88-191 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-192 |
|
01/05/2025 - ACMA - Licence - Fixed Point To Point - Depot |
$162.00 |
|
88-193 |
|
31/03/2025 - Gethomesafe - Subscription - Safety & Compliance |
$831.60 |
|
88-194 |
|
31/03/2025 - Paypal - Charge Name - Zoom Workplace Business Monthly |
$340.89 |
|
88-195 |
|
02/04/2025 - Rezdy - Accelerate Plan |
$163.10 |
|
88-196 |
|
02/04/2025 - Google Cloud Nrlljt - April 2025 Fee |
$255.76 |
|
88-197 |
|
19/04/2025 - Paypal - Yumpu Subscription Paypal Adfree |
$40.92 |
|
88-198 |
|
19/04/2025 - Paypal - Zoom Workplace Promonthly |
$49.26 |
|
88-199 |
|
24/04/2025 - Freshworks Inc - Pro Monthly Subscription |
$1,328.00 |
|
88-200 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-201 |
|
30/04/2025 - Typeform, S.L. - Subscription |
$93.49 |
|
88-202 |
|
30/04/2025 - Gethomesafe - Get Home Safe Subscription |
$831.60 |
|
88-203 |
|
30/04/2025 - Paypal - Zoom Workplace Business Monthly |
$340.89 |
|
88-204 |
|
01/05/2025 - Campaignmonitor - Campaign Monitor Subscription |
$1,534.20 |
|
|
|
|
|
|
|
|
Engineering Maintenance |
|
|
88-205 |
|
31/03/2025 - Bunnings - Fencing Bar - Maintenance 03 / Bolts - Sign Installation And Shade Cloth And Ties - Temporary Fence Around Clarkson Library Entrance |
$346.13 |
|
88-206 |
|
02/04/2025 - Bunnings - Rapid Set Concrete - Maintenance 06 / Fence Brackets - Fence Installation At Gunsan Mews |
$164.50 |
|
88-207 |
|
03/04/2025 - Bunnings - Hoses And Bucket - Maintenance 11 Grinding Operations / Cleaner And Squeegee - Maintenance |
$143.43 |
|
88-208 |
|
04/04/2025 - Bunnings - Charging Cable / Adapter And Sprayer Bottle - Maintenance 08 |
$42.73 |
|
88-209 |
|
11/04/2025 - Bunnings - Bolts - Maintenance 06 Gate Installation At Sump |
$23.55 |
|
88-210 |
|
14/04/2025 - Bunnings - Charging Cables - Mobile Tablets |
$29.97 |
|
88-211 |
|
16/04/2025 - Bp Clarkson - Unleaded Fuel - Concrete Grinder 94105 |
$37.56 |
|
88-212 |
|
17/04/2025 - Bunnings - Hand Tools - Maintenance 14 |
$99.91 |
|
88-213 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-214 |
|
01/05/2025 - Sydney Tools Pty Ltd - Hand Tools - Maintenance 04 |
$67.09 |
|
88-215 |
|
01/05/2025 - The Rigging Shed - Slings - Beach Mats |
$103.40 |
|
88-216 |
|
01/04/2025 - JB Hi Fi Joondalup H - Charging Cords / Tablets / Ear Phones - Online Courses |
$114.07 |
|
88-217 |
|
07/04/2025 - Bunnings - Rivet Gun And Rivets / Glasses - Maintenance Crew |
$257.76 |
|
88-218 |
|
10/04/2025 - Bunnings - Locks / Latches - M9 Toolbox |
$172.45 |
|
88-219 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-220 |
|
29/04/2025 - Totally Workwear Butle - PPE Issue |
$395.70 |
|
88-221 |
|
29/04/2025 - Totally Workwear Butle - PPE Issue |
$812.10 |
|
88-222 |
|
29/04/2025 - Totally Workwear Butle - PPE Issue |
$562.10 |
|
88-223 |
|
01/05/2025 - Sydney Tools Pty Ltd - Socket Adapters - Sign Truck For Installing Signs |
$43.80 |
|
|
|
|
|
|
|
|
Fleet Maintenance |
|
|
88-224 |
|
14/04/2025 - Aaron And Amanda Dwyer Tr - Spare Keys - CCTV Trailer |
$35.20 |
|
88-225 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-226 |
|
30/04/2025 - Martins Trlr Parts - Coupling - Trailer |
$185.01 |
|
88-227 |
|
01/04/2025 - Morley Mower/1/26 Rudloc - Scabbards |
$36.96 |
|
88-228 |
|
01/04/2025 - Lukelizo Pty Ltd - Pick Up Bodies / Guide Bar / Air Filter |
$168.65 |
|
88-229 |
|
01/04/2025 - Morley Mower/1/26 Rudloc - Bickle BR700 / Lap Belt / Set Of Pick Up Bodies |
$257.13 |
|
88-230 |
|
01/04/2025 - Pumps Australia Pty - P/Guage SS / Filter Clear / Turbovortex |
$580.80 |
|
88-231 |
|
08/04/2025 - Lukelizo Pty Ltd - Clutch / Chain Sprocket / Needle Cage |
$146.55 |
|
88-232 |
|
08/04/2025 - Lukelizo Pty Ltd - Oil Pump / Gasket / Bumper Strip / Chain Sprocket / Carrying Ring |
$317.90 |
|
88-233 |
|
11/04/2025 - Midalia Steel Pty Lt - Square Edge Flats / Steel Angle |
$108.19 |
|
88-234 |
|
15/04/2025 - Tt Joondalup Pl - Tap Hand / Bottom Sutton |
$35.20 |
|
88-235 |
|
16/04/2025 - Veale Auto Parts - Electrical Split Tubing / Silicon Sealant |
$47.80 |
|
88-236 |
|
16/04/2025 - Statewide Bearings - Air Bag Charge |
$27.50 |
|
88-237 |
|
22/04/2025 - United Fasteners WA - Nuts / Bolts / Washers |
$107.27 |
|
88-238 |
|
23/04/2025 - Gentronics - Wire Mild Steel / C/Tip M8-10-0.9 |
$110.00 |
|
88-239 |
|
29/04/2025 - Annual Fee - Monthly Card Fee |
$5.00 |
|
88-240 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
|
|
88-241 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-242 |
|
03/04/2025 - Automotive Brands Gr - Head Light Restoration Kits |
$144.96 |
|
88-243 |
|
07/04/2025 - 4Wd Supacentre - Wireless Winch Remote |
$49.95 |
|
88-244 |
|
07/04/2025 - Truckline Wangara -Valve / Hub Cap / PCD Bolt / Gasket Hub Cap |
$373.71 |
|
88-245 |
|
09/04/2025 - Martins Trlr Parts - 6 Inch Jockey Wheel / Swivel Alko 8 Hole |
$108.41 |
|
88-246 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-247 |
|
29/04/2025 - Annual Fee - Monthly Annual Credit Card Fee |
$5.00 |
|
88-248 |
|
30/04/2025 - Department Of Transpor - Vehicle Licence Fee - Plant 99465 |
$455.00 |
|
|
|
|
|
|
|
|
Gallery Curator - Cultural Exhibitions |
|
|
88-249 |
|
01/04/2025 - Coles - Drinks - Event |
$31.20 |
|
88-250 |
|
10/04/2025 - Bunnings Group Ltd - Paint& Roller Kit / Sanding Block / Drop Sheet |
$39.52 |
|
88-251 |
|
10/04/2025 - Healthware Australia - Gloves - Artwork Handling |
$109.60 |
|
88-252 |
|
14/04/2025 - Officeworks - Art Awards Display Folder |
$19.95 |
|
88-253 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Health Services |
|
|
88-254 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Heritage Education |
|
|
88-255 |
|
31/03/2025 - Military Shop - Anzac Nurse Bears - Anzac Museum In A Box Program |
$64.14 |
|
88-256 |
|
31/03/2025 - Ebay O*18-12886-32342 - 10th Light Horse Bear - Museum Education Program |
$86.00 |
|
88-257 |
|
31/03/2025 - Ebay O*18-12886-32342 - 10th Light Horse Bear - Refunded Due To No Stock |
-$86.00 |
|
88-258 |
|
03/04/2025 - Ebay O*09-12910-21620 - 10th Light Horse Bear - Museum Anzac Education Program |
$96.98 |
|
88-259 |
|
06/04/2025 - Amznprimeau Membership - Membership - Free Shipping Heritage Education Purchases |
$9.99 |
|
88-260 |
|
09/04/2025 - Kmart - School Holiday Prizes - Torches / Batteries - Museum Activities |
$64.00 |
|
88-261 |
|
17/04/2025 - Officeworks - Perpex Sign Holders / Clipboards - Museum Education Programs |
$72.24 |
|
88-262 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-263 |
|
29/04/2025 - SP Defence Q Store - Army Canvas Bag - Anzac Mini Museum In A Box Project |
$93.95 |
|
88-264 |
|
30/04/2025 - Museumnext Ltd - Museum and Schools Summit |
$276.20 |
|
88-265 |
|
23/04/2025 - Wicka.Com.Au - Vintage Baskets - Cockman House And Buckingham House Education Program |
$161.30 |
|
88-266 |
|
23/04/2025 - Ikea Pty Ltd - Wooden Boxes And Toys - Museum Playspace |
$53.00 |
|
88-267 |
|
29/04/2025 - Bunnings - Glue Sticks / Tarp / Plastic Covers - Heritage Education Programs |
$75.19 |
|
|
|
|
|
|
|
|
Irrigation Maintenance |
|
|
88-268 |
|
04/04/2025 - L And T Venables Pty Ltd - Tools Replacement |
$200.83 |
|
88-269 |
|
04/04/2025 - Bunnings - Worn Out / Lost Saw Blades And Other Tools Across The Irrigation Staff |
$231.26 |
|
88-270 |
|
11/04/2025 - Galvins Plumbing Suppl - Ridgid Aluminium Nylon Strap Pipe Wrench |
$152.13 |
|
88-271 |
|
11/04/2025 - Master Hose Pty Ltd - Hoses - Redirecting Mainline Water Away From Flushing Points |
$88.95 |
|
88-272 |
|
11/04/2025 - L And T Venables Pty Ltd - Nuts And Bolts - General Repairs |
$31.02 |
|
88-273 |
|
17/04/2025 - Arbwest - Tickets - Beneath The Canopy Seminar |
$880.00 |
|
88-274 |
|
29/04/2025 - Annual Fee - Credit Card Fee Paid Monthly |
$5.00 |
|
88-275 |
|
30/04/2025 - Land And Water Technol - Heavy Duty Sprinkler Surrounds - Enterprise Park. |
$96.80 |
|
|
|
|
|
|
|
|
Kingsway Indoor Stadium |
|
|
88-276 |
|
02/04/2025 - Facebk *Agy2Tkln42 - Advertising |
$183.35 |
|
88-277 |
|
24/04/2025 - Priceless Discounts - Craft Equipment - School Holidays |
$104.00 |
|
88-278 |
|
24/04/2025 – Woolworths - Craft Equipment - School Holidays |
$7.00 |
|
88-279 |
|
28/04/2025 - Rebel Joondalup - May Motivation Prizes |
$422.41 |
|
88-280 |
|
28/04/2025 - Smart Dollars Western - May Motivation Prizes |
$44.00 |
|
88-281 |
|
28/04/2025 - Pline Ph Joondalup631 - May Motivation Prizes |
$22.44 |
|
88-282 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-283 |
|
02/05/2025 - Facebk *H2DH7N4N42 - Advertising |
$743.49 |
|
|
|
|
|
|
|
|
Leasing & Land |
|
|
88-284 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-285 |
|
01/05/2025 - Asic - Company Financial Assessments |
$20.00 |
|
88-286 |
|
01/05/2025 - Asic - Company Financial Assessments |
$20.00 |
|
88-287 |
|
01/05/2025 - Asic - Company Financial Assessments |
$20.00 |
|
|
|
|
|
|
|
|
Library Services |
|
|
88-288 |
|
16/04/2025 - Coles - Reading Club School Holiday Program - Watermelon |
$35.86 |
|
88-289 |
|
17/04/2025 - Aldi Stores - Staff Milk |
$1.55 |
|
88-290 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-291 |
|
29/04/2025 - Coles - Staff Milk |
$3.00 |
|
88-292 |
|
29/04/2025 - Ls Good Sammy Clarkso - Sewing Program Supplies |
$5.00 |
|
88-293 |
|
29/04/2025 - Spotlight Butler - Sewing Program Supplies / Gem Fleece / Peak Fleece |
$54.60 |
|
88-294 |
|
29/04/2025 - Salvos Stores - Sewing Program Supplies |
$15.50 |
|
88-295 |
|
22/04/2025 - Coles - Staff Milk |
$3.00 |
|
88-296 |
|
02/04/2025 - Two Rocks IGA - Milk |
$3.10 |
|
88-297 |
|
10/04/2025 - Two Rocks IGA - Playdoh Ingredients |
$5.64 |
|
88-298 |
|
14/04/2025 - Two Rocks IGA - Milk |
$3.10 |
|
88-299 |
|
22/04/2025 - Two Rocks IGA - Milk |
$3.10 |
|
88-300 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-301 |
|
01/04/2025 - Kmart - Library Projects - Sensory Kit Development - Better Beginnings - In-Kind |
$69.00 |
|
88-302 |
|
04/04/2025 - Officeworks - Refund Of Furniture Not Required |
-$124.00 |
|
88-303 |
|
07/04/2025 - Apple.Com/Au - Software Fee - Digital Projects |
$149.00 |
|
88-304 |
|
12/04/2025 - Twinkl 12241656 - Subscription - Literacy Resources - Staff Use |
$18.99 |
|
88-305 |
|
15/04/2025 - Writing WA - Library Projects - Writing WA Membership |
$135.00 |
|
88-306 |
|
22/04/2025 - Coles - Mindful Art Project - Catering - Wanneroo Contribution - Customer Use |
$39.05 |
|
88-307 |
|
28/04/2025 - Pro Sub Fee - Advertising - Event Platform – Eventbrite |
$15.00 |
|
88-308 |
|
28/04/2025 - Kmart - Better Beginnings Grant - Owl Babies Kit Storage - Wanneroo Contribution |
$99.00 |
|
88-309 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-310 |
|
29/04/2025 - Sq *West Australian Young - Library Projects - WAYRBA - Merchandise |
$123.00 |
|
88-311 |
|
01/05/2025 - Sp Indigenousresources - NAIDOC Resources - Customer Use |
$351.82 |
|
88-312 |
|
29/03/2025 - Red Dot Stores - Materials - Steam Activity |
$15.00 |
|
88-313 |
|
03/04/2025 - Coles - Morning Tea - Boost Program |
$9.00 |
|
88-314 |
|
08/04/2025 - Aldi Stores - Jandakot - Materials - School Holidays Activity |
$24.07 |
|
88-315 |
|
08/04/2025 - Kmart - Materials - Steam Activity |
$55.00 |
|
88-316 |
|
11/04/2025 - Red Dot Stores - Materials - Youth Services Open Day |
$9.99 |
|
88-317 |
|
11/04/2025 - Kmart - Materials - Youth Services Open Day |
$10.50 |
|
88-318 |
|
28/04/2025 - Coles - Materials - Resilient Workshop |
$28.00 |
|
88-319 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-320 |
|
15/04/2025 - Thingz Gifts - Clock - Yanchep Library |
$15.00 |
|
88-321 |
|
17/04/2025 - Thingz Gifts - Clock - Yanchep Library - Replacement |
$4.99 |
|
88-322 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-323 |
|
01/05/2025 - Coles - General Program Materials - Play Doh Supplies - IAAP |
$17.40 |
|
88-324 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-325 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-326 |
|
01/05/2025 - Two Rocks IGA - Milk |
$3.10 |
|
88-327 |
|
31/03/2025 - Lams Oriental Superm - Milk - Staff |
$3.29 |
|
88-328 |
|
03/04/2025 - Lams Oriental Superm - Milk - Staff |
$5.29 |
|
88-329 |
|
10/04/2025 - Lams Oriental Superm - Milk - Staff |
$3.29 |
|
88-330 |
|
10/04/2025 - Clever Patch - Materials - STEAM Sessions |
$155.32 |
|
88-331 |
|
14/04/2025 - Lams Oriental Superm - Milk - Staff |
$2.99 |
|
88-332 |
|
22/04/2025 - Lams Oriental Superm - Milk - Staff |
$3.69 |
|
88-333 |
|
24/04/2025 - Lams Oriental Superm - Milk - Staff |
$4.09 |
|
88-334 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-335 |
|
29/04/2025 - Lams Oriental Superm - Milk - Staff |
$3.69 |
|
88-336 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-337 |
|
23/04/2025 - Designer Allboards P/L - Display Boards - Clarkson Library |
$1,430.00 |
|
88-338 |
|
16/04/2025 - Ezi*Alia - Evidence Based Practice For LIS Professionals - 1 Attendee |
$550.00 |
|
88-339 |
|
22/04/2025 - Wanneroo Central News - Card - Retiring Staff Member |
$14.99 |
|
88-340 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-341 |
|
31/03/2025 - Sp JB Hi-Fi Online - Library DVD Stock |
$32.27 |
|
88-342 |
|
01/04/2025 - Amazon Au - Library Book Stock |
$75.57 |
|
88-343 |
|
07/04/2025 - www.Unleishedart.Com - Library Book Stock |
$103.40 |
|
88-344 |
|
08/04/2025 - Amazon Au - Library Book Stock |
$37.56 |
|
88-345 |
|
08/04/2025 - www.Unleishedart.Com - Library Book Stock |
$64.00 |
|
88-346 |
|
11/04/2025 - Dymocks Online - Library Book Club Kits |
$394.88 |
|
88-347 |
|
14/04/2025 - Amazon Au - Library Book Stock |
$42.56 |
|
88-348 |
|
14/04/2025 - Amazon Au - Library Book Stock |
$98.86 |
|
88-349 |
|
14/04/2025 - Amazon Marketplace Au - Library Book Stock |
$45.57 |
|
88-350 |
|
14/04/2025 - Amazon Au - Library Book Stock |
$43.88 |
|
88-351 |
|
14/04/2025 - Dymocks Online - Library Book Stock |
$232.86 |
|
88-352 |
|
14/04/2025 - Amazon Marketplace Au - Library Book Stock |
$30.77 |
|
88-353 |
|
14/04/2025 - Amazon Marketplace Au - Library Book Stock |
$187.26 |
|
88-354 |
|
14/04/2025 - Amazon Marketplace Au - Library Book Stock |
$65.29 |
|
88-355 |
|
15/04/2025 - Bigw Online - Library Book Stock |
$704.00 |
|
88-356 |
|
15/04/2025 - Amazon Marketplace Au - Library Book Stock |
$61.53 |
|
88-357 |
|
16/04/2025 - Amazon Au - Library Book Stock |
$40.68 |
|
88-358 |
|
16/04/2025 - Bigw Online - Refund For Out Of Stock Item From Order |
-$12.00 |
|
88-359 |
|
18/04/2025 - News Pty Limited - Australian Newspaper Subscription - Wanneroo Library |
$88.00 |
|
88-360 |
|
24/04/2025 - Amazon Au - Library Book Stock |
$99.79 |
|
88-361 |
|
28/04/2025 - Magic Coat* O #3362 - Library Book Stock |
$36.00 |
|
88-362 |
|
28/04/2025 - Wanewsdti - West Australian Newspaper - Wanneroo Library |
$172.80 |
|
88-363 |
|
28/04/2025 - Wanewsdti - West Australian Newspaper - Girrawheen Library |
$172.80 |
|
88-364 |
|
29/04/2025 - Annual Fee - Credit Card Fees |
$5.00 |
|
88-365 |
|
31/03/2025 - Coles - Chocolate Eggs / Chocolate Share Packs /Popcorn Packs / Juice Boxes - Library Shutdown - Programs - Customer Appreciation |
$132.60 |
|
88-366 |
|
01/04/2025 - Coles - Library Shutdown - Bottled Water - Customer Appreciation |
$41.20 |
|
88-367 |
|
01/04/2025 - Coles - Library Shutdown - Popcorn Packs / Chocolate Share Packs / Easter Eggs / Juice Boxes - Customer Appreciation |
$102.30 |
|
88-368 |
|
02/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$57.57 |
|
88-369 |
|
03/04/2025 - Coles - Library Shutdown - Volunteer Acknowledgement - Programs - Chocolate Easter Egg |
$15.00 |
|
88-370 |
|
03/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$14.65 |
|
88-371 |
|
03/04/2025 - Coles - Library Shutdown - Volunteer Acknowledgement - Programs - Chocolate Easter Egg |
$23.00 |
|
88-372 |
|
03/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$14.65 |
|
88-373 |
|
04/04/2025 - Coles - Staff Milk |
$4.35 |
|
88-374 |
|
04/04/2025 - Coles - Library Shutdown - Programs - Popcorn Packs / Chocolate Eggs - Customer Appreciation |
$29.75 |
|
88-375 |
|
04/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$10.73 |
|
88-376 |
|
05/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$10.73 |
|
88-377 |
|
05/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$21.46 |
|
88-378 |
|
05/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$10.73 |
|
88-379 |
|
07/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$10.73 |
|
88-380 |
|
07/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$10.73 |
|
88-381 |
|
10/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$10.73 |
|
88-382 |
|
10/04/2025 - Coles - Library Shutdown - Programs - Customer Appreciation - Popcorn Bags - Chocolate Eggs |
$68.75 |
|
88-383 |
|
10/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$14.65 |
|
88-384 |
|
10/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$35.02 |
|
88-385 |
|
11/04/2025 - Coles - Program Supplies - Biscuits |
$10.50 |
|
88-386 |
|
11/04/2025 - Kmart - Program Supplies - Wooden Spoons - Paper Cups |
$7.00 |
|
88-387 |
|
11/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$10.73 |
|
88-388 |
|
11/04/2025 - Coles - Staff Milk- Coles |
$3.00 |
|
88-389 |
|
12/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$14.65 |
|
88-390 |
|
12/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$47.87 |
|
88-391 |
|
16/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$50.76 |
|
88-392 |
|
24/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$21.46 |
|
88-393 |
|
26/04/2025 - My Post Business/Post - Interlibrary Loans Postage |
$14.65 |
|
88-394 |
|
29/04/2025 - Annual Fee - Monthly Annual Credit Card Fee |
$5.00 |
|
88-395 |
|
29/04/2025 - Annual Fee - Monthly Annual Credit Card Fee |
$5.00 |
|
|
|
|
|
|
|
|
Media & Communications Services |
|
|
88-396 |
|
02/04/2025 - Google Ads1626843768 - Social Media Advertising |
$823.27 |
|
88-397 |
|
02/04/2025 - Linkedin P353409156 - Business Breakfast AARP |
$49.54 |
|
88-398 |
|
03/04/2025 - Facebk *5U8Lxm4Be2 - Social Media Advertising |
$1,375.00 |
|
88-399 |
|
03/04/2025 - Fairfax Subscriptions - Media Advertising - WA Today |
$21.49 |
|
88-400 |
|
25/04/2025 - Facebk *2Bhl3Pgbe2 - Social Media Advertising |
$1,375.00 |
|
88-401 |
|
26/04/2025 - Facebk *Xaulmpcbe2 - Social Media Advertising |
$12.23 |
|
88-402 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-403 |
|
29/04/2025 - Sp Store DJ - General Materials - Store DJ |
$170.00 |
|
|
|
|
|
|
|
|
Parks & Conservation Management |
|
|
88-404 |
|
02/04/2025 - Bunnings - Fertiliser - Rocca Way Roundabout - New Plantings |
$23.78 |
|
88-405 |
|
03/04/2025 - Bunnings - Kangaroo Paws - Memorial Park / Tarps - Vehicle 95702. |
$127.78 |
|
88-406 |
|
10/04/2025 - TT Joondalup Pl - Battery - Hand Blower - Vehicle 95292 |
$379.00 |
|
88-407 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Parks Maintenance |
|
|
88-408 |
|
31/03/2025 - Totally Workwear-Joond - Uniform - High Visibility Vest |
$59.90 |
|
88-409 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Parks Operations |
|
|
88-410 |
|
14/04/2025 - Bunnings - Tools - Park North Crews |
$329.38 |
|
88-411 |
|
14/04/2025 - Bunnings - Tools - Parks North Crew |
$297.88 |
|
88-412 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-413 |
|
30/04/2025 - Officeworks - Office Materials |
$218.15 |
|
88-414 |
|
24/04/2025 - Caltex Wangara - Fuel Cost - Parks North Car Hire Return |
$92.37 |
|
88-415 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
People & Culture |
|
|
88-416 |
|
15/04/2025 - Kmart - Value-Able Awards |
$100.00 |
|
88-417 |
|
15/04/2025 - Kmart - Value-Able Rewards |
$100.00 |
|
88-418 |
|
15/04/2025 - Kmart - Value-Able Reward |
$100.00 |
|
88-419 |
|
15/04/2025 - Kmart - Value-Able Rewards |
$100.00 |
|
88-420 |
|
16/04/2025 - Planning Institute Aus - Advertising - Strategic Planner Vacancy |
$360.00 |
|
88-421 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Preventative Engineering Maintenance |
|
|
88-422 |
|
02/04/2025 - RSEA Pty Ltd - PPE - Staff - Engineering Maintenance |
$379.97 |
|
88-423 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-424 |
|
30/04/2025 - Officeworks - Office Furniture - Engineering Maintenance Staff |
$229.00 |
|
88-425 |
|
30/04/2025 - Officeworks - Office Furniture - Engineering Maintenance Staff |
$697.00 |
|
88-426 |
|
30/04/2025 - IPWEA - Training - Managing Public Lighting |
$165.00 |
|
|
|
|
|
|
|
|
Surveys |
|
|
88-427 |
|
09/04/2025 - Anaconda - Retirement Gift |
$185.00 |
|
88-428 |
|
11/04/2025 - Tcs Wanneroo - Retirement Catering |
$34.95 |
|
88-429 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Traffic Services |
|
|
88-430 |
|
02/04/2025 - Jaycar Clarkson - Returned Laptop Charger |
-$99.95 |
|
88-431 |
|
03/04/2025 - Bunnings - Drill Bits - Drilling Road Screws Into Road |
$19.66 |
|
88-432 |
|
08/04/2025 - Officeworks - Com's Charging Port - Charge Laptop In The Work Ute |
$49.98 |
|
88-433 |
|
14/04/2025 - Bunnings - Extension Cords - Charge The VMS Trailers |
$15.96 |
|
88-434 |
|
29/04/2025 - Annual Fee - Annual Credit Card Fee |
$5.00 |
|
|
|
|
|
|
|
|
Tree & Conservation Maintenance |
|
|
88-435 |
|
01/04/2025 - Officeworks - Officeworks Phone / Tablet Chargers - Conservation Utes And Trucks |
$101.88 |
|
88-436 |
|
09/04/2025 - St John Ambulance Aust - Provide First Aid Course - 4 Attendees - Trees And Conservation |
$680.00 |
|
88-437 |
|
11/04/2025 - Post Wanneroo Post Sho - Working With Children Check |
$87.00 |
|
88-438 |
|
11/04/2025 - Post Wanneroo Post Sho - Working With Children Check |
$87.00 |
|
88-439 |
|
22/04/2025 - Muchea Tree Farm - Tube Stock - Plant Giveaway |
$668.18 |
|
88-440 |
|
24/04/2025 - Work Clobber - Workboots |
$202.50 |
|
88-441 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-442 |
|
29/04/2025 - Work Clobber - PPE Issue |
$331.50 |
|
|
|
|
|
|
|
|
Wanneroo Aquamotion |
|
|
88-443 |
|
31/03/2025 - Post Wanneroo Post Sho - Police Clearance Required For Poisons Permit |
$63.80 |
|
88-444 |
|
31/03/2025 - wwc-Communities - WWC (Creche) - 1 Employee |
$87.00 |
|
88-445 |
|
03/04/2025 - Coles - Water Re Sales |
$18.90 |
|
88-446 |
|
03/04/2025 - Twilio Sendgrid - Pro 100K Includes 100,000 Email Credits Permonth |
$145.22 |
|
88-447 |
|
10/04/2025 - Kmart - Creche Easter Craft |
$20.20 |
|
88-448 |
|
14/04/2025 - Officeworks - Brochure Holder For GF |
$17.08 |
|
88-449 |
|
16/04/2025 - Sp JB Hi-Fi Online - Universal TV Remote - GF Room |
$19.95 |
|
88-450 |
|
23/04/2025 - Bunnings - Aquatics Pool Maintenance |
$381.81 |
|
88-451 |
|
23/04/2025 - Skoolsport Equipment P - 20 Aquatic Whistles |
$57.00 |
|
88-452 |
|
25/04/2025 - Canva* 04497-10808109 - Subscription |
$164.99 |
|
88-453 |
|
28/04/2025 - LC Barcelonawordans - Adjustable Waist Bag - Lifeguards |
$180.19 |
|
88-454 |
|
28/04/2025 - Sp Biz Display Elite - Snap Frames - Aquatics Signage |
$254.99 |
|
88-455 |
|
28/04/2025 - Officeworks - Display Holders |
$30.51 |
|
88-456 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-457 |
|
23/04/2025 - Officeworks - Aquatic Office Supplies |
$152.00 |
|
88-458 |
|
28/04/2025 - Bunnings - Aquatic Maintenance |
$37.02 |
|
88-459 |
|
30/04/2025 - Post Wanneroo Post Sho - WWC - Alisha Berry - Senior Creche Officer |
$87.00 |
|
88-460 |
|
01/05/2025 - Officeworks - Coin Bags |
$9.22 |
|
88-461 |
|
01/04/2025 - ASCTA - Renewal - Swim School Australia Membership |
$385.00 |
|
88-462 |
|
08/04/2025 - Red Dot Stores - Cleaning Supplies - Aquatic Plant Equipment |
$38.97 |
|
88-463 |
|
08/04/2025 - Royal Life Saving WA - Bronze Star Award Fee - Swimmers - Junior Lifeguard Club Swim School Program |
$64.35 |
|
88-464 |
|
08/04/2025 - Royal Life Saving WA - Bronze Medallion Award Fee - Swimmers - Junior Lifeguard Club Swim School Program |
$64.35 |
|
88-465 |
|
17/04/2025 - Kmart - Pool Toys - Children's Swimming Lessons |
$20.00 |
|
88-466 |
|
17/04/2025 - Kmart - Pool Toys - Children's Swimming Lessons |
$24.00 |
|
88-467 |
|
28/04/2025 - Kmart - Dolls - Learn To Swim Program - Instructor Demonstrations In Parent / Baby Lessons And Child Comfort. |
$97.40 |
|
88-468 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-469 |
|
01/05/2025 - Sp Armor-x.com - Waterproof Cases - Samsung Tablets - Swim School Programs |
$432.00 |
|
|
|
|
|
|
|
|
Waste Services |
|
|
88-470 |
|
05/04/2025 - Coles - Drop Off Event Catering |
$100.45 |
|
88-471 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-472 |
|
16/04/2025 - Woolworths/Joondalup & Ch - Materials - Mental Health And Wellbeing BBQ |
$67.00 |
|
88-473 |
|
17/04/2025 - Bunnings - General Expenses - Mental Health BBQ |
$79.47 |
|
88-474 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-475 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-476 |
|
11/04/2025 - Bunnings - Event Consumables |
$58.88 |
|
88-477 |
|
22/04/2025 - Bunnings - Equipment Storage |
$289.00 |
|
88-478 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-479 |
|
29/04/2025 - Annual Fee - Monthly Annual Credit Card Fee |
$5.00 |
|
88-480 |
|
29/04/2025 - Bunnings - Key Lock Box - Waste Office |
$59.00 |
|
|
|
|
|
|
|
|
Youth Services |
|
|
88-481 |
|
31/03/2025 - Coles Online - Food - Outreach - Term 1 |
$86.70 |
|
88-482 |
|
03/04/2025 - Coles - Food - Outreach - Term 1 |
$84.25 |
|
88-483 |
|
07/04/2025 - Kmart - Materials - Outreach - Term 1 |
$75.00 |
|
88-484 |
|
08/04/2025 - Dominos - Food -Outreach Term 1 |
$48.00 |
|
88-485 |
|
10/04/2025 - Dominos Estore Jindalee - Food - Outreach Term 1 |
$48.00 |
|
88-486 |
|
15/04/2025 - Kmart - Materials - April School Holidays - CYH Open Day |
$80.00 |
|
88-487 |
|
14/04/2025 - Woolworths/Yanchep Bch Rd - Food - Outreach Term 1 |
$58.72 |
|
88-488 |
|
16/04/2025 - Woolworths Online - Food - April School Holidays - First Aid Level Up |
$457.90 |
|
88-489 |
|
17/04/2025 - Kmart - Materials - April School Holiday - Carramar Jumps |
$237.00 |
|
88-490 |
|
28/04/2025 - Coles - Food - Outreach - Banksia Grove Project |
$69.90 |
|
88-491 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-492 |
|
28/04/2025 - Subway Carramar - Food - Workshop 5 |
$115.00 |
|
88-493 |
|
17/04/2025 - Coles Online - Food - April School Holidays - Arts And Jumps In Carramar |
$258.80 |
|
88-494 |
|
01/04/2025 - Woolworths Online - Materials - Yanchep Youth Centre - Term 1 - Drop In |
$180.75 |
|
88-495 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-496 |
|
01/05/2025 - Coles - Food - Yanchep Youth Centre - Term 2 - Drop In |
$32.90 |
|
88-497 |
|
28/03/2025 - Coles Online - Material - Drop In - Hainsworth Youth Centre |
$82.02 |
|
88-498 |
|
02/04/2025 - Woolworths Online - Material - Clarkson Youth Hub - Paper Bag |
$78.26 |
|
88-499 |
|
03/04/2025 - Woolworths - Food - Clarkson Youth Hub |
$11.37 |
|
88-500 |
|
04/04/2025 - Kmart - Materials - HYC - April School Holiday |
$220.00 |
|
88-501 |
|
04/04/2025 - Alpha Trophies - Material - April School Holiday Youth Week - CYH & HYC |
$129.55 |
|
88-502 |
|
04/04/2025 - Kmart - Material - Clarkson Youth Hub |
$35.20 |
|
88-503 |
|
04/04/2025 - Rebel - Material - Drop-In - HYC |
$219.98 |
|
88-504 |
|
07/04/2025 - Coles - Food - Outreach |
$202.90 |
|
88-505 |
|
09/04/2025 - Woolworths Online - Food - Clarkson Youth Hub |
$109.43 |
|
88-506 |
|
14/04/2025 - Kmart - Material - April School Holiday - Refund |
-$76.00 |
|
88-507 |
|
11/04/2025 - Sp Jim Kidd Sports - Material - April School Holiday - Youth Week - Clarkson 2025 |
$39.80 |
|
88-508 |
|
14/04/2025 - Kmart - Material - April School Holidays - Youth Week - Clarkson |
$193.50 |
|
88-509 |
|
16/04/2025 - Kmart - Material - Clarkson Youth Hub |
$9.00 |
|
88-510 |
|
16/04/2025 - Woolworths - Food - April School Holidays - CYH Youth Week Open Day |
$12.50 |
|
88-511 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
88-512 |
|
01/05/2025 - Tapping Fuel - Material - Ice |
$5.00 |
|
88-513 |
|
10/04/2025 - Coles Online - Food - January School Holidays - HYC Youth Week Open Day |
$363.55 |
|
88-514 |
|
10/04/2025 - Coles Online - Food - Hainsworth Youth Centre |
$191.24 |
|
88-515 |
|
11/04/2025 - Coles Online - Food Outreach |
$160.00 |
|
88-516 |
|
11/04/2025 - Dominos - Catering - Youth Week Event - Yanchep |
$330.00 |
|
88-517 |
|
29/04/2025 - Canva* 04501-9063575 - Youth Services - Canva Account - Yearly Subscription |
$164.99 |
|
88-518 |
|
29/04/2025 - Annual Fee - David Perry - Annual Card Fee |
$5.00 |
|
88-519 |
|
02/04/2025 - Coles Online - Food - Wanneroo Youth Centre - Term 1 - Drop In |
$173.50 |
|
88-520 |
|
07/04/2025 - Temu.Com - Materials - Beach To Bush - Event Team |
$425.96 |
|
88-521 |
|
09/04/2025 - Aldi Stores - Jandakot - Food - Yanchep Youth Centre - Term 1 - Drop In |
$38.13 |
|
88-522 |
|
09/04/2025 - Coles - Food - Yanchep Youth Centre - Term 1 - Drop In |
$8.00 |
|
88-523 |
|
10/04/2025 - Coles Online - Food - School Holiday - Bulk Order |
$198.00 |
|
88-524 |
|
15/04/2025 - Coles Online - Food - School Holiday - April 2025 - Wanneroo Open Day. |
$371.90 |
|
88-525 |
|
16/04/2025 - Atlas Fuel Wanneroo - Material - School Holiday - April 2025 - Wanneroo Open Day |
$13.00 |
|
88-526 |
|
17/04/2025 - Coles - Food - April School Holidays - Clarkson Youth Week. |
$59.45 |
|
88-527 |
|
23/04/2025 - Subway Clarkson - Food - April School Holiday - Level Up |
$156.01 |
|
88-528 |
|
23/04/2025 - Coles - Food - April School Holidays - Level Up |
$75.36 |
|
88-529 |
|
29/04/2025 - Annual Fee - Credit Card Fee - Paid Monthly |
$5.00 |
|
|
|
|
|
|
|
|
Total - NAB |
$63,640.00 |
|
|
|
|
|
|
CANCELLED PAYMENTS - PREVIOUS PERIOD |
|||
|
123100 |
23.05.2025 |
Carbon Developments |
-$79.62 |
|
125104 |
19.05.2025 |
Lynchee's Painting Company |
-$7,106.00 |
|
123931 |
13.03.2023 |
Ausark Education |
-$328.00 |
|
123067 |
09.05.2022 |
Niall Welsh |
-$11.60 |
|
|
|
|
|
|
|
|
Total - Cancelled |
-$7,525.22 |
|
|
|
|
|
|
TOWN PLANNING SCHEME |
|||
|
|
|
Cell 4 |
|
|
|
|
SERS - Environmental & Contamination Report |
$5,800.00 |
|
|
|
|
|
|
|
|
Total - TPS |
$5,800.00 |
|
|
|
|
|
|
MANUAL JOURNALS |
|||
|
FA25-895 |
30/06/2025 |
Fines Enforcement Lodgement Fees |
$3,612.00 |
|
|
|
Reject Returned Fees |
$20.00 |
|
|
|
CBA CC |
-$14,868.80 |
|
|
|
|
|
|
|
|
Total - Journals |
-$11,236.80 |
|
|
|
|
|
|
General Fund Bank Account |
|||
|
|
|
Payroll Payments June 2025 |
|
|
|
|
10/06/2025 |
$8,554.64 |
|
|
|
10/06/2025 |
$9,517.92 |
|
|
|
10/06/2025 |
$2,418,842.72 |
|
|
|
24/06/2025 |
$2,410,155.94 |
|
|
|
24/06/2025 |
$76,139.27 |
|
|
|
24/06/2025 |
$5,098.97 |
|
|
|
|
|
|
|
|
Total - Payroll |
$4,928,309.46 |
|
|
|
|
|
|
|
|
Bank Fees June 2025 |
|
|
|
|
CBA Pooling Maintenance Fee |
$50.00 |
|
|
|
Merchant Fees |
$12,264.62 |
|
|
|
Amex Fee |
$272.65 |
|
|
|
BPAY Rates |
$9,843.23 |
|
|
|
BPAY FAC |
$63.65 |
|
|
|
BPAY Debtors |
$43.07 |
|
|
|
Bpoint Rates |
$87.26 |
|
|
|
Bpoint Debtors |
$1.61 |
|
|
|
Commbiz Transaction Fees - GST Inclusive |
$331.22 |
|
|
|
|
|
|
|
|
Total - Bank Fees |
$22,957.31 |
|
|
|
|
|
|
|
|
Total - Muni Recoup |
$30,763,295.93 |
|
|
|
|
|
|
|
|
Direct Payments Total (Includes Payroll, Bank Fees & Advance Recoup) |
$35,714,562.70 |
At the close of June 2025 outstanding creditors amounted to $12,968,954.35.
Consultation
Nil
Comment
The list of payment (cheques and electronic transfers) and the end of month total of outstanding creditors for the month of June 2025 is presented to the Council for information and recording in the minutes of the meeting, as required by the Local Government (Financial Management) Regulations 1996.
Statutory Compliance
Regulation 13(1) of the Local Government (Financial Management) Regulations 1996 requires a local government to list the accounts paid each month and total all outstanding creditors at the month end and present such information to the Council at its next Ordinary Meeting after each preparation. A further requirement of this Section is that the prepared list must be recorded in the minutes of the Council meeting.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.2 - Responsibly and ethically managed
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
There are no existing Strategic or Corporate risks within the City's existing risk registers which relate to the issues contained in this report.
Policy Implications
Nil
Financial Implications
Nil
Voting Requirements
Simple Majority
|
Moved Cr Rowe, Seconded Cr Herridge That, in accordance with Regulation 13 of the Local Government (Financial Management) Regulations 1996, Council RECEIVES the list of payments drawn for the month of June 2025, as detailed in this report.
*14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Attachments: Nil
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Property Services
CS04-08/25 **Proposed Agreement for Lease and Ground Lease to the Wanneroo Districts Cricket Club over a portion of Reserve 28058. Kingsway Regional Sporting Complex
File Ref: 5708V004 – 25/262564
Responsible Officer: Acting Director Corporate Strategy & Performance
Attachments: 2
Changes to Report and Additional Information Arising from Agenda Briefing
The following additional information is provided in response to questions raised at the Agenda Briefing meeting on 12 August 2025. Reference is made to the sections of the Briefing report where the additional information is relevant.
Background
· Indoor pavilion:
o The purpose of the indoor pavilion is to provide a dedicated space for cricket training.
o With the addition of the new indoor facility, the City will review the future use of the existing leased indoor cricket facility located adjacent to the netball courts at Kingsway Regional Sporting Complex.
· Funding:
o The cost estimate from WDCC (provided to Administration prior to the project securing the further $1 million from the State was $2 million). This means that the anticipated works cost is expected to be less than the allocated funding.
o Whilst WDCC is required to use suitably qualified contractors and secure all approvals and certifications for the works, WDCC has acknowledged that portions of the works can be undertaken at a saving by qualified contractors affiliated with WDCC. This may provide efficiencies for the project.
· WDCC/ WDHA relationship and future licence:
o WDCC and WDHA have a long term history of close collaboration, dating since at least the commencement of the current lease in 2001.
o As part of the proposed new arrangement, Administration held multiple joint meetings with WDCC and WDHA to discuss future usage of the facility on completion of the project. Both parties were provided with copies of the draft documentation. WDCC and WDHA were both supportive of moving to the proposed new lease format.
o Administration remains confident that the positive working relationship and collaboration between WDCC and WDHA will continue.
o Further, WDCC has agreed to have WDHA use the facility during the hockey season on a sublease or licence basis. The lease between WDCC and the City will reference WDHA’s use of the facility and, in addition, there will be a sublease or licence between WDCC and WDHA. Administration anticipates that the current arrangement will remain in place after project completion, albeit over a larger improved facility.
o As a further administrative measure to support the continuation of the WDHA access, Administration would ensure that, before the Agreement for Lease and Ground Lease are signed, Administration also ensures the parties’ agreement to a new sublease or licence between WDCC and WDHA (conditional on the Ground Lease commencing), with that document to include a requirement for the City to be notified if there is a default or breach and for the City to consent before a termination occurs.
o The Ground Lease includes provision for early termination by the City or WDCC for any reason (i.e. on a ‘termination for convenience’ basis) arising after 10 years, which would provide a further, longer term opportunity for the City to take a more active role in the state of the facility, if the proposed new operating arrangement proves less sustainable.
Detail
· Additional parking: As clarification, the proposed redevelopment does not provide additional parking.
· Temporary facilities during works period:
o During the works, Administration anticipates that WDCC and WDHA will continue to have access to the playing fields alongside temporary changeroom facilities.
o WDCC and WDHA have requested that the City provides these facilities, which will require further investigation to identify a suitable temporary location.
Issue
To consider a proposed agreement for lease (incorporating a ground lease) to the Wanneroo Districts Cricket Club (WDCC) over a portion of Kingsway Regional Sporting Complex.
The proposal includes the demolition of the existing facility and redevelopment by WDCC, for future occupation by WDCC and the Wanneroo Districts Hockey Association (Inc) (WDHA).
Background
Reserve 28058
The proposed lease arrangement relates to a portion of the Kingsway Regional Sporting Complex, Lot 555 on Deposited Plan 64232, being the whole of the land in Crown Land Title Volume LR3158 Folio 501, also known as Reserve 28058 (Reserve 28058), being under the care, control and management of the City via a management order for the purpose of ‘Recreation’.
The management order includes a power to lease or licence the land, for not more than 21 years and subject to the consent of the Minister for Lands.
Reserve 28058 is a category ‘C’ reserve, and is zoned as ‘Parks & Recreation’ under the Metropolitan Region Scheme and ‘Regional Parks & Recreation’ in the City’s District Planning Scheme No. 2.
Existing lease
WDCC and WDHA are long term co-tenants of an existing clubhouse facility at Reserve 28058 (Attachment 1 refers). The leased area under the current lease is approximately 745m2.
The current lease commenced on 1 December 2000 for a 21 year term. Following the scheduled expiry date of 30 November 2021, the parties have continued to occupy the premises on a monthly tenancy under holding over provisions in the lease while future arrangements were considered and negotiated.
Under the terms of the current lease, WDCC and WDHA are jointly and severally liable for the facility, even though in practice each party only uses the site for its playing season (summer for WDCC and winter for WDHA).
Facility upgrade
Administration considers the existing facility as having further useful life, with the facility not being scheduled for renewal or replacement by the City. However, feedback from current users (WDCC and WDHA) indicates that the facility is seen as dated and not suiting their requirements.
WDCC has been interested in redeveloping the site, with this prompting WDCC to investigate external funding opportunities.
As part of the 2022 Commonwealth election, WDCC secured a $2 million funding commitment for a redevelopment. This has recently been supplemented by further successful funding (for an additional $1 million), secured at the 2025 WA State election.
WDCC’s proposed redevelopment aims to replace the outdated clubrooms with a modern, fit-for-purpose sports pavilion that meets current community expectations, including improved amenities to support female sports participation.
The new facility will feature an increased number and size of changerooms, including unisex toilets and showers with lockable cubicles to accommodate all players, as well as dedicated unisex umpire changerooms with showers and amenities.
Upgrades will also include improved facilities for players, umpires, and spectators, a commercial-grade kitchen, dedicated food and beverage service counters, and expanded cool room storage.
Public unisex amenities will be accessible from both inside and outside the pavilion, and additional storage space will be provided for both cricket and winter sports.
Administration supports the proposed redevelopment, funded by WDCC using its Commonwealth and State assistance, as offering a good outcome for WDCC, WDHA and the community. The City’s user funded facility upgrade processes will apply to the redevelopment.
Administration has worked with the WDCC to finalise the proposed agreement for lease (incorporating a ground lease) to enable the Club to complete the project within their funding requirements.
Future lease arrangement
The proposed redevelopment requires the demolition of the existing facility and the construction of a new facility on a significantly expanded leased footprint. This scenario has been the basis for the lease arrangement which is the subject of the current report.
Administration has been in discussions with both WDCC and WDHA in relation to the future lease arrangement, being a shift to a lease with WDCC only. WDHA will use the facility for its hockey season under licence from WDCC.
The current relationship between the parties appears to be cooperative, and the proposed ground lease will offer protections for WDHA’s access. This has been a consideration in Administration and WDHA’s support for the proposed lease arrangement.
Detail
Development proposal
Administration has supported WDCC in applying for planning approval for the redevelopment. This involved the City (in its role as land manager) signing a development application by WDCC, which was then referred to the Western Australian Planning Commission (WAPC) for approval.
Administration’s assistance with the development application has been on the basis that construction will not occur until the proposed Agreement for Lease and Ground Lease has been approved by the Minister for Lands (as the site is Crown land), approved by Council and executed by both parties.
WAPC consideration is pending at the time of the current report.
Proposed lease terms
WDCC’s intention is to demolish the existing clubhouse and build new premises that will incorporate a larger lease footprint than the current clubhouse footprint. Further, the new proposed lease is with WDCC as the sole tenant (with WDHA accessing the site as a licensee of WDCC).
In this context, the following proposed essential terms for the Agreement for Lease and Ground Lease have been approved ‘in principle’ by WDCC and WDHA.
Agreement for Lease (AFL)
The AFL is a document that precedes the Lease and essentially is an agreement between the parties to outline the development steps and timeframes for the development to be undertaken by WDCC.
Under the terms of the new Agreement for Lease, the parties (both WDCC and WDHA) will surrender the existing lease one day prior to handover for commencement of WDCC’s works.
|
Land |
Lot 555 on Deposited Plan 64232, being the whole of the land in Crown Land Title Volume LR3158 Folio 501, also known as Reserve 28058 and situated at 100 Kingsway, Madeley (Reserve 28058).
|
|
Premises
|
Approximately 2,500m² (subject to final measurement and survey) portion of the Land (Attachment 1 refers).
(Leased area incorporates the footprint of the original premises, plus the expansion/redevelopment area. New premises plan to be prepared.)
|
|
Lessee
|
Wanneroo Districts Cricket Club (IARN A0730056P; ABN 61 296 848 343)
(This is a change from the lessees under the original lease, which were both WDCC and WDHA as joint tenants. Due to the change impacting both current lessees, the proposed terms and new lease documentation have been being provided to both parties.)
|
|
Commencement of Works |
Commencement of works following a handover date determined under the Agreement for Lease.
The handover date is to be confirmed by the City, following:
· Council approval to the AFL and Ground Lease;
· In-principle Ministerial consent obtained to the AFL and Ground Lease (required under section 18 of the Land Administration Act;
· Execution of all lease documents;
· WDCC securing:
a) approval to commence development (DA) from the WAPC (currently pending); and
b) a building licence, each on terms acceptable to the City (as landlord);
· WDCC providing all insurances required under the AFL, which includes insurance covering its contractors and their works; and
· WDCC providing the security bond or bank guarantee required under the AFL.
No site access is permitted for development works (including preparation works, lay down and fencing) until handover has been approved by the City.
Prior to handover, the City anticipates completing a final review to confirm that the funding held by WDCC is sufficient for the demolition of the existing facility and the construction of the new facility.
Timing for handover will also need to have regard to the requirements for WDCC’s and WDHA’s operating seasons.
|
|
Lessee Works |
Construction of WDCC’s proposed facility redevelopment, in accordance with the plans provided in Attachment 2 (subject to WAPC approval) and including
· Upgrade to the public facilities, to include at least 2 public unisex toilets, a BBQ area and at least 1 new drinking fountain.
· Increase car park capacity to include at least 14 additional car spaces.
· Integrated renewal energy (installation of solar panels to roof of the existing facility).
· Conceal existing wheelie bin area from car park and roads.
· At least 4 additional changerooms and at least 4 umpires rooms; all additional rooms to including unisex toilets and showers.
· Additional storage facilities.
· Upgrade kitchen with dedicated food and beverage service counters and increased cool room storage.
Lessee’s works will include sub-metering, if not already in place.
Lessee must complete a dilapidation report before handover, in a form acceptable to the City in its absolute discretion.
|
|
Existing Facility
|
The Lessee Works includes the demolition of the existing facility. Accordingly, the disposal of property under the proposed Agreement for Lease will result in the removal of a current City asset.
|
|
Funding
|
In addition to the Funding approval in clause 3.5, the Lessee must keep the Lessor informed (including to promptly advise on changes to) about the nature of the Lessee's funding arrangements, sources of funding and conditions imposed on that funding throughout the term of this Agreement.
|
|
Development and approvals |
Development is to be in accordance with the DA issued by the WAPC, agreed development plans and specifications, the building licence, and all other required approvals and in compliance with applicable legislation and regulations, and an approved timetable for practical completion including fit out of the premises.
All approvals are the responsibility of WDCC.
|
|
Fencing |
By Lessee at its sole cost.
|
|
Earthworks |
By Lessee at its sole cost.
|
|
Fit out |
By Lessee at its sole cost.
|
|
Practical Completion |
Practical completion of the Lessee Works occurs when the City has inspected the Lessee Works and is satisfied that the Lessee Works have been carried out and is in compliance with all approvals.
Practical Completion of the Lessee Works will result in the Ground Lease commencing on the next day, on the terms outlined below and in accordance with a template version of the Ground Lease which will be attached to the Agreement for Lease.
|
|
Estimated Date of Practical Completion |
12 months from satisfaction of the last of all necessary approvals (such as development and building approvals and Ministerial consent to the AFL).
The date can be extended by the parties’ agreement.
|
|
Sunset Date |
36 months after the signing date of the AFL. |
|
Insurance |
Insurances for the build phase are essential and a precondition to site handover. Insurance requirements include:
· Contractors all risk (CAR) insurance on the lessee’s works to its full reinstatement and replacement value on a comprehensive basis.
· Public risk liability insurance applying to the lessee’s liability concerning the lessee’s works, with limits of not less than $20 million per occurrence.
· Buildings policy for damage or destruction caused to the land or any improvements for the full replacement value.
· Workers compensation insurance for all persons engaged in carrying out the lessee’s works.
WDCC responsibility to ensure that a CAR policy is in place to ensure that the proposed construction works are insured adequately.
Once practical completion has been achieved, insurances such as Public Liability and Building and contents insurance will need to be maintained under the Ground Lease.
|
|
Indemnity |
The Lessee indemnifies the City against all losses which the City suffers or incurs in connection with any damage, loss, injury or death arising directly or indirectly from the construction, installation or carrying out of the development/works.
|
|
Costs |
All project, approval and construction costs will be borne by WDCC. This includes any utility modifications and upgrades, plus sub-metering.
If a consultant needs to be engaged by the City to review any aspect of the works (such as checking site servicing implications), this would be on-charged to WDCC.
WDCC has confirmed that it does not require the City to fund the development, aside from providing the site for the new facility.
|
|
Existing lease |
Handover for the Lessee works will occur at a time confirmed by the AFL (as outlined above).
Handover will trigger the surrender of the existing lease, which will have remained in place for the interim period before handover.
|
Lease (Ground Lease)
The Lease, with essential terms as outlined below, will commence following practical completion of the development.
|
Lease Type |
Ground Lease
|
|
Rent |
$1 per annum plus GST (peppercorn rental).
Administration estimates, based on other developed areas in Reserve 28058, the Gross Rental Value (GRV) applicable to the Premises would be approximately $50,000 to $100,000 (most likely at the higher end of this range).
GRV is the gross annual rental that a property might reasonably be expected to earn annually if it were rented, including rates, taxes, insurance and other outgoings.
Accordingly, the peppercorn rent under the proposed lease is a favourable outcome for WDCC and WDHA and a positive contribution by the City to the project.
|
|
Term: |
10 years, commencing on the Commencement Date.
|
|
Commencement Date |
The day after Practical Completion of the Lessee Works as described in the Agreement for Lease.
|
|
Option Term
|
5 years |
|
Permitted Purpose |
Cricket and hockey club and associated sporting activities.
|
|
Rates & Taxes |
Lessee responsible for all rates (including Council rates and water rates), taxes, assessments and impositions.
Administration notes that local government rates have been exempted by the City for other similar tenancies and third-party operated community facilities, however, this is a matter addressed and determined by Council under the City’s annual budget process.
|
|
Outgoings |
Lessee responsible for all outgoings (not limited to) electricity, gas, water and telephone/broadband used in relation to the Premises whether billed directly or otherwise.
|
|
Building Insurance |
Lessee responsibility
|
|
Public Liability Insurance
|
Lessee responsibility – Minimum $20 million
|
|
Other Insurance (including contents, public liability, plate glass and the like)
|
Lessee responsibility
|
|
Maintenance |
Lessee responsible to maintain the Premises.
Maintenance responsibilities include structural and capital works, given that the lease is on a ground lease basis.
The City is not responsible for maintenance.
|
|
Structural Maintenance |
Lessee responsibility
|
|
Statutory Compliance |
Lessee responsibility
|
|
Signage
|
Signage on the facility will require the City’s approval under the terms of the Ground Lease.
Administration anticipates that the external façade of the facility will include signage identifying both WDCC and WDHA.
|
|
Bond |
$5,000 (for submission to City on or before Handover Date under the AFL)
(This amount may be provided as a security bond or a bank guarantee.)
|
|
Ownership of improvements to the Land |
Ownership of all improvements erected or constructed on the Land by the Lessee will at the expiry of the lease (and option period) revert to the City or be removed at Lessee’s cost if the City deems it does not require the improvements at the end of the lease.
Lessee to provide a building inspection (from a consultant approved by the City, on a scope approved by the City) at the Lessee’s cost, before the City determines whether the building will be retained.
|
|
Subletting and other use
|
Lessee permitted to share possession with WDHA, with the arrangement formalised by a special condition in the Lease.
As the sole lessee, WDCC is directly liable for operations at the site, including by a licensee or subtenant such as WDHA.
Cost sharing arrangements between WDCC and WDHA, such as for recovery of insurance premiums and submetered utility costs for WDHA’s seasonal access, would be administered by WDCC.
|
|
Business Plan and Reporting |
Lessee is currently finalising an updated business plan, which will be provided to Administration before the signing of the AFL and the Ground Lease.
The business plan is required to demonstrate the Lessee’s capacity to construct the facility and to maintain it during the term of the Lease (including options), extending to capital and structural works and renewal.
Business plans will be required at 5 yearly intervals during the term of the Lease (including before any option of renewal is exercised).
|
Draft Agreement for Lease and Ground Lease documentation (based on City templates and reviewed by the City’s internal legal section), incorporating the agreed essential terms as outlined in this report, have been presented to the Club and has been agreed ‘in principle’.
Minor amendments may be needed to address final delivery considerations, such as in response to changes arising from the pending WAPC approval of the development application, but these are not expected to depart from the essential terms outlined above.
The documentation is also subject to consent from the Minister for Lands, as required under Section 18 of the Land Administration Act 1997 (WA). This consent is currently pending, with Administration anticipating a final response in the next couple of weeks.
Consultation
The current proposal is the result of close collaboration between Administration and existing users, particularly WDCC and with involvement from WDHA to ensure its interests are also represented.
The redevelopment is being coordinated through the City’s user funded facility upgrade process.
Relevant Administration service units, including Asset Planning and Community Facilities have been consulted during facility redevelopment planning, in the negotiation of the AFL and Ground Lease and related considerations.
Administration is supportive of the proposal as outlined in this report, which is the product of extensive collaboration with the WDCC (with WDHA being kept engaged through the process) to reach a recommended position. It is acknowledged that both clubs have used the site for many years, and the clubhouse, in its current form, is not in a form that would attract greater female participation.
The proposed new build and the expanded footprint will accommodate future growth of both sports and an improved community outcome.
Comment
Administration recommends the proposed Agreement for Lease and Ground Lease to WDCC as outlined in the current report:
· The proposed facility redevelopment and shift to a new Ground Lease with WDCC will enable the construction of an enhanced community facility, at no construction cost to the City.
· The new facility will assist both WDCC and WDHA to increase female participation in their respective sports, thereby potentially increasing membership numbers overall, and would give the clubs capacity to host events in a new and improved clubhouse.
· The lease documentation has been negotiated and agreed in principle by both parties, with the approval of the Minister for Lands pending. Signing of the documentation should occur within 1-2 months following the Minister’s approval, supporting the commencement of WDCC works (once AFL conditions are met) later in 2025.
Current progress has been the outcome of strong, positive collaboration between the City, WDCC, WDHA and other stakeholders. In considering the current item, Council should have certainty as to the scope of the WDCC and WDHA facility and how the lease arrangement will be implemented.
Statutory Compliance
The proposed AFL and Ground Lease to WDCC is an exempt disposition of property under regulation 30 of the Local Government (Functions and General) Regulations 1996 (WA), and accordingly a local public notice under section 3.58(3) of the Act does not apply
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
1 ~ An inclusive and accessible City with places and spaces that embrace all
1.4 - Bringing people together
Risk Appetite Statement
In pursuit of strategic objective goal 1, we will accept a Medium level of risk. The recent pandemic has challenged our previous event delivery, place activation and community connection processes, and the City accepts that meeting community expectations in a more restrictive environment needs flexibility and innovation if community connection is to develop and grow in contrast to social and individual isolation.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
ST-S23 Stakeholder Relationships |
Medium |
|
Accountability |
Action Planning Option |
|
Chief Executive Officer |
Manage |
|
Risk Title |
Risk Rating |
|
ST-S24 Strategic Asset Management |
Medium |
|
Accountability |
Action Planning Option |
|
Director Assets |
Manage |
|
Risk Title |
Risk Rating |
|
CO-O08 Contract Management |
Low |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
The above risks relating to the issue contained within this report have been identified and considered within the City’s Strategic and Corporate risk registers. Action plans have been developed to manage these risks to support existing management systems.
Policy Implications
The proposed essential terms of the AFL and Ground Lease as outlined in this report are required to be presented to Council for approval as they exceed the parameters that permit the lease to be negotiated under the City’s Leasing Policy. For example, the proposed total term of the lease (including options) is greater than ten (10) years.
The terms of the AFL and Ground Lease are otherwise consistent with the City’s Leasing Policy.
Financial Implications
Site establishment and maintenance
The planned facility constructed and/or required site works under the AFL will be at the full cost of WDCC.
All ongoing maintenance of the building and the leased area will also be the responsibility of WDCC. This will mean that some of the City’s current maintenance responsibility for the existing facility will be taken over by WDCC as part of its administration of the Ground Lease.
WDCC will also be responsible for site ‘make good’ at the expiry of the Ground Lease.
The expenditure of the WDCC’s funding ($2 million in Commonwealth support, and $1 million in State contribution) on a new facility will, at the expiry of the lease (or expiry of the option should it be exercised), mean the City has an improved asset than what the current lease provides.
Asset value
The existing facility has a replacement value of $2.305 million, based on the City’s most recent asset valuation. The assessed ‘fair value’ (being gross replacement cost less accumulated depreciation) is $1.185 million.
The proposed redevelopment will result in the loss of the existing asset, albeit with the replacement of a ‘new’ facility (which will become the property of the City at the end of the new lease).
Lease operations
WDCC is responsible for construction, operating and maintenance costs (including capital and structural items) and any make good requirements at the end of the lease term.
The City is not recouping rent or maintenance fees from WDCC. As noted above in relation to the essential terms of the Ground Lease, there is a value (on a GRV basis) which may be viewed as the contribution of the City’s support in providing the site for the WDCC development.
Voting Requirements
Simple Majority
|
Moved Cr Rowe, Seconded Cr Herridge That Council:- 1. APPROVES, in principle, an agreement for lease and a ground lease of a 2,500m² portion (approximate, subject to measurement and survey) of Reserve 28058, Lot 555 on Deposited Plan 64232 Volume 3158 Folio 501 (Kingsway Regional Sporting Complex) to the Wanneroo Districts Cricket Club: a) incorporating the demolition of the existing facility and redevelopment of a new facility, subject to the conditions described in the Administration report, including for development approval and other approvals; and b) in accordance with the essential lease terms described in the Administration report; 2. AUTHORISES: a) the Chief Executive Officer (or a nominee of the Chief Executive Officer) to negotiate terms, execute all documentation and comply with all applicable legislation as is required to effect Item 1. above; and b) the affixing of the Common Seal of the City of Wanneroo to an agreement for lease and a ground lease between the City and the Wanneroo Districts Cricket Club in accordance with the City’s Execution of Documents Policy and 3. APPROVES the Wanneroo Districts Hockey Association (Inc) accessing the facility described in Item 1. above under a licence or sublease from the Wanneroo Districts Cricket Club.
*14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
|
1⇩. |
Attachment 1 - Premises Plan (old and new) (2025-07 Wanneroo Districts Cricket Club - Proposed Lease) |
25/283720 |
|
|
2⇩. |
Attachment 2 - DA 2025/128 - WDCC Clubrooms |
25/283737 |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Cr Berry declared a financial interest in CE01-08/25 due to having a financial interest in the matter.
Cr Rowe declared a financial interest in CE01-08/25 due to having a financial interest in the matter.
File Ref: 2391 – 25/254979
Responsible Officer: Chief Executive Officer
Attachments: 3
Previous Items: 3.1 - Review of the Council Members Fees, Allowances, Reimbursements and Benefits Policy and Related Policies - Concept Forum - 04 Feb 2025 Special Concept Forum
3.5 - Review of Council Members' Continuing Professional Development Policy - Concept Forum - 01 Jul 2025
CE01-09/24 - Extension of Review Dates of Council Policies - Ordinary Council - 10 Sep 2024
CE02-03/25 - Extension of Review Dates of Council Policies - Ordinary Council - 25 Mar 2025
Changes to Report and Additional Information Arising from Agenda Briefing
Updated Attachments
Attachment 2 and 3 Updated with minor changes:
· Updated the Responsible Service Unit; and
· Removed clause 6.5.5 (e) as this is covered by 6.5.5 (d).
Council Member Queries
1. Is the content under the “Reporting” heading in Attachment 2 missing from Attachment 3?
Response – No. The information is included under the “Roles and Responsibilities” heading, specifically in clauses 8.2 and 8.3 in Attachment 3.
.
2. What is the rationale behind clause 6.2.4 j)?
Response – The process remains unchanged from the previous policy (Attachment 1). A review of the information available from the last policy review does not detail why this clause was included. Requests for study tours or official delegations received by the CEO will continue to be presented to a Concept Forum for Council Member consideration and feedback prior to any action being taken or report to Council being presented.
Issue
To undertake a review of the Council Members’ Continuing Professional Development Policy (Policy).
Background
The Policy last underwent a major review in December 2022 to reflect legislative changes. An extension to the review date to 30 April 2025 was approved by Council at the September 2024 Ordinary Council Meeting (CE01-09/24).
At the March 2025 Ordinary Council Meeting, a further
extension of the review date to
30 September 2025 was approved (CE02-03/25).
Detail
Council workshopped the Policy at a Special Concept Forum on 4 February 2025 and again at the Concept Forum on 1 July 2025, providing feedback on the content and provisions, such as:
· Council policy should promote, not restrict, Council Members’ participation in training and development activities (referencing the special conditions that apply to more than three persons requesting to attend the same training activity).
· Consider options to aggregate allowances so that Council Members have more choice and flexibility to allocate their allowances appropriately to their needs (noting the requirement for transparent accounting and reporting of use of allowances).
· Addition of rideshare reimbursements in addition to taxi reimbursements.
· Establishment of the Council Member Industry Engagement Allowance to replace the Speaking Engagement Allowance.
Consultation
Legal Services was consulted to undertake a legal review of the Policy and statutory Compliance and their input has been incorporated into the review process.
Comment
The following versions of the Policy are attached:
· Original version (Attachment 1)
· Marked up version (Attachment 2)
· Clean version (Attachment 3)
Changes made to the Policy reflect Council feedback and governance input and include:
· Removal of references to CPI increase – It is recommended that increasing the amount every policy review instead of reliance on variance in CPI which is less certain.
· Amalgamation of Council Member Professional Conference Allowance (CMPCA) and Council Member Education Allowance (CMEA) into one singular Council Member Professional Development Allowance (CMPDA).
· Renaming of “Council Member Education Session” to “Council Member Group Education Session” for better clarity.
· Renaming of “speaking engagement” to “industry engagement” to avoid confusion between a Council Member speaking at an engagement and attending an engagement. Replacing the Council Member Speaking Engagement Allowance with Council Member Industry Engagement Allowance (CMIEA).
· Remove “Interstate” from requirement for Council approval if three or more Council Members wish to attend an event – clause 6.5.5 (d).
· Implementation of a clearer, more streamlined request and approval process.
· Diminishing the requirement for council approval for an event where more than three request has been received – now only required where that event is held interstate or overseas.
· General housekeeping – change of Administration titles, repositioning of sections for better cohesion, removal of sections lacking relevance to Policy, updating legislation.
· Addition of rideshare reimbursements in addition to taxi reimbursements.
Statutory Compliance
Legal Services carried out a legal review of the Policy to ensure compliance with the Local Government Act 1995 and Local Government (Administration) Regulations 1996.
A legal review of the Policy was deemed necessary as a result of the addition of Regulation 37 in the Local Government (Administration) Regulations 1996 on 18 October 2023.
The outcome of the review is captured in the table below. Where sections have been shown as non-compliant or comments have identified that some parts of the policy requires changing, this has been amended as a markup in the Policy.
|
Legislation |
Mandatory (MUST) |
In Policy ? |
|
Mandatory Training |
||
|
s 5.126 (1) s 5.126(2) Reg 35
|
Must Complete training of Council Member Essentials within 12 months of being elected. |
Yes |
|
Reg 36 (1)(a) & (b) |
Exempt from Council Member Essentials if already passed certain courses |
Yes |
|
Reg 36(2) |
Exempt from Council Member Essentials if the person is a council member on 9 Aug 2019 until end of office |
Yes, but amend to include the date of 9 Aug 2019 for clarity
Update: added in 1.4(b) |
|
s 5.127 (1) & (2) |
(a) Must prepare a report each year on training completed by CM (b) Must publish report on City website |
Yes |
|
Continuing Professional Development (CPD) |
||
|
s 5.128 (1) (4) & (5) |
(a) Must have a policy in relation to CPD of council members (legislation does not specify what needs to be in there except that there must be one) (b) Must publish policy on website (c) Must review policy after each election |
Yes |
|
Payment and reimbursement of CPD fees and expenses |
||
|
Reg 37(2) |
If LG chooses to adopt CPD policy, must not allow for payment or reimbursement if the CPD is not relevant to CM’s role under Act |
No
Update: added in 2.4(h) |
|
Reg 37(3) |
If LG chooses to adopt CPD policy, Must not allow for payment or reimbursement if the CPD was attended within: (a) 3 months of expiry of the CM’s term (b) The time specified in a resignation notice (c) Whilst the CM or council is suspended. |
No
Update: added in 2.4(h) |
|
Reg 31(1)(c) |
Childcare and travel costs to be reimbursed to Council Member if attending Council Member Essentials Course |
No
Update: added in 1.5 |
|
Legislation |
Optional (MAY) |
In Policy? |
|
s 5.129(1) |
LG May prepare a policy where the LG: (a) Pays CM to attend training (b) Reimburses CM for fee or expense to attend training (c) Pays CM to attend CPD (d) Reimburses CM for fee or expense to attend training
|
Yes |
Additionally, s 5.128(5) of the Local Government Act 1995 states:
A local government —
(a) must review the policy after each ordinary election; and
(b) may review the policy at any other time
Consideration should be given as to whether Council wishes to defer the review of the Policy until after the 2025 local government election, as another mandatory review of the Policy will need to be undertaken after that time.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-O12 Fraud & Misconduct |
Medium |
|
Accountability |
Action Planning Option |
|
General Counsel |
Manage |
|
Risk Title |
Risk Rating |
|
CO-O17 Financial Management |
Medium |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
Policy Implications
Nil
Financial Implications
Funds required to meet the City’s commitment to payment of Council Members’ mandatory training and continuing professional development are incorporated into the annual operational budget.
Costs associated with the review of Council policies, such as advertising of changes and replacement of published materials, will also be met from operational budgets.
Voting Requirements
Absolute Majority
|
Moved Cr Wright, Seconded Cr Herridge
Council Members who
spoke on the item prior to the adjournment were: Mayor Aitken, The meeting resumed at 9:22PM.
Cr Berry left the meeting, the time being 9:23pm Cr Rowe left the meeting, the time being 9:40PM
Motion to amend
Moved Cr Nguyen, Seconded Cr Bedworth That the recommendation to Council is amended by inserting the underlined words in the recommendation as follows:
That Council APPROVES by ABSOLUTE MAJORITY the revised Council Member Continuing Professional Development Policy as shown in Attachment 3 subject to deleting paragraph 6.2.4 k ii).
The Motion to Amend was put and lost 4/8
For the motion: Cr Bedworth, Cr Coetzee, Cr Moore and Cr Nguyen
Against the motion: Mayor
Aitken, Cr Figg, Cr Herridge, Cr Miles, Cr Parker, Cr Seif,
The Substantive Motion was put and
carried UNANIMOUSLY 12/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Coetzee, Cr Figg, Cr Herridge,
Against the motion: Nil |
Attachments:
|
1⇩. |
Attachment 1 - Council Member Continuing Professional Development Policy - Current Version |
20/231812[v3] |
|
|
2⇩. |
Attachment 2 - Council Member Continuing Professional Development Policy - Marked Up Version |
25/274698 |
|
|
3⇩. |
Attachment 3 - Council Member Continuing Professional Development Policy - Clean Version |
20/231812[v4] |
|
Cr Helen Berry returned to the meeting, the time being 9:53PM.
Cr James Rowe returned to the meeting, the time being 9:53pm.
CE02-08/25 **Review of the Attendance at Events Policy (Council Members and Chief Executive Officer)
File Ref: 2391 – 25/255159
Responsible Officer: Chief Executive Officer
Attachments: 3
Previous Items: 3.6 - Attendance at Events Policy (Council Members and CEO) - Concept Forum - 28 Jan 2020
Consideration of Council Member Attendance at Events - Ordinary Council - 21 Nov 2023
3.1 - Review of the Council Member Attendance at Events Policy - Concept Forum - 20 Aug 2024
3.1 - Review of the Attendance at Events Policy (Council Members and Chief Executive Officer) - Concept Forum - 01 Apr 2025
3.4 - Review of the Attendance at Events Policy (Council Members and Chief Executive Officer) - Concept Forum - 01 Jul 2025
Changes to Report and Additional Information Arising from Agenda Briefing
A change to the policy has been made as a result of discussions occurring at Policy Review Committee on 18 August 2025. Within clause 6.2 of the policy an additional category of events being “Events which are sponsored by the City” has been included at (j). These changes have been made to Attachment 2 and Attachment 3.
The change has been made to facilitate Council Members or the Chief Executive Officer (CEO) requests for tickets to events where the City is a sponsor. Approval and Gift Disclosures as set out in the Policy would need to be obtained but the inclusion sets out there is an express benefit to the City.
Issue
To consider the revised Attendance at Events (Council Members and Chief Executive Officer) Policy (Policy) which was last adopted by Council on 10 February 2020 (Attachment 1).
Background
Section 5.90A(2) of the Local Government Act 1995 (the Act) requires that local governments adopt and implement an Attendance at Events Policy, which must be published on the local government’s website.
(2) A local government must prepare and adopt* a policy that deals with matters relating to the attendance of Council members and the CEO at events, including —
(a) the provision of tickets to events; and
(b) payments in respect of attendance; and
(c) approval of attendance by the local government and criteria for approval; and
(d) any prescribed matter.
* Absolute majority required.
(3) A local government may amend* the policy.
* Absolute majority required.
(4) When preparing the policy or an amendment to the policy, the local government must comply with any prescribed requirements relating to the form or content of a policy under this section.
(5) The CEO must publish an up-to-date version of the policy on the local government’s official website.
An extract from the Department of Local Government, Sport and Cultural Industries’ (DLGSC) Attendance at Events Guidelines refer:
“The Attendance at Events policy is to enable Council Members to attend events as a representative of Council without restricting their ability to participate in Council meetings. It is not intended to be used as a mechanism to avoid conflict of interest provisions where significant matters are likely to come before council from the provider of the invitation.
While attending events is generally considered an important function for Council Members and the CEO to represent the local government, if there are costs involved, especially significant costs, it can lead to criticism from the community for spending ratepayer’s money if the tangible benefits are not identified. Similarly, if the council is accepting tickets, including those as a result of sponsorship, there can be a perception of bias when matters affecting that organisation come before council.
The Council, with accountability to the local community, is in the best position to determine the design and content of the policy. The policy may provide authorisation for the CEO to be the decision maker where decisions align with the policy intent. In that case, the policy must set out clear criteria by which the CEO may make such determinations.”
Council Members and/or the Chief Executive Officer (CEO) are frequently invited to attend events. The invitation to the event may include free or subsidised tickets to the Event; benefits such as hospitality, entertainment, training and/or professional advice; payments in respect of attendance and/or travel contributions. If a Council Member and/or the CEO receives an invitation to attend such an event, then pursuant to the Act, this may amount to a Gift.
Section 5.62 of the Act provides, in part and in summary, that if a person provides a ‘gift’ valued at over $300 to a Council Member or CEO, that person is to be treated as being ‘closely associated’ to the Council Member or CEO whichever is relevant. To that end, the Council Member or CEO would be subject to the interest disclosure provisions of Part 5, Division 6 (Disclosure of financial interests and gifts) of the Act should a matter concerning the donor come before Council.
Amendments to s 5.62(1B) the Act now include a provision to provide for ‘Excluded Gifts’ –
“(1B) A gift is an excluded gift -
(a) if —
(i) the gift is a ticket to or otherwise relates to the relevant person’s attendance at an event as defined in section 5.90A(1); and
(ii) the local government approves, in accordance with the local government’s policy under section 5.90A, the relevant person’s attendance at the event; or
(b) if the gift is in a class of gifts prescribed for the purposes of this subsection.”
In other words, section 5.62(1B) provides that if a Gift is a ticket to, or otherwise relates to attendance at an Event, and the local government has approved the Council Member and/or the CEO’s attendance at the Event in accordance with the policy, the Gift will be an ‘Excluded Gift’.
The ‘gift’ in question comprises of:
(a) the provision of tickets to events;
(b) payments in respect of attendance[1]; and
(c) approval of attendance by the local government and criteria for approval; and
(d) any prescribed matter.
Events are defined in s5.90A(1) to include:
“(a) a concert;
(b) a conference;
(c) a function;
(d) a sporting event; and
(e) an occasion of a kind prescribed for the purposes of this definition[2].”
The consequences of being an ‘Excluded Gift’ is that the Councillor or CEO are not required to be recused from discussions or decision-making involving local government matters that relate to the donor of the ‘gift’.
If a gift is an “Excluded Gift”, then the effect of section 5.62(1A) of the Act is that a Donor who has given an “Excluded Gift” to a Council Member and/or CEO is not a person “closely associated” with the Council Member and/or CEO.
This means that if the Donor who made the “Excluded Gift” has a matter to be dealt with by the local government, the Council Member and/or the CEO will not be considered to have an interest in the matter that they must disclose. They will be able to participate in, or be present during, any discussion or decision-making procedure relating to the matter.
Council Members and the CEO still have a statutorily obligated to disclose the receipt and acceptance of a gift or Event invitation in accordance with Section 5.87A and 5.87B.
Detail
Council Members and/or the CEO have ceremonial roles and civic duties, and they are expected to attend Events in their capacity as local government officials. Council Members and/or the CEO also have duties to represent their community, and this requires them to attend Events to be informed and to be accessible to community members and stakeholders.
Hence, the purpose of an attendance at Events policy is to provide a framework whereby a local government will objectively assess the value of the Gift that is being made and whether there is benefit to the local government for a local government official to accept the Gift by attending the Event. A balance is sought to be achieved in the management of the perception of bias.
The framework in the Act to manage interests arising from Gifts operates such that not every attendance at an Event by a Council Member and/or the CEO will be a Gift that gives rise to an interest that they must disclose. For example:
· if the Gift has a value less than the prescribed amount, then the interest relating to the Gift is not required to be disclosed by the Council Member and/or CEO and they may participate in, or be present during, any discussion or decision-making procedure relating to a matter brought before the local government by the Donor; and
· if the Gift is made by a prescribed entity, then the interest relating to the Gift is not required to be disclosed. Prescribed entities include the local government, other local governments, the State and Commonwealth governments, specific local government organisations and similar entities.
If Approval to Attend an Event is granted in accordance with the Policy, then there will have been an objective assessment of the value of the Gift and the benefit to the local government for a local government official to attend an Event, hence the classification of the Gift as an “Excluded Gift”.
It is important to note that a Council Member or the CEO may still accept an invitation and attend an Event when no application for approval under the Policy was made. A Council Member and/or the CEO may also still accept an invitation and attend an Event when an application for approval was made but not granted under the Policy.
However, the consequence of a Council Member and/or the CEO accepting the invitation and attending the Event where no approval has been given in accordance with the Policy is that if attendance at the Event is a Gift, the interest relating to the Gift will need to be disclosed if the Donor has a matter that will be dealt with by City.
Consultation
Administration as part of the review process of the Policy referenced the Policy documents of other comparable local governments such as the Cities of Joondalup, Stirling and Swan and the Department of Local Government, Sport and Cultural Industries (DLGSC) Guidelines and model policy and has provided several reports to Council Members through the Forums and Council Meetings.
Council Members have been consulted and workshops held via a number of Concept Forums and requests for feedback as part of the Policy review.
Administration sought advice from the internal legal team and from external legal firms, McLeods and Jackson McDonald Lawyers who assisted in drafting the reviewed Policy (Attachment 3). A marked-up version of the Policy is available (Attachment 2). The reviewed Policy simplifies the City’s current Policy, is clear in its intent and is limited to the matters required to be dealt with under section 5.90A of the Act.
Comment
The legal advice received provided that the City’s current Policy (Attachment 1) was not compliant with s5.90A(2) of the Act in the following respects:
· 5.90A(2)(c) – Approval of attendance and criteria for approval.
· Clause 3 of the City’s current Policy contains a list of events that have been pre-approved by Council. This list was found to lack specificity and actual determination, unreasonably open ended and expressed in broad terms. No criteria or discretion has been applied towards this automatic and ‘standing’ approval, and as such this section of the Act has not been complied with. Although there is a criteria for approval listed in clause 5.1 it expressly provides that they apply “in determining approving attendance at a non-Pre-Approved Event”.
· 5.90A(2)(b) – Payments in respect of attendance
· Clause 4f) in the current Policy provides:
“f) Where a Council Member or CEO request has been approved and there is a fee associated with attending the Event, then the cost, excluding the attendance of a partner, is to be paid for by the City subject to budget.”
This paragraph, although arguably within the bounds of the wording of s5.90A(2)(b), is not what was intended by s5.90A(2)(b). The purpose of s5.90A(2)(b) is to consider the conferral of peripheral financial benefits accompanying a gift such as travel contribution in order to assess the holistic value of the ‘gift’. Clause 4f) is therefore unnecessary and is removed entirely from the draft Policy.
The revised Policy introduces additional criteria of determining if a Gift can be approved in accordance with the Policy. In addition to the Event needing to provide a benefit to the City, the value of the Gift must not be significantly greater than the consideration to be passed from the Council Member and/or the CEO to the Donor for approval to be granted.
The criteria is borrowed from the definition of ‘gift’ in s5.57 of the Act which provides:
5.57 gift means —
(a) a conferral of a financial benefit (including a disposition of property) made by 1 person in favour of another person unless adequate consideration in money or money’s worth passes from the person in whose favour the conferral is made to the person who makes the conferral.
Statutory Compliance
The reviewed Policy addresses the deficiencies as stated above and meets the prescribed requirements in Section 5.90A(2) of the Local Government Act 1995.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-C01 Compliance Framework |
Medium |
|
Accountability |
Action Planning Option |
|
General Counsel |
Manage |
|
Risk Title |
Risk Rating |
|
ST-S23 Stakeholder Relationships |
Medium |
|
Accountability |
Action Planning Option |
|
Chief Executive Officer |
Manage |
While attending events is generally considered an important function for Council Members and the CEO to represent the local government, if the value of the event invitation and any associated hospitality is significant, it can lead to criticism from the community because of the perception that:
· Council Members or the CEO are deriving significant benefit from their official roles and potentially not being able to remain impartial towards the donor; or
· Wastage of ratepayers’ money if administration elected to fund the cost of the event invitation and the tangible or intangible benefits are not properly identified.
The above risks relating to the issue contained within this report have been identified and considered within the City’s Strategic/Corporate risk register and aligns with the guidelines provided by the Department of Local Government, Sport and Cultural Industries. Policies and Procedures have been or are currently being developed to manage the risk.
Policy Implications
It is a legislative requirement to adopt by absolute majority an Attendance at Events Policy for the acceptance of invitations by Council Members and the CEO to various events and to clarify who will pay for tickets or the equivalent value of the invitation, the purpose being to enable Council Members to attend events as a representative of Council without restricting their ability to participate in Council meetings and the decision-making process.
Financial Implications
The City budgets for expenses in relation to Council Member continuing professional development as part of its annual operational funding.
Voting Requirements
Absolute Majority
|
Moved Cr Wright, Seconded Cr Herridge That Council APPROVES by ABSOLUTE MAJORITY the revised Attendance at Events Policy (Council Members and Chief Executive Officer) as shown in Attachment 3.
Carried unanimously 14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Attachments:
|
1⇩. |
Attachment 1 - Attendance at Events Policy (Council Members and CEO) |
20/1170[v2] |
|
|
2⇩. |
Attachment 2 - Attendance at Events Policy (Council Members and CEO) - Marked Up Version |
24/227014 |
|
|
3⇩. |
Attachment 3 - Attendance at Events Policy (Council Members and CEO) - Clean Version |
20/1170[v3] |
|
CE03-08/25 Establishment of Chief Executive Performance Review Committee
File Ref: 2391 – 25/266998
Responsible Officer: Chief Executive Officer
Attachments: Nil
Previous Items: 5.1 - Chief Executive Officer Performance Review Policy - Policy Review Committee - 14 Jul 2025
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To consider the establishment of a new Chief Executive Officer Performance Review Committee under section 5.8 of the Local Government Act 1995 (the Act).
Background
Under the Act, Council is responsible for the employment of the Chief Executive Officer (CEO) to manage the functions and operations of a local government. The Local Government (Administration) Regulations 1996 (the Regulations) set out the minimum standards for CEO performance reviews.
Council at its Special Policy Review Committee meeting on 14 July 2025 (Item 5.1) adopted the revised Policy and requested Administration to bring a report to the 26 August 2025 Ordinary Council Meeting to establish a Chief Executive Officer Performance Review Committee.
“That the Policy Review Committee:
1. ADOPTS the revised Chief Executive Officer Performance Review Policy as shown in Attachment 4.
2. REQUESTS that the Administration appoint Helen Hardcastle of Learning Horizon to facilitate a workshop with Council and the Chief Executive Officer to review the aspects of the Chief Executive Officer Performance Review Policy (Attachment 10) that are to be agreed between the Council and the Chief Executive Officer in accordance with clause 16(3) of the Model Standards for CEO Recruitment, Performance and Termination, and the terms of the Chief Executive Officers Employment Contract and associated matters on Tuesday 5 August 2025.
3. REQUESTS the Administration to bring a report to the 26 August 2025 Ordinary Council Meeting to establish the Chief Executive Officer Performance Review Committee.”
To comply with the recommendation 3 above, Administration have prepared this report for consideration and approval.
Detail
In accordance with section 5.8 of the Act, local governments may establish, by absolute majority, committees of three or more persons to assist the Council.
The proposed Chief Executive Officer Performance Review Committee (the Committee) will consist of five members: the Mayor and up to four other Council Members appointed by Council through an absolute majority decision. An absolute majority resolution of Council is also required to remove any Council Member from the Committee.
In accordance with section 5.12 of the Act, Council must, by absolute majority, appoint a Presiding Member and a Deputy Presiding Member at an Ordinary Council Meeting.
These appointments will be for a two-year term and are to be re-elected following each ordinary local government election (or an extraordinary election, where applicable), unless the appointed member ceases to hold office, resigns from the Committee, or the Committee is disbanded, as per section 5.11 of the Act.
The quorum for Committee meetings shall be a simple majority of the total number of members.
Consultation
Internal consultation was undertaken with Legal and Governance Services to ensure that the establishment of the Chief Executive Officer Performance Review Committee is consistent with the Local Government Act 1995, the Local Government (Administration) Regulations 1996, and the City’s policy framework.
Further reference was made to best practice guidance from WALGA and the Department of Local Government in relation to CEO performance review processes.
Comment
The establishment of the Committee reflects the City's commitment to strong governance, transparency, and compliance with the Model Standards for CEO Recruitment, Performance and Termination. The Committee will provide a structured and consistent approach to managing the recruitment, performance appraisal, and employment matters related to the CEO.
The proposed composition of the Committee ensures broad representation while maintaining a manageable and effective Committee. The inclusion of training requirements supports informed participation and aligns with sector expectations for capability in CEO oversight.
Establishing this Committee will also support continuous improvement in the CEO performance management process and enhance Council’s ability to meet its legislative obligations and strategic leadership role.
Subject to Council's endorsement of the Committee’s establishment, Administration will prepare a subsequent report for Council’s consideration of the Committee’s Terms of Reference.
Statutory Compliance
Section 5.12, 5.8 and Schedule 9.3, Division 7, clause 67(2) and clause 67(3) of the Local Government Act 1995.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.2 - Responsibly and ethically managed
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
There are no existing Strategic or Corporate risks within the City's existing risk registers which relate to the issues contained in this report.
Policy Implications
The Committee will be required to operate in accordance with the provisions of the Ordinary Council Meeting and Forums of Council Policy.
Financial Implications
Nil
Voting Requirements
Absolute Majority
|
Moved Cr Rowe, Seconded Cr Berry That Council APPROVES by ABSOLUTE MAJORITY the establishment of the Chief Executive Officer Performance Review Committee in accordance with section 5.8 of the Local Government Act 1995.
Carried unanimously 14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
Attachments: Nil
Cr Figg declared an indirect financial interest in CE04-08/25 due to being an employee of the Minister for Local Government in portfolios separate to the Local Government portfolio.
Cr Figg left the meeting, the time being 9:55pm.
File Ref: 2391 – 25/267651
Responsible Officer: Chief Executive Officer
Attachments: 2
Previous Items: MN05-02/25 - Cr Miles - Review of District Boundaries - Ordinary Council - 25 Feb 2025
Changes to Report and Additional Information Arising from Agenda Briefing
Additional information under Comment
Council Members in Western Australia are regarded as part-time, similar to those in New South Wales and Victoria, whereas in Queensland, Council Members serve in a full-time capacity.
Council Member Query
1. Can the rationale for the decrease in the forecasted population in the South Ward shown in attachment 2 be provided.
Response – The City of Wanneroo population and household forecasts are undertaken by .id, informed decisions, on behalf of the City of Wanneroo - https://forecast.id.com.au/wanneroo.
During the forecast modelling process, .id assesses what is driving population change in the area and forecasts how the age structure will change as a result.
There are two ways in which populations can change, through net migration and/or through natural increase (births minus deaths). Some areas are more driven by one or other of these factors. Migration is largely driven by housing development, whereas natural increase is a function of the age of the population.
.id works closely with the City of Wanneroo to obtain detailed information about current and planned residential development activity and the forecasts are updated on a rolling cycle to take into account changes in the real world.
The forecasts were last updated in March 2024. Forecasts are available for the City of Wanneroo and small areas for each year from 2021 to 2046.
The forecast age groups of the City of Wanneroo is a function of the current age of the population (people aging each year, being born and dying) as well as the age of people migrating into and out of the area. This in turn is driven by location (fringe, city centre, regional or rural) the existing housing stock (separate dwellings, medium or high density), the amount and type of new residential development (same as existing stock, or diversifying) and where the area is in a cycle of change.
No major development sites have been identified in Koondoola, Alexander Heights or Marangaroo in the 20 year forecast but there are assumed infill rates of 4-8 dwellings per year to 2046. Girrawheen has 4 major development sites identified during the forecast period as well as assumed infill rates of 9-10 dwellings per year to 2046.
Details of the residential development assumptions can be found here:
Girrawheen Residential Development Assumptions
Koondoola Residential Development Assumptions
Alexander Heights Residential Development Assumptions
Marangaroo Residential Development Assumptions
In summary, the dwelling numbers in these suburbs increase during the 20 year forecast period, however, due to net migration and/or through natural increase (births minus deaths), the total population will decrease slightly.
Issue
To consider the proposal for a review of the City of Wanneroo districts.
Background
Since its 1998 establishment and delineation of boundaries, the former Shire and subsequently City of Wanneroo (the City) has experienced rapid growth resulting in significant demographic, economic and social change. The information used to inform the decisions that established the boundaries of the district has therefore changed.
Council at its 25 February 2025 Ordinary Council Meeting (MN05-02/25) approved the Motion on Notice raised by Cr Miles:
“That Council:-
1. REQUESTS Administration to develop a proposal for a review of the district’s boundaries; and
2. REQUESTS Administration to present a report detailing the proposal to Council no later than the August 2025 Ordinary Council Meeting.”
Detail
A local government district’s boundaries are among its most important attributes, contributing significantly to its character, culture, viability, and identity. Accordingly, the process of proposing, scrutinising and implementing changes to a district’s boundaries is rigorous and transparent.
Among the responsibilities of a local government under the Local Government Act 1995 (the Act) is to “promote the economic, social and environmental sustainability of the district” section 3.1(1A)(i). Ensuring that the district is appropriately constituted to meet these priorities is therefore a function of local government.
· A proposal is submitted to the Local Government Advisory Board (Board). This may originate with the Minister, one or more affected local governments, or a group of electors.
· The proposal is considered by the Board who will either make a recommendation to the Minister to reject the proposal or initiate a formal enquiry.
· The inquiry will be conducted in compliance with the Act, including notices and the opportunity for public submissions.
· At the conclusion of the inquiry, the Board will make a written report to the Minister recommending either that the proposal be rejected or that an order be made (which may be in accordance with the proposal or may differ from it).
Additional steps can include public hearings, a poll of affected electors, the making of recommendations in respect of naming, wards and representation, assessment of any compensation that may be required, (if the proposal is accepted) the making of transitional arrangements, and other actions arising depending on the specifics of the proposal.
The factors that will be considered in assessing a proposal to change a district’s boundaries will include but are not limited to:
· Community of interests;
· Physical and topographical features;
· Demographic trends;
· Economic factors;
· The history of the area;
· Transport and communication;
· Matters affecting the viability of local governments; and
· The effective delivery of local government services.
The Board provides guidelines (Attachment 1) clarifying each of these factors.
The structure and boundaries of the City of Wanneroo were examined in detail as part of the State Government’s Local Government Reform program in 2011/2012, with a submission being made to the Metropolitan Local Government Review Panel in January 2012. The conclusion of this submission, endorsed by Council, was that the ongoing growth within the district was best addressed by a single integrated local authority having the resources, expertise, and capacity to implement a consistent set of strategies across the district.
Noting the range of factors that apply, as well as the range of stakeholders who will need to be consulted and informed, Administration assesses that planning and undertaking a comprehensive review of the district’s boundaries will require significant resource from every part of the organisation. It is recommended that an assessment of the required resource, along with likely costs and timescales, and the potential impact on other initiatives and operations, be undertaken prior to committing to a review.
A limited review of locality (suburb) boundaries within the City is already in planning, with the recruitment of a Project Officer to progress this work being considered for the 2025/26 Workforce Plan. This limited scope review is proposed to assess the options for addressing those localities that currently or in future projections will exceed the optimal sizing established by the Geographic Names Committee (GNC) Policies and Standards for Geographical Naming in Western Australia (GNC Standard) and could provide input to a district-wide review.
Administration further recommends that any proposal affecting neighbouring local governments should be developed and presented as a joint proposal.
Reports into three previous inquiries taking place within the last ten years are published on the Board’s page within the Department of Local Government, Industry Regulation and Safety (DLGIRS) website: Lower Donnelly River (Shires of Nannup and Manjimup); Cockburn, Fremantle; and Wattle Grove. All three proposals were rejected following inquiry.
Any proposal for a change to the district’s boundaries should, as far as possible, be expected to be enduring. Council should take into account the ongoing active development of major areas of the City and consider whether a district boundary change during this period of development and rapid change is appropriate, or whether the City should be allowed to reach a more stable state before its boundaries, communities, economic and social features and relationships with neighbouring districts are assessed and alterations proposed.
Consultation
Throughout the consultation undertaken it has become evident a large project of work would need to be undertaken in developing a proposal to the Advisory Board. The City sought external legal advice from McLeod’s Lawyers and it was suggested the City undertake a preliminary review to obtain further information in order to assess whether a proposal to the Advisory Board should be developed.
The City’s Economic Development team have provided forecast population and four different scenarios (Attachment 2). The team also prepared the Australian Bureau of Statistics latest estimated resident population data for local government areas in Australia as at 30 June each census year with annual updates provided for Local Government area’s (LGA’s).
The following table outlines the City of Wanneroo compared with other Australian LGA’s:
|
STATE |
LGA name (a) |
2023 |
2024 |
Growth |
Rank (size) |
Rank (growth) |
|
QLD |
Brisbane |
1,323,481 |
1,355,640 |
32,159 |
1 |
1 |
|
QLD |
Gold Coast |
666,108 |
681,389 |
15,281 |
2 |
2 |
|
QLD |
Moreton Bay |
510,063 |
522,494 |
12,431 |
3 |
7 |
|
NSW |
Blacktown |
426,075 |
438,843 |
12,768 |
4 |
6 |
|
VIC |
Casey |
392,060 |
405,415 |
13,355 |
5 |
4 |
|
QLD |
Logan |
377,724 |
392,339 |
14,615 |
6 |
3 |
|
NSW |
Canterbury-Bankstown |
379,733 |
385,242 |
5,509 |
7 |
19 |
|
QLD |
Sunshine Coast |
365,936 |
375,328 |
9,392 |
8 |
8 |
|
NSW |
Central Coast (NSW) |
351,900 |
354,803 |
2,903 |
9 |
22 |
|
VIC |
Wyndham |
324,061 |
337,009 |
12,948 |
10 |
5 |
|
VIC |
Greater Geelong |
282,787 |
289,565 |
6,778 |
11 |
15 |
|
NSW |
Parramatta |
269,095 |
274,956 |
5,861 |
12 |
17 |
|
VIC |
Hume |
262,741 |
271,709 |
8,968 |
13 |
9 |
|
NSW |
Northern Beaches |
267,899 |
270,772 |
2,873 |
14 |
23 |
|
QLD |
Ipswich |
251,105 |
259,886 |
8,781 |
15 |
10 |
|
NSW |
Liverpool |
247,607 |
254,905 |
7,298 |
16 |
13 |
|
VIC |
Whittlesea |
245,013 |
253,204 |
8,191 |
17 |
11 |
|
NSW |
Cumberland |
245,236 |
252,399 |
7,163 |
18 |
14 |
|
WA |
Stirling |
244,155 |
249,872 |
5,717 |
19 |
18 |
|
NSW |
Sutherland |
234,994 |
238,614 |
3,620 |
20 |
21 |
|
WA |
Wanneroo |
229,602 |
237,628 |
8,026 |
21 |
12 |
|
NSW |
Sydney |
231,127 |
237,278 |
6,151 |
22 |
16 |
|
NSW |
Penrith |
224,430 |
228,661 |
4,231 |
23 |
20 |
|
NSW |
Wollongong |
219,117 |
221,894 |
2,777 |
24 |
24 |
|
NSW |
Lake Macquarie |
219,231 |
221,859 |
2,628 |
25 |
25 |
Source: Source: Australian Bureau of Statistics, Regional population 2023-24 financial year
The data indicates that the City of Wanneroo at 30 June 2024 ranked 21 in Australia for population by LGA. Of the top 25 LGA’s by population, the City of Wanneroo ranked 12 for annual growth over the year to 30 June 2024.
The City of Stirling is still larger by population; however, the City of Wanneroo is growing by a larger number of people per annum and at these current growth levels, the City of Wanneroo will have a larger population than the City of Stirling by 2030.
Comment
The City continues to experience high rates of population growth and urban development, resulting in increased service demand, complexity in infrastructure planning, and the need to ensure equitable representation and identity across communities. A review of district boundaries, while significant in scope, may present an opportunity to reassess whether the City's current configuration remains optimal for long-term strategic planning, service delivery, and governance.
Given the scale of the work involved and the implications for neighbouring local governments, residents, and the broader metropolitan region, a staged approach is considered prudent. An initial step to engage in preliminary discussions with the Minister for Local Government and the Local Government Advisory Board (LGAB) may assist in determining the viability of progressing a formal boundary change proposal and provide early insight into the LGAB's expectations.
A key consideration is the timing of any such review relative to the City's current rate of change. Undertaking a district boundary review during a period of rapid development may risk misalignment with future settlement patterns and infrastructure investments. Therefore, further work is required to assess whether current conditions support an enduring and well-justified proposal.
Statutory Compliance
Schedule 2.1 of the Local Government Act 1995, which governs the process for creating, changing, or abolishing districts.
The LGAB is the statutory body responsible for assessing such proposals and making recommendations to the Minister for Local Government.
Any proposal submitted must address the Board’s guiding principles and satisfy the procedural requirements under the Act.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
There are no existing Strategic or Corporate risks within the City's existing risk registers which relate to the issues contained in this report.
Policy Implications
Nil
Financial Implications
At this preliminary stage, financial implications are limited to internal officer time, engagement with stakeholders, and the preparation of supporting information. Should Council endorse further work to develop a formal proposal, a detailed cost estimate will be prepared, including potential resourcing requirements (e.g. project officer recruitment), community consultation, external legal or strategic advice, and mapping or demographic analysis.
Funding requirements will be considered as part of the mid-year budget review or incorporated into the 2025/26 Annual Budget process, as required.
Voting Requirements
Simple Majority
|
Moved Cr Miles, Seconded Cr Wright That Council:-
1. RECEIVES the preliminary assessment undertaken by Administration regarding the process and considerations for a review of the City of Wanneroo’s district boundaries; 2. AUTHORISES the Chief Executive Officer and the Mayor to initiate preliminary discussions with the Minister for Local Government and the Local Government Advisory Board regarding the feasibility and appropriateness of a potential district boundary review; and 3. REQUESTS the Chief Executive Officer to prepare a further report for Council consideration on the outcome of preliminary discussions and a proposed scope, resource plan, and timeline for any potential future proposal.
Substantive Motion as Amended
At the request of Cr Miles and with the consent of the seconder, Recommendation 3 was amended by inserting the underlined words as follows:
That Council:-
1. RECEIVES the preliminary assessment undertaken by Administration regarding the process and considerations for a review of the City of Wanneroo’s district boundaries; 2. AUTHORISES the Chief Executive Officer and the Mayor to initiate preliminary discussions with the Minister for Local Government and the Local Government Advisory Board regarding the feasibility and appropriateness of a potential district boundary review; and 3. REQUESTS the Chief Executive Officer to prepare a further report for Council consideration on the outcome of preliminary discussions and a proposed scope, resource plan, and timeline for any potential future proposal including an option to establish a new local government in the northern suburbs.
The substantive motion as amended was put and
10/3
For the motion: Mayor
Aitken, Cr Coetzee, Cr Figg, Cr Herridge, Cr Miles,
Against the motion: Cr Bedworth, Cr Berry and Cr Nguyen |
Attachments:
|
1⇩. |
Attachment 1 - Information Sheet - LGAB Guiding Principles - Schedule 2.1 Create, Change or Abolish a Local Government District |
25/57471 |
|
|
2⇩. |
Attachment 2 - District Review - 2025 - Wanneroo Forecast Population - Split Scenarios |
25/275476 |
|
Cr Rowe declared a financial interest in CE05-08/25 due to being a delegate of NGAA Conference and seeking re-imbursement.
Cr Figg returned to the meeting, the time being 10:00pm
Cr Rowe left the meeting, the time being 10:00PM
Cr Bedworth left the meeting, the time being 10:08PM
File Ref: 2391 – 25/277894
Responsible Officer: Chief Executive Officer
Attachments: 3
Previous Items: CE01-06/25 - **National Growth Areas Alliance (NGAA) Membership 2025/26 - Ordinary Council - 24 Jun 2025
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To endorse Councillor Rowe’s attendance at the National Growth Areas Alliance (NGAA) 2025 National Congress held in Perth, from 29 July to 1 August 2025.
Background
Councillor Rowe expressed an interest in attending the NGAA 2025 National Congress as the City of Wanneroo’s member delegate as approved by Council at its meeting on 24 June 2025 (CE01-06/25).
“That Council:-
2. NOMINATES the following Council Members as the City’s National Growth Areas Alliance Member Delegate and Strategic Advisory Group Nominee:
a) Member Delegate: Deputy Mayor Rowe; and
b) Strategic Advisory Group Nominee: Deputy Mayor Rowe.”
The NGA conference website provides the details of the conference and a copy of the program is available at Attachment 3.
The NGAA National Congress is the premier national event dedicated to the challenges and opportunities facing Australia’s outer metropolitan growth areas. It brings together elected members, executive leaders, senior staff, and thought leaders from all levels of government, academia, and industry to share insights, solutions and strategies that shape policy and investment in growth areas.
This year’s event, hosted in Perth by the City of Cockburn and the City of Gosnells, offering inspiring site tours, keynote sessions, and vibrant networking opportunities.
Detail
Under Clause 6.5 of the City’s current Council Member Continuing Professional Development Policy (Attachment 1) Council Members under during the last three months of the Council Members term of office need Council approval to attend professional conferences, education or speaking engagements. Councillor Rowe is in his last three months of his term of office, his term expires at the 2025 Local Government Elections in October.
“6.5 Any requests from Council Members to attend professional conferences, education or speaking engagements that will be held within the last three months of a Council Members term of office, will be referred to Council for consideration. To clarify, the date for which this clause shall take effect will be the date for which the professional conferences, education or speaking engagement commences.”
If a Council Member wishes to attend a professional conference, education or speaking engagement within the last three months of their term of office the request is to be referred to Council for consideration.
Councillor Rowe has independently booked and paid for his attendance at the 2025 National Congress (Attachment 2), as the event has taken place prior to the next available Ordinary Council Meeting. Should Council approve his attendance, Administration will arrange reimbursement accordingly.
Consultation
Nil
Comment
Professional conference attendance is subject to sufficient funds being available in the Member Professional Conference Allowance. However, section 3.2 of the Policy states that:-
“Attendance by a Member at conferences or meetings listed in 3.1(iii) through 3.1(vii) inclusive will not be subject to CEO approval or the Member Professional Conference Allowance (CMPCA). For clarity, the City will meet costs associated with Members attending those conferences and/or meetings.”
The NGAA is listed as in section 3.1 “vii. Relevant to the National Growth Area Alliance” and is therefore exempt from the requirement of the CMPCA.
Nonetheless, the requirement for Council to consider the attendance of Councillor Rowe is required under clause 6.5 of the Policy.
The Administration receives various requests throughout the year from Council Members to participate in Continuing Professional Development opportunities. Each request is considered against Policy requirements and attendance is authorised if appropriate.
The Administration maintains a record of Council Member participation and expenditure incurred for training and professional development. Section 5.127 of the Local Government Act 1995 requires that a report on training completed by Council Members in each financial year is to be published on the City’s website. In accordance with Council’s resolution CS02-03/23, that report also includes all details (inclusive of appropriate costs) for Council Member attendance at conferences, education and speaking engagements being published on the City’s website annually.
Statutory Compliance
Nil
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
There are no existing Strategic or Corporate risks within the City's existing risk registers which relate to the issues contained in this report.
Policy Implications
Council Member Continuing Professional Development Policy states that:
“Any requests from Council Members to attend professional conferences, education or speaking engagements that will be held within the last three months of a Council Members term of office, will be referred to Council for consideration. To clarify, the date for which this clause shall take effect will be the date for which the professional conferences, education or speaking engagement commences.”
Financial Implications
The 2025 National Congress registration expenses are $900.00 plus allowance for food, beverage and taxi fares to cover the following:
· Perth Growth Areas Site Tour - 29 July 2025
· Sunset Networking Dinner and Drinks – 1 August 2025
· Congress Day – 31 July 2025
Voting Requirements
Simple Majority
|
Moved Cr Wright, Seconded Cr Figg
To put item CE05-08/25 Council Member Attendance at the National Growth Areas Alliance 2025 National Congress to the vote.
CARRIED 11/2
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Cr Miles and Cr Nguyen |
|
Moved Cr Miles, Seconded Cr Berry That Council: 1) CONSIDERS and APPROVES, in accordance with clause 6.5 of the Council Member Continuing Professional Development Policy, the attendance of Councillor James Rowe at the 2025 National Growth Areas Alliance National Congress held in Perth from 29 July to 1 August 2025; and 2) AUTHORISES Administration to reimburse Councillor Rowe for the registration expenses associated with his attendance at the 2025 National Growth Areas Alliance National Congress, as detailed in Attachment 2.
12/1
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Cr Nguyen |
Attachments:
|
1⇩. |
Attachment 1 - Council Member Continuing Professional Development Policy - Current Version |
20/231812[v3] |
|
|
2⇩. |
Attachment 2 - NGAA 2025 National Congress Receipt - Cr Rowe |
25/278013 |
|
|
3⇩. |
Attachment 3 - NGAA 2025 Congress Program |
25/278016 |
|
Cr Smith declared an impartiality interest in CE06-08/25 due to being a member of the Western Australia Local Government Association State Council and one of the persons referenced in the item to attend the conference.
Cr Bedworth returned to the meeting, the time being 10:11PM
Cr Rowe returned to the meeting, the time being 10:14PM
File Ref: 2391 – 25/278119
Responsible Officer: Chief Executive Officer
Attachments: 2
Changes to Report and Additional Information Arising from Agenda Briefing
Additional information under Issue
The Administration have received a request from Cr Bronwyn Smith to attend the Western Australia Local Government Association (WALGA) Local Government Convention 2025 as a WALGA State Council Delegate.
Additional information under Background
Cr Smith has been offered a ticket to the WALGA Local Government Convention 2025 (2025 Convention) in her capacity as a WALGA State Council Member. There would be no cost to the City for Cr Smith to attend the 2025 Convention. However, as Cr Smith is currently in the final three months of her term, which expires at the 2025 Local Government Elections in October and under the current Council Member Continuing Professional Development Policy (Policy) Cr Smith’s attendance requires Council approval under clause 6.5 of the Policy.
Additional information under Comment
Cr Smith is a WALGA North Zone Delegate, elected by the City of Wanneroo as one of their delegates, she was then elected to be a delegate on the WALGA State Council.
Updated Recommendation
Recommendation updated to include approval for Cr Smith to attend the 2025 Convention.
Recommendation
That Council CONSIDERS and APPROVES, in accordance with clause 6.5 of the Council Member Continuing Professional Development Policy, the attendance to the Western Australia Local Government Association Local Government Convention 2025 to be held in Perth from 22 to 24 September 2025 of the following Council Members:
1. Cr Natalie Herridge; and
2. Cr Bronwyn Smith.
Issue
To consider an expression of interest received from Councillor Natalie Herridge to attend the Western Australia Local Government Association (WALGA) Local Government Convention 2025 to be held in Perth, from 22 to 24 September 2025.
Background
Councillor Natalie Herridge expressed an interest in attending the WALGA 2025 Convention on 25 July 2025 and her application was assessed by Administration under the current Council Member Continuing Professional Development Policy (Policy).
The WALGA website provides the details of the convention and a copy of the program is available at Attachment 2.
The 2025 theme ‘Lean into Legacy’ delves into how the decisions we make today form the building blocks for tomorrow. With a focus on reflective, current and future legacy, we will explore how leaving a lasting, positive legacy as a Local Government means making choices that endure far beyond election cycles.
Detail
In accordance with clause 6.5 of the City’s current Policy (Attachment 1), Administration is not permitted to book any professional conferences, education, or speaking engagements for Council Members during the final three months of their term of office. Councillor Natalie Herridge is currently in the final three months of her term, which expires at the 2025 Local Government Elections in October.
“6.5 Any requests from Council Members to attend professional conferences, education or speaking engagements that will be held within the last three months of a Council Members term of office, will be referred to Council for consideration. To clarify, the date for which this clause shall take effect will be the date for which the professional conferences, education or speaking engagement commences.”
If a Council Member wishes to
attend a professional conference, education or speaking engagement within the
last three months of their term of office the request is to be referred to
Council for consideration. Administration have prepared this report for
Council to consider
Cr Natalie Herridge’s request.
Consultation
Nil
Comment
Professional conference attendance is subject to sufficient funds being available in the Member Professional Conference Allowance. However, section 3.2 of the Policy states that:-
“Attendance by a Member at conferences or meetings listed in 3.1(iii) through 3.1(vii) inclusive will not be subject to CEO approval or the Member Professional Conference Allowance (CMPCA). For clarity, the City will meet costs associated with Members attending those conferences and/or meetings.”
The WALGA conference is listed as in section 3.1 “iii. is convened by the Western Australian Local Government Association (WALGA) including the Convention;” and is therefore exempt from the requirement of the CMPCA.
Nonetheless, the requirement for Council to consider the attendance of Councillor Natalie Herridge is required under clause 6.5 of the Policy.
The Administration receives various requests throughout the year from Council Members to participate in Continuing Professional Development opportunities. Each request is considered against Policy requirements and attendance is authorised if appropriate.
The Administration maintains a record of Council Member participation and expenditure incurred for training and professional development. Section 5.127 of the Local Government Act 1995 requires that a report on training completed by Council Members in each financial year is to be published on the City’s website. In accordance with Council’s resolution CS02-03/23, that report also includes all details (inclusive of appropriate costs) for Council Member attendance at conferences, education and speaking engagements being published on the City’s website annually.
Statutory Compliance
Nil
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
There are no existing Strategic or Corporate risks within the City's existing risk registers which relate to the issues contained in this report.
Policy Implications
Council Member Continuing Professional Development Policy states that:
“Any requests from Council Members to attend professional conferences, education or speaking engagements that will be held within the last three months of a Council Members term of office, will be referred to Council for consideration. To clarify, the date for which this clause shall take effect will be the date for which the professional conferences, education or speaking engagement commences.”
Financial Implications
The full delegate registration cost of $1,250 for the WALGA Local Government Convention 2025 and would be covered by the City’s operational budget.
Voting Requirements
Simple Majority
|
Moved Cr Herridge, Seconded Cr Wright That Council CONSIDERS and APPROVES, in accordance with clause 6.5 of the Council Member Continuing Professional Development Policy, the attendance to the Western Australia Local Government Association Local Government Convention 2025 to be held in Perth from 22 to 24 September 2025 of the following Council Members: 1. Cr Natalie Herridge; and 2. Cr Bronwyn Smith.3. Substantive Motion as Amended
At the request of Cr Herridge
and with the consent of the seconder, to remove That Council CONSIDERS and APPROVES, in accordance with clause 6.5 of the Council Member Continuing Professional Development Policy, the attendance to the Western Australia Local Government Association Local Government Convention 2025 to be held in Perth from 22 to 24 September 2025 of the following Council Members: 1. Cr Bronwyn Smith.3. The substantive motion as amended was put and Carried Unanimously 13/1
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Cr Nguyen |
Attachments:
|
1⇩. |
Attachment 1 - Council Member Continuing Professional Development Policy |
20/231812[v3] |
|
|
2⇩. |
Attachment 2 - WALGA 2025 Convention Program |
25/278132 |
|
CE07-08/25 **Review of Council Members' Fees, Allowances, Reimbursements and Benefits Policy
File Ref: 2391 – 25/302766
Responsible Officer: Chief Executive Officer
Attachments: Nil
Previous Items: CE01-09/24 - Extension of Review Dates of Council Policies - Ordinary Council - 10 Sep 2024
3.1 - Review of the Council Members Fees, Allowances, Reimbursements and Benefits Policy and Related Policies - Concept Forum - 04 Feb 2025 Special Concept Forum
CE02-03/25 - Extension of Review Dates of Council Policies - Ordinary Council - 25 Mar 2025
CE05-03/25 - Update on Resolution MN01-12/24 – Councillor Bedworth – Accommodation for Councillor Clinics - Ordinary Council - 25 Mar 2025
3.1 - Review of Council Members’ Fees, Allowances, Reimbursements and Benefits Policy - Concept Forum - 01 Jul 2025
Changes to Report and Additional Information Arising from Agenda Briefing
The report has been withdrawn and scheduled for presentation at the Concept Forum on 7 October 2025 for further consideration.
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Cr Bedworth declared an impartiality interest in MN01-08/25 due to being an employee of Main Roads Western Australia.
Item 9 Motions on Notice (continued)
File Ref: 44052V002 – 25/280932
Author: Cr Helen Berry
Action Officer: Director Assets
Disclosure of Interest: Nil
Attachments: 1
Changes to Report and Additional Information Arising from Agenda Briefing
This report was not presented or discussed at Agenda Briefing.
Issue
To consider the installation of ‘Shared Zone signs’ at the entrances to the Anchorage Drive Shopping area in Mindarie.
Background
Anchorage Drive is very busy with a shopping area incorporating the very popular Basils Fine Foods, a bottle shop, petrol station, dentist, doctors, chemist, pool shop, take away food outlets and more. This area also has a Keiki Early Learning Centre. The location of the shopping area and its’ associated crossovers is shown as Attachment 1.
Detail
Two local residents were attempting as pedestrians to cross one of the driveway crossings at the Anchorage Drive Shops when a vehicle failed to stop. The pedestrians were verbally and physically abused and were left in shock.
Consultation
Many Ratepayers have approached me over time regarding this issue, including the two residents from the most recent incident.
Comment
This area is very busy with many pedestrians of all ages and there is no current signage informing vehicles to give way to pedestrians, and additional signage may assist in improving the safety of pedestrians.
An example of the sign required is shown below:

Statutory Compliance
Main Roads WA is the responsible state authority for the installation, removal and maintenance of all regulatory signage and line marking in Western Australia.
The requirement for a driver entering or exiting land abutting the road using a crossover to give way to a pedestrian is governed by the Road Traffic Code 2000.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
5 ~ A well planned, safe and resilient City that is easy to travel around and provides a connection between people and places
5.4 - People can move around easily
Risk Appetite Statement
In pursuit of strategic objective goal 5, we will accept a Medium level of risk, extended to High in the areas of Community / Reputation & Financial / Commercial impacts. Shifting transport modes and usage in the City may require short term pain for longer term gain as the City supports the development, maintenance and connection of alternatives to car use (e.g. cycle ways) and the supporting infrastructure.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-023 Safety of Community |
Medium |
|
Accountability |
Action Planning Option |
|
Director Community & Place |
Manage |
Policy Implications
Financial Implications
Installation costs are considered minor in nature. Minor signage installations throughout the year are funded from the City’s annual maintenance operational budget.
Voting Requirements
Simple Majority
|
Moved Cr Berry, Seconded Cr Bedworth That Council REQUESTS Administration to submit a proposal to Main Roads WA seeking the installation of Shared Zone Signage at all entrances of the Anchorage Drive shopping area.
11/3
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Cr Herridge, Cr Parker and Cr Rowe |
All statutory and regulatory signage within the road reserve is required to be approved by Main Roads WA (MRWA). The requirement for drivers to give way to pedestrians at a property crossover is governed by the Road Traffic Code 2000. MRWA has a long-held position that they do not approve the installation of signs to advise motorists of regulations contained within the Road Traffic Code.
MRWA considers that an over-proliferation of signage creates not only visual pollution, but can also lead to a general ambivalence to road signage and its inherent message; thus reducing the efficacy of more important regulatory signage that is essential for maintaining road safety.
Other than a sign advising motorists to give way to pedestrians at traffic signals, there are no approved signs advising motorists of the requirement to give way to pedestrians on crossovers, as this is a requirement of the Road Traffic Code.
The Road Traffic Code allows a road to be signed and designated as a Shared Zone, where pedestrians have priority, such as that recently implemented in Rocca Way in the Wanneroo Town Centre, however this cannot only apply to a footpath within a road reserve.
Notwithstanding this, Administration can request Main Roads WA for approval to install non-standard signs to advise motorists of the requirement to give way to pedestrians, however the MRWA is less likely to accept such a request.
Alternatively, this type of sign could be installed by the businesses within the shopping centre boundaries as MRWA approval is not required for signs on private property.
Attachments:
|
1⇩. |
Attachment 1 Location Plan Anchorage Drive Crossovers |
25/291931 |
|
Cr Bedworth declared an impartiality interest in MN02-08/25 due to being an employee of Main Roads Western Australia.
File Ref: 44052V002 – 25/280834
Author: Cr Helen Berry
Action Officer: Director Assets
Disclosure of Interest: Nil
Attachments: 1
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To consider urgently progressing the design of a crossing facility for Anchorage Drive, Mindarie.
Background
On 2 September 2021, an 83-year-old resident met with a fatal crash on Anchorage Drive, Mindarie. Prior to this a 10-year-old boy was also fatally injured while crossing the road in 2000. After this latest death, a family member of the deceased resident launched a campaign to have a pedestrian crossing installed. The City of Wanneroo administration was aware of the online petition and campaign; and advised at the time that it had carried out a detailed video assessment of traffic and pedestrian activity and had requested Main Roads Western Australia (MRWA) to consider installing a push button signalised crossing on Anchorage Drive.
Detail
Anchorage Drive is very busy with a shopping area incorporating the very popular Basils Fine Foods, a bottle shop, petrol station, dentist, doctors, chemist, pool shop, take away food outlets and more. This area also has a Keiki Early Learning Centre. All the local schools are situated on the North side of Anchorage Drive which means all the school children cross this busy road to attend school, with no protected crossing point provided. There are no schools within the Catalina Development or to the south of Anchorage Drive for Mindarie residents as the below map shows:

This area has seen significant growth with the development of Catalina. The City is a member council of Catalina Regional Council and has seen significant benefit from that membership. The City needs to invest some of that benefit back in the local community and provide a safe pedestrian crossing for the community of Catalina and Mindarie residents living on the opposite side of Anchorage Drive to the local amenities.
It has been 4 years since administration agreed to work on this necessary crossing with Main Roads WA. The speed limit further along the road near the Mindarie Marina has recently been lowered from 60kmh to 50kmh but the section where children cross for schools and residents cross to access the local amenities remains at 60kmh.
In July 2025, I requested Administration for further information relating to the crossing as there have been several near misses, and was advised that the project is still progressing with Main Roads WA who have a 3-stage process:
· Stage 1 - Getting MRWA to agree to a crossing proposal for Anchorage Drive.
· Stage 2 - The city providing a detailed design proposal to MRWA.
· Stage 3 – Once the detailed design is approved by MRWA civil works and electrical design is completed.
Consultation
I have received many requests from the community for the provision of a crossing facility at this location on Anchorage Drive, Mindarie.
Comment
In response to my enquiries, administration has provided the following update:
· Stage 1 - The proposal for a signalised mid-block pedestrian crossing on Anchorage Drive east of Rothesay Heights currently has approval from MRWA;
· Stage 2 is awaiting on the City to provide a detailed concept design to MRWA for their approval; and
· The project construction could commence in 2026/27 and possibly be completed in 2027/28 with administration investigating funding via a Blackspot Grant. In the interim, the project has been placed in the City’s capital works programme as a fully municipal funded project for 2029/30.
In the meantime, there remains no safe crossing point for residents to cross Anchorage Drive to access community facilities. From the City being asked in 2021 and commenting something was being done, it is proposed currently that without Blackspot Funding this crossing could wait until 2029/2030 which is an 8/9 year wait. This needs to be addressed now as a road safety issue as:
· Catalina is still growing;
· There are no facilities currently south of Anchorage Drive for Mindarie residents;
· There are no schools proposed for Catalina Beachside;
· The speed limit remains for this section of Anchorage Drive as 60kmh; and
· Traffic volumes and pedestrian volumes have increased and the community deserve to be able to cross this busy road safely.
Statutory Compliance
Main Roads WA is the responsible state authority for the installation, removal and maintenance of all traffic signals and associated regulatory signage and line marking in Western Australia. Therefore, the installation of traffic signals as outlined in this report requires the approval of Main Roads WA.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
5 ~ A well planned, safe and resilient City that is easy to travel around and provides a connection between people and places
5.4 - People can move around easily
Risk Appetite Statement
In pursuit of strategic objective goal 5, we will accept a Medium level of risk, extended to High in the areas of Community / Reputation & Financial / Commercial impacts. Shifting transport modes and usage in the City may require short term pain for longer term gain as the City supports the development, maintenance and connection of alternatives to car use (e.g. cycle ways) and the supporting infrastructure.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-023 Safety of Community |
Medium |
|
Accountability |
Action Planning Option |
|
Director Community & Place |
Manage |
Policy Implications
The approval process for the installation of Signal Controlled Pedestrian Crossings is under the control of Main Roads WA as detailed in the document “Guidelines for Pedestrian Crossing Facilities at Traffic Signals”
guidelines-for-pedestrian-crossing-facilities-at-traffic-signals-v2.pdf.
Financial Implications
The likely cost of the traffic signal installation is approximately $500,000, although this will be dependent on the requirement to undertake lighting improvements and service relocations. This cannot be determined until the final layout of the signal installation is approved as part of the Stage 2 application process.
A Black Spot funding application can only be made once Stage 2 approval is given for the traffic signals.
Voting Requirements
Simple Majority
|
Moved Cr Berry, Seconded Cr Bedworth That Council:-
REQUESTS Administration to undertake the design of a signal-controlled crossing point in Anchorage Drive, Mindarie and liaise with MRWA on a priority basis to achieve the commencement of construction during 2026/27.
6/8
For the motion: Mayor Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Nguyen and Cr Smith
Against the motion: Cr
Figg, Cr Herridge, Cr Miles, Cr Moore, Cr Parker, Cr Seif, |
A location plan for the proposed signal-controlled pedestrian crossing is provided as (Attachment 1). This location provides a safe mid-block crossing point to serve both the shopping centre and the Mindarie Primary School.
The process for approval of all traffic signals is detailed in the Main Roads WA (MRWA) Traffic Signals Approval Policy (TSAP).
traffic-signals-approval-policy-network-operations-directorate.pdf
The necessary drawings for the application for Stage 2 approval have been completed by the City’s Consultant and the application has been submitted and is currently being assessed by MRWA Traffic Management Services (TMS) team to ensure that all relevant MRWA design and operation standards are met. Initial feedback from TMS has been provided, with a requested modification to the signal layout. The drawings are currently being modified by the Consultant for resubmission.
The MRWA TSAP Committee meets weekly unless any key personnel are not available, so once the drawings for the Stage 2 application are supported by the MRWA TMS team, then the signals can be considered by the TSAP Committee relatively quickly. Once approved, a Stage 2 TSAP approval is valid for 2 years.
Administration does not have internal expertise to prepare the necessary traffic signal design and drawings required for the Stage 3 TSAP application, so an external Consultant will again need to be engaged. The design drawings will be assessed by the MRWA Assets, Operations and Electrical teams to ensure compliance with their standards. Following their endorsement, the Stage 3 application will be considered by the TSAP Committee. A Stage 3 TSAP approval is also valid for 2 years.
A successful WA State Funded Black Spot application would provide two thirds funding for the installation of the signals and any associated service relocations and lighting upgrades. It is proposed to make an application for funding for signals with Stage 2 approval in the next round of funding applications in July 2026 for funding with construction commencing in the 2027/28 financial year.
Should Council choose to not pursue Black Spot funding, construction of a fully City funded project could commence later in 2026/27 as the Stage 3 work and approval process involves the following tasks and the likely timeframes:
· City to provide modified drawing for Stage 2 approval – end of August 2025
· MRWA consideration of Stage 2 approval – end of September / early October 2025
· Engage external consultants and undertake Stage 3 design – end of February 2026
· MRWA and Western Power approvals – end of June 2026
· Finalise construction documentation and procurement of a construction contract – end of September 2026
· Construction commencement early 2027 subject to MRWA contractor’s availability.
Attachments:
|
1⇩. |
Attachment 1 Location Plan Anchorage Drive Pedestrian Crossing |
25/284418 |
|
MN03-08/25 Cr Berry - Signage to Link Coast Paths in Mindarie
File Ref: 44052V002 – 25/280879
Author: Cr Helen Berry
Action Officer: Director Assets
Disclosure of Interest: Nil
Attachments: 1
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To consider the installation of signage to identify the coastal path route in Mindarie.
Background
Detail
Consultation
Local residents have advised that they are often asked for directions by visitors using the path.
Comment
Signage has been previously requested to assist tourists and others wishing to use the path to know where they can re-join the path. Installing simple signage would save confusion and frustration as it is not obvious and it is very easy to get lost searching. Installing simple signage would assist path users.
Statutory Compliance
Main Roads WA approval is required for all signs and line marking on a shared path.
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
5 ~ A well planned, safe and resilient City that is easy to travel around and provides a connection between people and places
5.4 - People can move around easily
Risk Appetite Statement
In pursuit of strategic objective goal 5, we will accept a Medium level of risk, extended to High in the areas of Community / Reputation & Financial / Commercial impacts. Shifting transport modes and usage in the City may require short term pain for longer term gain as the City supports the development, maintenance and connection of alternatives to car use (e.g. cycle ways) and the supporting infrastructure.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-023 Safety of Community |
Medium |
|
Accountability |
Action Planning Option |
|
Director Community & Place |
Manage |
Policy Implications
Nil
Financial Implications
Installation costs are considered minor in nature and will be funded from the City’s annual maintenance operational budget allocated for minor signage installations throughout the year.
Voting Requirements
Simple Majority
|
Moved Cr Berry, Seconded Cr Bedworth That Council REQUESTS administration to install wayfinding signage on Long Beach Promenade, Anchorage Drive and Rosslare Promenade in Mindarie in the 2025/26 financial year.
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil |
The Burns Beach to Mindarie coastal shared path and the Mindarie to Quinns Beach Coastal Path, together with the concrete shared path connecting them along Longbeach Promenade, Anchorage Drive and Rosslare Promenade form part of the Department of Transport Primary Long-term cycle network route. Currently there is only line marking on the Anchorage Drive and Rosslare Promenade paths to denote the route.
Action 5.5 of the City of Wanneroo Active Transport Plan 2022/23 to 2025/26 is to ‘establish, by implementation of an initial Pilot Project, a wayfinding strategy to promote key active transport routes.’
The City commenced with a pilot wayfinding project following completion of the Church Street shared path project which connects the Wanneroo Town Centre to Rotary Park in Wanneroo. This successfully developed an agreed standard for signage and line marking that meets the requirements for approval by Main Roads WA (MRWA).
As an action within the current Active Transport Plan, Administration will prioritise the design and implementation of a wayfinding signage plan for this route. A plan in accordance with the agreed wayfinding standard will be submitted for approval by MRWA. Once approved, installation will be scheduled for completion ahead of the forthcoming summer period at an estimated cost of $2,000 using existing operational budget funds.
Attachments:
|
1⇩. |
Attachment 1 - Locality map, Mindarie coastal Long-term cycle network – Long Beach Promenade, Anchorage Drive, Rosslare Promenade |
25/283279 |
|
MN04-08/25 Cr Bedworth - Reconsider the proposed location for Changing Places facility in Clarkson
File Ref: 19152V04 – 25/288772
Author: Cr Bedworth
Action Officer: Acting Director Community & Place
Disclosure of Interest: Nil
Attachments: Nil
Changes to Report and Additional Information Arising from Agenda Briefing
This report was not presented or discussed at Agenda Briefing.
Issue
To reconsider the proposed location for a Changing Places facility in Clarkson, with a view to ensuring it best serves the needs of the community it is intended to support.
Background
Council has previously been briefed on a feasibility study that recommended Riverlinks Park as the preferred site for a Changing Places facility in Clarkson. This recommendation was largely based on considerations of existing City-owned land, existing public toilet infrastructure, and cost-effective delivery.
Detail
Changing Places facilities are designed to support individuals with high and complex support needs, enabling them to participate fully in community life. The majority of users are adults who require specialist equipment and accessible environments located near civic, retail, and public transport facilities.
While Riverlinks Park is a well-used community space, its location is more than one kilometre from the core of the Clarkson Town Centre and is not well connected to key services that users of such a facility would typically access. The rationale for co-locating with an adjacent playground is limited, given the nature of the user group, many of whom are unlikely to use the playground or park facilities.
The City’s own experience at Kingsway has demonstrated that early consideration of technical compliance, community needs, and usage patterns is vital to ensuring these facilities are appropriately located and deliver best value. This is an opportunity to apply those lessons to deliver a more accessible, better integrated facility.
This motion seeks to ensure that the City engages more directly with people with lived experience and re-examines alternative sites within the active Clarkson Town Centre that are closer to services and better positioned to support daily participation.
Consultation
Initial consultation was undertaken through the Disability Access and Inclusion Reference Group (DAIRG). While useful, this is not a substitute for wider engagement with carers, service providers and individuals who may rely on such a facility. Additional engagement is recommended.
Comment
This motion seeks to ensure the City's investment delivers the highest value to the community through a location that supports daily participation, not just technical compliance or delivery convenience. The intent is not to delay progress but to ensure that the substantial investment associated with Changing Places delivers the highest community benefit. A facility placed in a less appropriate location risks becoming under-utilised and may not achieve its intended purpose.
This motion provides the opportunity to pause, reassess, and make a more informed and inclusive decision.
Statutory Compliance
Nil
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
ST-S26 Resilient and Productive Communities |
Medium |
|
Accountability |
Action Planning Option |
|
Director Community & Place |
Manage |
The above risk relating to the issue contained within this report has been identified and considered within the City’s Strategic risk register. Action plans are in place to manage this risk.
Policy Implications
Nil.
Financial Implications
No immediate budget impact. However, a revised location may affect timing or capital allocation within the Long Term Financial Plan. These changes should be informed by community consultation and detailed site analysis.
Voting Requirements
Simple Majority
|
Moved Cr Bedworth, Seconded Cr Berry That Council:- 1. REQUESTS that Administration pause progression of the proposed Changing Places facility at Riverlinks Park; 2. REQUESTS further investigation and targeted community engagement to explore alternative locations within the Clarkson Town Centre that better align with accessibility and service needs; 3. REQUESTS Administration to investigate grant and co-funding opportunities, including: a. Commonwealth Accessible Australia / Changing Places funding (up to 50 percent toward build costs); b. Portable Changing Places options (with 40 percent funding support); c. State grants via the WA Department of Communities; d. Additional funding through Lotterywest or other community infrastructure providers; 4. REQUESTS that Administration present a comprehensive report to Council by February 2026 Ordinary Council Meeting, detailing: a. Outcomes of the engagement and site re-assessment; b. Updated cost estimates for each site; c. A clear funding strategy, including efforts to secure Commonwealth, State, and other grant or partnership funding; and 5. REQUESTS Administration list $400,000 in the draft Long Term Financial Plan for a Changing Places facility in the Clarkson Town Centre.
|
|
Moved Cr Herridge, Seconded Cr Parker
Defer Item MN04-08/25 to a Concept Forum for further discussion as soon as possible.
10/4
For the motion: Mayor
Aitken, Cr Coetzee, Cr Figg, Cr Herridge, Cr Miles,
Against the motion: Cr Bedworth, Cr Berry, Cr Moore and Cr Nguyen |
Administration Comment
Riverlinks Park was identified as the most feasible location (from a cost and design perspective) for a Changing Places facility in the Clarkson area, as it would be located on City owned/managed land in reasonably close proximity to the Clarkson Town Centre, and would complement the existing public UAT and toilet facilities associated with the playground area and public open space.
However, it is acknowledged that a location in the Clarkson Town Centre would be a beneficial location given its function as a community hub and destination, and the range of services and facilities located there. The City has limited owned or managed sites in the Town Centre, and initial investigations into site options within the Clarkson Library and Clarkson Youth Centre found high associated costs of retrofitting, and providing associated infrastructure to achieve compliance (such as plumbing, ACROD parking, and access pathways).
There is not currently an active project in the City’s Capital Works Program to construct a Changing Places facility in Clarkson, and no decision has been made in relation to the final location. The needs and feasibility work completed to date was intended to inform the listing of funds in the City’s Long Term Financial Plan for this purpose.
Administration is therefore supportive of this motion, as it will provide the opportunity to engage with private landowners in the Clarkson Town Centre, such as Ocean Keys Shopping Centre, to discuss potential additional site options, determine their willingness to collaborate with the City to deliver a facility of this nature, and investigate suitable grant funding options.
If further suitable sites are identified through discussions with private landowners, Administration would be in a position to review and update its site assessment, and update the proposed listing of a Changing Places facility in the City’s Long-Term Financial Plan.
Attachments: Nil
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Item - MN05-08/25 Cr Berry - Quinns Rocks Sports Club Accessibility - has been moved to another part of the document.
File Ref: 2391 – 25/270905
Author: Cr Wright
Action Officer: Chief Executive Officer
Disclosure of Interest: Nil
Attachments: Nil
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To request a comprehensive review and update of the City of Wanneroo’s Corporate Governance Framework to ensure it reflects current legislative requirements, organisational structures, and provides clear guidance on the hierarchy and purpose of the City's strategic documents.
Background
The City’s Corporate Governance Framework serves as the cornerstone for ensuring accountability, transparency, and ethical conduct in all of the City's operations. The current Framework was last subject to a major review in April 2021, with minor administrative updates in November 2023.
Since the last comprehensive review, the City has undergone several significant changes to its governance structures. These include the establishment of a dedicated Policy Committee, a thorough review of the City’s committees and working groups, and the introduction of a new Council Policy Framework Policy and an Ordinary Council Meetings and Forums of Council Policy.
Furthermore, substantial reforms to the Local Government Act 1995 have been introduced, which necessitate a review of our existing framework to ensure full compliance and alignment with contemporary governance standards.
Detail
A review of the Corporate Governance Framework is required to integrate the recent structural and policy changes within the City. This will ensure that the Framework accurately reflects how the City currently operates and makes decisions. The review must also address the recent amendments to the Local Government Act 1995 to ensure the City’s governance practices are legally compliant.
A key issue that has been a source of confusion for both Council Members and the public is the hierarchy and interplay of the City’s various strategic and planning documents. The updated Corporate Governance Framework must clearly define and differentiate between the various types of documents the City utilises, including:
· Council Policies
· Frameworks
· Guidelines
· Local Laws
· Local Planning Policies
· Management Plans
· Master Plans
· Plans
· Registers
· Strategies
The review should result in a clear, accessible hierarchy that outlines the purpose of each document type, its level of strategic importance, and its specific place within the City’s Integrated Planning and Reporting Framework (IPRF). This will provide much-needed clarity and improve the understanding of how strategic objectives are translated into operational actions and governed.
Consultation
Consultation on this matter has not yet been undertaken. A internal comprehensive consultation process involving Council Members and relevant City employees will be needed.
Comment
The Corporate Governance Framework is a foundational document that guides the conduct and decisions of the Council and the Administration. An effective and up-to-date Framework is essential for maintaining public trust and confidence.
The recent changes to the City’s committees, policies, and the governing legislation mean our current Framework is no longer a complete or accurate reflection of our governance environment. This review will rectify this by creating a modern, clear, and legally compliant document.
By explicitly defining the hierarchy and purpose of all strategic documents, the new Framework will demystify our planning processes for everyone, leading to more informed decision-making and better governance outcomes for the community. This move directly supports our strategic objective of being a well-governed and managed City.
Statutory Compliance
Local Government Act 1995
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
There are no existing Strategic or Corporate risks within the City's existing risk registers which relate to the issues contained in this report.
Policy Implications
This proposal has been assessed under the provisions of the City’s Council Policy Framework Policy.
Financial Implications
The review and drafting of the updated Corporate Governance Framework can be managed within the existing operational budget and resources of the responsible service unit. Any significant changes recommended by the review that carry financial implications will be presented to Council for consideration as part of a future budget process.
Voting Requirements
Simple Majority
|
Moved Cr Wright, Seconded Cr Miles That Council:- 1. REQUESTS the Administration to undertake a comprehensive review of the City of Wanneroo’s Corporate Governance Framework; 2. REQUIRES the revised Corporate Governance Framework to feature a clear hierarchy and definitions for the City’s key strategic document types, including but not limited to, Management Plans, Registers, Plans, Council Policies, Frameworks, Strategies, Local Planning Policies, Local Laws, and Master Plans, and their relationship within the Integrated Planning and Reporting Framework; and 3. REQUESTS that a report presenting the draft revised Corporate Governance Framework be provided to Council for consideration before March 2026. carried 13/1
For the motion: Mayor
Aitken, Cr Berry, Cr Coetzee, Cr Figg, Cr Herridge,
Against the motion: Cr Bedworth |
The Corporate Governance team has a substantial number of strategic and statutory projects scheduled for delivery over the next six months. These projects are critical to ensuring the City’s ongoing compliance, accountability, and continuous improvement, and include:
· Regulation 17 Statutory Audit
· Council Ward Review Procurement
· District Review Consultation Paper
· Facilitation of the 2025 Local Government Elections
· Review of Council Member Inductions
· AARC Operational Management
· Council Policy Review and Implementation for the Service Unit
· Implementation of Standardised Meeting Procedures and Local Government Registers
· Delegated Authority Register
· Compliance Audit Return
Except for the Compliance Audit Return, most of these projects are targeted for completion by 31 December 2025. Collectively, they demonstrate the team’s strong operational focus on meeting statutory deadlines, implementing legislative reforms, and driving excellence in governance.
Given this significant and high-priority workload, delivering a comprehensive review of the City’s Corporate Governance Framework (Framework) with a proposed completion by March 2026 will require additional resources. This review is essential to ensure the Framework remains contemporary, fit-for-purpose, and responsive to evolving governance expectations and legislative changes.
To support quality and timeliness without compromising current commitments, it is proposed that an external consultant be engaged to assist with the Framework review. This approach will allow the City to benefit from specialist expertise, maintain objectivity, and continue advancing its governance maturity.
The Corporate Governance team is high performing and plays a vital role in supporting the City’s legislative obligations and governance leadership. Subject to Council endorsement, the review will be incorporated into the 2025/2026 work program with appropriate resourcing, ensuring both continuity in statutory functions and the successful delivery of a high standard Framework review.
Attachments: Nil
MN07-08/25 Cr Wright - ICT Device Buy Back
File Ref: 2391 – 25/279601
Author: Cr Jordan Wright
Action Officer: Chief Executive Officer
Disclosure of Interest: Nil
Attachments: 2
Changes to Report and Additional Information Arising from Agenda Briefing
Nil
Issue
To consider a one-off Council resolution to authorise the Chief Executive Officer to sell City-provided ICT equipment to current Council Members at market value, prior to the new Council Members Fees Allowances Reimbursements and Benefits Policy (Policy) coming into effect.
Background
The City provides Council Members with ICT equipment for the duration of their term, which is managed under a standard three-year replacement cycle. The Policy currently authorises the CEO to approve the sale of this equipment only to retiring Councillors after the cessation of their term.
This provision creates uncertainty for all Council Members leading into the election period, as we will not allowed to use ICT equipment for electoral purposes or if re-elected. While the Policy is currently under a scheduled review, the outcome will not be finalised before the end of the current term. This motion seeks to provide a temporary and equitable solution for all incumbent member before devices need to be handed back to the City.
Detail
This motion proposes a specific, one-off resolution of Council to grant the Chief Executive Officer the authority to manage the disposal of the current suite of Council Member ICT equipment.
This authorisation would allow the CEO to offer each Councillor the option to purchase their currently assigned device. This action addresses the immediate issue without pre-empting the outcomes of the formal policy review.
To ensure transparency and accountability, the sale price for each device will be its fair market value, as determined by the CEO. This measure is intended to bridge the gap until a new policy is adopted, providing a clear and equitable process for all current members and avoiding any potential disadvantage or uncertainty.
Consultation
No external consultation has been undertaken. This matter arises from correspondence between a Council Member and the Administration regarding the limitations of the current Policy.
Comment
The restrictions within the current policy create unnecessary uncertainty for Councillors regarding the status of their issued devices as the election period approaches. This one-off authorisation provides a simple, fair, and immediate solution for the current Council and the existing set of devices.
It ensures that all members are treated equitably, regardless of their decision to re-stand for election or the subsequent outcome. Authorising the sale at market value is a financially responsible decision that ensures the City receives fair value for its assets.
This resolution provides certainty and avoids disadvantage while the broader policy is being formally reviewed, demonstrating good governance and a practical approach to asset management.
Statutory Compliance
Local Government Act 1995
Local Government (Administration) Regulations 1996
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
CO-O25 Cyber Security |
Medium |
|
Accountability |
Action Planning Option |
|
Director Corporate Strategy & Performance |
Manage |
Policy Implications
This motion does not amend the Council Members' Fees, Allowances, Reimbursements and Benefits Policy. It is a specific resolution of Council to authorise an action as a one-off measure, providing a temporary directive that addresses the limitations of the current Policy.
Financial Implications
The financial impact on the City is neutral to positive. The City will receive revenue from the sale of used assets at a fair market value, which might otherwise be disposed of for a lower value or recycled.
Voting Requirements
Simple Majority
|
Moved Cr Wright, Seconded Cr Miles That Council:- 1. AUTHORISES the Chief Executive Officer to offer for sale the current City-provided ICT equipment to the incumbent Council Members to whom the equipment is currently issued; 2. STIPULATES that the sale price for each item shall be its current market value, as determined by the Chief Executive Officer; and 3. NOTES this authorisation applies to all current ICT equipment currently on loan to Council Members prior to October 2025.
11/3
For the motion: Mayor
Aitken, Cr Berry, Cr Coetzee, Cr Figg, Cr Miles, Cr Moore,
Against the motion: Cr Bedworth, Cr Herridge, Cr Rowe |
Administration does not support the Motion on Notice.
Administration acknowledges that incumbent Council Members may be uncertain about the future access to City issued ICT equipment as the 2025 Local Government Election approaches. However, introducing interim arrangements outside the policy review process may not represent the most efficient outcome.
Should Council resolve to support the recommendations outlined in Cr Wright’s Motion on Notice, Administration recommends the adoption of the following interim measures. These measures are proposed to remain in place until the revised Council Members’ Fees, Allowances, Reimbursements and Benefits Policy is formally adopted by Council:
1. That Council, by resolution, authorises the Chief Executive Officer to offer incumbent Council Members the option to purchase the ICT device currently on loan to them, prior to October 2025, at fair market value in accordance with clause 3.1(a)(vi) of the current Policy.
2. The fair market value of each device will be determined by the Chief Executive Officer, with all proceeds to be credited to the City’s asset disposal revenue.
3. That, prior to transfer, all devices sold under this arrangement will be securely wiped of City data, debranded, and all City-licensed software removed, ensuring compliance with clause 3.6 of the current Policy, which prohibits the use of City-provided equipment for election campaigning.
4. That Council Members who do not opt to purchase their current device may continue using it for the remainder of their term in the usual manner.
Clause 1.4 of the current Council Members’ Fees, Allowances, Reimbursements and Benefits Policy (Attachment 1) requires the City to provide ICT devices to Council Members for official business purposes. Should the proposed arrangement proceed, Administration notes there will be an obligation for the City to issue replacement devices to all Council Members who take up this once off arrangement for their use for Council business for the remainder of their term.
Administration has undertaken a risk assessment in response to the Motion on Notice, which is provided at Attachment 2.
In conclusion, while the interim measures have been developed to mitigate potential risks, Administration maintains that introducing a temporary arrangement immediately prior to a scheduled policy review may not reflect prudent financial management or best practice in the use of public funds. Therefore, Administration recommends that Council await the formal adoption of the revised Policy to ensure a consistent and equitable approach for all Council Members.
Attachments:
|
1⇩. |
Attachment 1 - Council Members’ Fees, Allowances, Reimbursements & Benefits Policy - Current Policy |
20/242764[v3] |
|
|
2⇩. |
Attachment 2 - Risk Assessment - Cr Wright Motion on Notice ICT Device Buy Back |
25/291084 |
|
MN08-08/25 Mayor Aitken - Support of the ORIGINS Program
File Ref: 14553V018 – 25/307616
Author: Mayor Aitken
Action Officer: Chief Executive Officer
Disclosure of Interest: Nil
Attachments: 1
Changes to Report and Additional Information Arising from Agenda Briefing
Report was not presented at the Agenda Briefing.
Issue
To consider the City of Wanneroo (City) advocating to Telethon for the continued support of the ORIGINS project delivered in collaboration by the Joondalup Health Campus and the Kids Research Institute.
Background
ORIGINS is a collaboration between Joondalup Health Campus and The Kids Research Institute Australia and is Australia's largest longitudinal birth cohort study of its kind. Launched in 2017, ORIGINS is following 10,000 families, within the Cities of Joondalup and Wanneroo, (where the majority of diverse families are from the Wanneroo area), from conception into early childhood to determine the early life factors that influence the development of chronic disease.
From birth, ORIGINS participants have generously contributed biological samples - such as stool, urine, hair, and even household dust - while completing yearly questionnaires and attending biannual Kids Check appointments. Together, these contributions help the researchers build a complete picture of the environmental factors shaping the health and wellbeing of Australian families. Today, the ORIGINS Biobank holds more than 400,000 biological samples, and its Data Catalogue contains over 30 million data points, a trove of knowledge driving discoveries for healthier futures.
ORIGINS stands out as one of the only longitudinal studies to embed interventional research at its core. While intervention is often avoided due to concerns about influencing outcomes, ORIGINS embraces it - providing immediate feedback to participants and direct value to the community. This is a significant benefit for those participants located in the City of Wanneroo.
Families benefit from free health checks at four developmental timepoints, with results shared with their general practitioner (GP), alongside free allergy testing and early feedback on developmental milestones. This model allows for timely intervention and specialist referral, ensuring ORIGINS delivers both high-impact research and real-world outcomes.
Detail
The beauty of ORIGINS' longitudinal design is that it only becomes richer and more powerful with time. With long-term core funding, the ORIGINS researchers can continue analysing samples to support vital projects that benefit young families across Australia, follow its participants into their teenage years and adulthood to reveal the full story of how environmental factors shape health, and unlock new frontiers such as genomics. ORIGINS is seeking continued funding to enable sample analyses which includes genomics, epigenetics and microbiome analysis on our longitudinal samples. ORIGINS is confident that this will enable groundbreaking international research where the community will directly benefit. This work has the potential to uncover personalised approaches to intervention, prevention, diagnosis, and treatment, creating healthier futures for generations to come.
The ORIGINS project team is seeking support from the City to advocate for this continued long-term core funding to ensure that the longitudinal study can continue to deliver benefits to Australian families through the research delivered in the Wanneroo and Joondalup region.
More information on the project is contained in Attachment 1.
Consultation
The City has engaged with the ORIGINS project team on this initiative.
Comment
The City is uniquely placed to provide a sound research base for this project given its high growth and birth rate. Ensuring the continuation of the project with a high proportion of participants located in the City provides a strong signal to our community that the City is committed to the wellbeing of its residents.
Statutory Compliance
Nil
Strategic Implications
The proposal aligns with the following objective within the Strategic Community Plan 2021 – 2031:
7 ~ A well governed and managed City that makes informed decisions, provides strong community leadership and valued customer focused services
7.1 - Clear direction and decision making
Risk Appetite Statement
In pursuit of strategic objective goal 7, we will accept a Medium level of risk as the City balances the capacity of the community to fund services through robust cost-benefit analysis and pursues evidence-based decision making to be effective stewards of the Council and City for future generations.
Risk Management Considerations
|
Risk Title |
Risk Rating |
|
ST-S23 Stakeholder Relationships |
Mediu, |
|
Accountability |
Action Planning Option |
|
Chief Executive Officer |
Manage |
The above risk relating to the issue contained in this report have been identified and considered within the City’s Strategic Risk Register. Action plans are in place to manage this risk.
Policy Implications
Nil
Financial Implications
Nil
Voting Requirements
Simple Majority
|
Moved Mayor Aitken, Seconded Cr Rowe That Council REQUESTS the Mayor write a letter to the Telethon Trustees seeking commitment for the ongoing financial support of the ORIGINS longitudinal research project.
14/0
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Nil
|
Administration supports the continued delivery of the ORIGINS research project and agrees that a letter from the Mayor to the Telethon Trustees is worthwhile as it will assist in achieving wellbeing outcomes for the City’s residents.
The continuation of a longitudinal study will have direct benefits to those study participants resident in the City of Wanneroo and the research findings will benefit the wellbeing of Australians generally.
Attachments:
|
1⇩. |
Attachment 1 - ORIGINS 5000 Families Report |
25/307635 |
|
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
Item 10 Urgent Business
Nil
Procedural Motion
Moved Cr Wright, Seconded Cr Seif
That Council move into a confidential session to discuss Item CR03-08/25 **Strategic Land Opportunity - Proposed Acquisition and CR04-08/25 Staff Matter.
Carried
9/1
For the motion: Cr Bedworth, Cr Coetzee, Cr Figg, Cr Herridge, Cr Parker, Cr
Rowe, Cr Seif, Cr Smith and Cr Wright
Against the motion: Cr Nguyen
The meeting was closed to the public and all visual recording ceased at 10:58PM.
File Ref: 51920 – 25/203129
Responsible Officer: Acting Director Corporate Strategy & Performance
This report is to be dealt with in confidential session, under the terms of the Local Government Act 1995 Section 5.23(2), as follows:
(c) a contract entered into, or which may be entered into, by the local government and which relates to a matter to be discussed at the meeting
|
Moved Cr Moore, Seconded Cr Figg
That Council APPROVES by an absolute majority Strategic Land Opportunity - Proposed Acquisition.
CARRIED 12/2
For the motion: Mayor
Aitken, Cr Berry, Cr Coetzee, Cr Figg, Cr Herridge,
Against the motion: Cr Bedworth, Cr Nguyen |
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
CR02-08/25 Staff Matter
File Ref: 2391 – 25/288519
Responsible Officer: Chief Executive Officer
This report is to be dealt with in confidential session, under the terms of the Local Government Act 1995 Section 5.23(2), as follows:
(a) a matter affecting an employee or employees
|
Moved Cr Wright, Seconded Cr Seif
That Council APPROVES by an absolute majority the Staff Matter as detailed in the report.
carried 13/1
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Cr Nguyen |
CITY OF WANNEROO Minutes OF Ordinary Council Meeting 26 August, 2025 0
|
Moved Cr Wright, Seconded Cr Coetzee
That the meeting be reopened to the public at 11:03PM
carried 12/1
For the motion: Mayor
Aitken, Cr Bedworth, Cr Berry, Cr Coetzee, Cr Figg,
Against the motion: Cr Nguyen |
The meeting was reopened to the public and visual recording recommenced at 11:03PM.
Mayor Aitken read aloud the resolutions carried on Item CR01-08/25 **Strategic Land Opportunity - Proposed Acquisition and CR02-08/25 Staff Matter.
The next Agenda Briefing has been scheduled for 6:00PM on 9 September 2025, to be held at Council Chamber, Civic Centre 23 Dundebar Road, Wanneroo.
There being no further business, Mayor Aitken closed the meeting at 11:04PM.
In Attendance
LINDA AITKEN, JP Mayor
Councillors:
ALEX FIGG North Ward
SONET COETZEE North Ward
GLYNIS PARKER North-East Ward
BRONWYN SMITH North-East Ward
MARIZANE MOORE Central-East Ward
PAUL MILES Central-East Ward
HELEN BERRY Central-West Ward
PHIL BEDWORTH Central-West Ward
JORDAN WRIGHT Central Ward
NATALIE HERRIDGE South-West Ward
VINH NGUYEN South-West Ward
JAMES ROWE, JP South Ward
EMAN SEIF, JP South Ward
[1] Payments in respect of attendance does not mean costs to be contributed by the local government to facilitate attendance at the event, but payments by the donor in respect of attendance – see ‘Comment’ below
[2] ‘prescribed’ means prescribed by the Local Government (Administration) Regulations 1996. There has not been any other kind or occasion prescribed in regulations for the purposes of the definition of ‘event’.